House drain
Is that part of the lowest horizontal piping of a plumbing system which receives the discharges from soil, waste and other drainage pipes inside of a building and conveys it to the house sewer outside of the building.
House Sewer / Building Sewer
Is that part of a plumbing system extending from the house drain at a point 0.60 meters from the outside face of the foundation wall of a building to the junction with the street sewer or to any point of discharge, and conveying the drainage of one building site.
Public sewer
All plumbing and drainage systems or parts thereof on such lot or premises shall be connected with such -
Private Sewage Disposal System
When no public sewer intended to serve any lot or premises is available in any thoroughfare or right-of-way abutting such lot within the premises, drainage piping from any building or works shall be connected to an approved -
Cleanouts
Shall placed inside the building near the connection between the building drain and the building sewer or installed outside the building at the lower end of the building drain and extended to grade.
Administrative Authority
No rain, surface or subsurface waters shall be connected to or discharged into any excreta drainage system, unless first approved by the -
0.6 meter, 0.3 meter
No building sewer or part thereof, constructed of materials other than those approved for use underground shall be installed not less than ____ from the outer face of any building foundation or wall, nor less than ____ below the finish surface of the ground.
15 meter, 135 degrees
Additional building sewer cleanouts shall be installed not to exceed ____ on center in straight runs and for each aggregate change in direction exceeding _____
1.5 meters
Every abandoned building/house sewer, shall be plugged or capped in an approved manner within ____ of the property line.
30
the permittee making the connection shall fill all abandoned facilities as required by the administrative authority within ___ days from the time of connecting the sewer service line to the public sewer