CHAPTER 12 — HOUSE DRAINS AND HOUSE SEWERS quizlet

0.0(0)
Studied by 0 people
call kaiCall Kai
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
GameKnowt Play
Card Sorting

1/33

encourage image

There's no tags or description

Looks like no tags are added yet.

Last updated 9:50 AM on 2/1/26
Name
Mastery
Learn
Test
Matching
Spaced
Call with Kai

No analytics yet

Send a link to your students to track their progress

34 Terms

1
New cards

public or private excreta sewerage system

Every building in which plumbing are installed and every premises having drainage piping thereon, shall have a connection to a _____.

2
New cards

private sewage disposal system

When no public sewer intended to serve any lot or premises is available in any thoroughfare or right~of-way abutting such lot within the premises, drainage piping from any building or works shall be connected to an approved _____.

3
New cards

61 meters

Public sewer is considered not available if sewer is located ____ away from building.

4
New cards

2 ft/s

Minimum velocity of sewer pipe.

5
New cards

excreta drainage system

No rain, surface or subsurface waters shall be connected to or discharged into any _____

6
New cards

excreta building sewer

No cesspool and septic tank effluents, seepage pit or underdrain system shall be connected to the _____ leading to pub!ic sewer main.

7
New cards

private or public sewage disposal system

No commercial food waste grinder shall be connected to a _____ unless permission has first been obtained from the Administrative Authority.

8
New cards

building sewer

The _____, beginning 0.6 meter from outside face of wall of building or structure.

9
New cards

0.15 m diameter; not less than building drain

Minimum size of building sewer.

10
New cards

two (2) percent or 21 mm per meter

Building sewers shall be run in practical alignment at a uniform slope of not less than _____ toward the point of disposal. i.e. to the septic tank or to the street sewer main.

11
New cards

s = 1%. (10.5 mm per meter)

Any building sewer pipe or piping of 102 mm and 152.4 mm in diameter may have a slope not less than _____.

12
New cards

s = 0.5%, (5.3 mm per meter)

building sewer pipe or piping 203 mm diameter and larger may have a slope of not less than _____.

13
New cards

firm bed

Building sewer piping shall be laid on a _________ throughout its entire length.

14
New cards

0.6 meter,

0.3 meter

No building sewer or other drainage piping or part thereof, constructed of materials other than those approved for use underground shall be installed not less than _____ from the outer face of any building foundation or wall, nor less than _____ below the finish surface of the ground.

15
New cards

Cleanouts

____ shall be placed inside the building near the connection between the building drain and the building sewer or installed outside the building at the lower end of the building drain and extended to grade.

16
New cards

15 meter,

135 degrees

Additional building sewer cleanout shall be installed not to exceed _____ on center in straight runs and for each aggregate change in direction exceeding ____________.

17
New cards

3 meters

When a building sewer or a branch thereof does not exceed _____ in length and is a short straight line extension from a building drain which is provided with a cleanout, no cleanout will be required at its point of connection to the building drain.

18
New cards

vertically

Each cleanout shall be installed so that it opens to allow cleaning of horizontal lines in the direction of flow of the soil or waste line or at right angle thereto, and except in the case of wye branch and end-of-line cleanout, shall be installed _____ above the flow line of the pipe.

19
New cards

strong yard boxes

Cleanouts installed under concrete or asphalt paving shall be made accessible by _____________.

20
New cards

91 meters

Approved manholes may be installed in lieu of cleanouts when first approved by the Administrative Authority. The maximum distance between manholes shall not exceed _____.

21
New cards

False - not allowed

T or F: Flexible compression joint shall be embedded in the manhole base.

22
New cards

0.3 m

The bottom of the water pipe at all points, shall be at least_____ above the top of the sewer or drain line.

23
New cards

0.3 meter

The water pipe shall be placed on a solid shelf excavated at one side of the common trench with a minimum clear horizontal distance of at least _____ from the sewer or drain line.

24
New cards

0.3 meter

Water pipes crossing sewer or drainage piping constructed of clay or materials which are not approved for use within a building shall be laid a minimum of_____ clear above the sewer or drain pipe.

25
New cards

3 meters

Water pipe joints shall be installed not less than_____ away from sewer line in both directions.

26
New cards

1.5 meters

Every abandoned building (house) sewer, or part thereof shall be plugged or capped in an approved manner within _____ of the property line.

27
New cards

earth, sand , gravel, concrete

Every cesspool, septic tank or seepage pit which has been abandoned shall have the sewage removed therefrom and be completely filled with ________, ________, ________, ________ or other approved materials.

28
New cards

thirty (30) days

Where Disposal facilities are abandoned consequent to connecting any premises with the public sewer, the permittee making the connection shall fill all abandoned facilities as required by the Administrative Authority within _____ from the time of connecting the sewer service line to the public sewer.

29
New cards

0.6 m

Minimum horizontal distance required from building sewer to building or structures.

30
New cards

Clear

Minimum horizontal distance required from building sewer to property line adjoining private property.

31
New cards

15.2 m

Minimum horizontal distance required from building sewer to water supply wells. Footnote: The distance may be reduced to not less than 7.6 m when the drainage piping is constructed of materials approved for use within a building.

32
New cards

15.2 m

Minimum horizontal distance required from building sewer to streams

33
New cards

0.3 m

Minimum horizontal distance required from building sewer to on-site domestic water service line

34
New cards

0.3 m

Minimum horizontal distance required from building sewer to public water main

Explore top notes

note
Photosynthesis in Higher Plants
Updated 899d ago
0.0(0)
note
AFPF casus 3A
Updated 436d ago
0.0(0)
note
AP Chemistry Review Notes
Updated 331d ago
0.0(0)
note
Market Revolution
Updated 469d ago
0.0(0)
note
Photosynthesis
Updated 560d ago
0.0(0)
note
Romeo and Juliet
Updated 555d ago
0.0(0)
note
Photosynthesis in Higher Plants
Updated 899d ago
0.0(0)
note
AFPF casus 3A
Updated 436d ago
0.0(0)
note
AP Chemistry Review Notes
Updated 331d ago
0.0(0)
note
Market Revolution
Updated 469d ago
0.0(0)
note
Photosynthesis
Updated 560d ago
0.0(0)
note
Romeo and Juliet
Updated 555d ago
0.0(0)

Explore top flashcards

flashcards
Chem - Units 6-10: reactions
58
Updated 887d ago
0.0(0)
flashcards
AP BIO Unit 8 ALL
85
Updated 212d ago
0.0(0)
flashcards
Fluency Fast Vocabulary
30
Updated 1177d ago
0.0(0)
flashcards
Lecture 9
49
Updated 694d ago
0.0(0)
flashcards
AUTENTICO 5A (copy)
67
Updated 1128d ago
0.0(0)
flashcards
Chem - Units 6-10: reactions
58
Updated 887d ago
0.0(0)
flashcards
AP BIO Unit 8 ALL
85
Updated 212d ago
0.0(0)
flashcards
Fluency Fast Vocabulary
30
Updated 1177d ago
0.0(0)
flashcards
Lecture 9
49
Updated 694d ago
0.0(0)
flashcards
AUTENTICO 5A (copy)
67
Updated 1128d ago
0.0(0)