operations management
set of activities for planning, controlling, staffing, and designing production systems
production systems must consider
volume, flexibility, and options
Product/process matrix
^
| Project
| Craft
| Batch
| Mass
| Continuous
|________________________________________________________________________
high variability low variability
low volume high volume
Efficacy
degree of achievement
Efficiency
degree of achievement in relation to the cost
Performance indicators to measure efficiency
- productivity
- capacity
- inventory
- product
- quality
- HR policies
break-even point
volume of sales completely covers costs
= FC / (P - VC)
operating leverage (OL) =
= (∆profit/profit) / (∆Q/Q)
PERT chart (Project Evaluation and Review Technic)
- production schedule specifying the sequence of activities, time requirements, and critical path for performing the steps in a project
- shows which activities can be simultaneous
Steps of PERT chart
1. List all activity
2. Consider dependencies
3. Place events and tasks
4. Include time need for each activity
GANTT chart
- Time and activity bar chart that is used for planning, managing, and controlling major programs that have a distinct beginning and end
- used at the beginning of a project
Steps to make a GANTT chart
1. Identify tasks and subtasks
2. Establish connections
3. Create a timeline
4. Order tasks
5. Create template and assign tasks
6. Follow progress