18 Terms

1
New cards

Spare parts used in repair work are typically included in the calculation of __________.

Production downtime

2
New cards

How many units of the product were created on 3/11?

- 51

3
New cards

In a production process, the time required to create a finished product is determined by the slowest processing station. The slowest station, often called a __________, therefore limits the maximum rate of production.

- bottleneck

4
New cards

Red tags are used to indicate scrapped parts while a yellow tag indicates a part that __________.

- has been placed on hold

5
New cards

__________ is a method of organizing the production of a similar group of products in a cell, or work cell, that contains all the machines that are needed to produce that group of products.

- Cellular manufacturing

6
New cards

A part that is out-of-spec can either be scrapped or __________.

- reworked to bring the part within the specifications

7
New cards

A system that supplies quality products using a pull system instead of the traditional push system of product flow is __________.

- JIT

8
New cards

Due to the increase in gasoline costs, a part vendor is offsetting his increased delivery costs by increasing the price of all his products 15%. If the cost of the part that you were buying was $18.50/unit, what will it cost after the price increase?

- $21.28/unit

9
New cards

Machine downtime due to component failure results in __________.

- lowering the productivity per labor hour

10
New cards

The accuracy of a time study is improved if you time __________ doing the same job.

- more than one worker

11
New cards

A process's __________ is the rate at which a production system creates a finished product.

- capacity

12
New cards

Machine time, quality requirements, and task time are __________.

- Required documents for a process

13
New cards

The average time a specific job takes is determined by __________.

- time and motion studies

14
New cards

Manufacturing paths are indicated by __________ documents.

- process flow

15
New cards

Reallocation of resources is the best way to __________.

- Increase production if current production cannot meet the demand

16
New cards

On a bill of materials, the __________ indicates which parts form each subassembly.

- part level number

17
New cards

Reducing the amount of non-value work in a process __________.

- is a method of improving the process.

18
New cards

Only the supervisor or a person in the quality assurance department can decide if a part on hold should be __________.

- Scrapped or reworked