Chapter 12 House Drains and House Sewer

0.0(0)
Studied by 5 people
call kaiCall Kai
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
GameKnowt Play
Card Sorting

1/9

encourage image

There's no tags or description

Looks like no tags are added yet.

Last updated 7:46 AM on 6/18/25
Name
Mastery
Learn
Test
Matching
Spaced
Call with Kai

No analytics yet

Send a link to your students to track their progress

10 Terms

1
New cards

House drain

Is that part of the lowest horizontal piping of a plumbing system which receives the discharges from soil, waste and other drainage pipes inside of a building and conveys it to the house sewer outside of the building.

2
New cards

House Sewer / Building Sewer

Is that part of a plumbing system extending from the house drain at a point 0.60 meters from the outside face of the foundation wall of a building to the junction with the street sewer or to any point of discharge, and conveying the drainage of one building site.

3
New cards

Public sewer

All plumbing and drainage systems or parts thereof on such lot or premises shall be connected with such -

4
New cards

Private Sewage Disposal System

When no public sewer intended to serve any lot or premises is available in any thoroughfare or right-of-way abutting such lot within the premises, drainage piping from any building or works shall be connected to an approved -

5
New cards

Cleanouts

Shall placed inside the building near the connection between the building drain and the building sewer or installed outside the building at the lower end of the building drain and extended to grade.

6
New cards

Administrative Authority

No rain, surface or subsurface waters shall be connected to or discharged into any excreta drainage system, unless first approved by the -

7
New cards

0.6 meter, 0.3 meter

No building sewer or part thereof, constructed of materials other than those approved for use underground shall be installed not less than ____ from the outer face of any building foundation or wall, nor less than ____ below the finish surface of the ground.

8
New cards

15 meter, 135 degrees

Additional building sewer cleanouts shall be installed not to exceed ____ on center in straight runs and for each aggregate change in direction exceeding _____

9
New cards

1.5 meters

Every abandoned building/house sewer, shall be plugged or capped in an approved manner within ____ of the property line.

10
New cards

30

the permittee making the connection shall fill all abandoned facilities as required by the administrative authority within ___ days from the time of connecting the sewer service line to the public sewer

Explore top notes

note
Photosynthesis in Higher Plants
Updated 899d ago
0.0(0)
note
AFPF casus 3A
Updated 436d ago
0.0(0)
note
AP Chemistry Review Notes
Updated 331d ago
0.0(0)
note
Market Revolution
Updated 469d ago
0.0(0)
note
Photosynthesis
Updated 560d ago
0.0(0)
note
Romeo and Juliet
Updated 555d ago
0.0(0)
note
Photosynthesis in Higher Plants
Updated 899d ago
0.0(0)
note
AFPF casus 3A
Updated 436d ago
0.0(0)
note
AP Chemistry Review Notes
Updated 331d ago
0.0(0)
note
Market Revolution
Updated 469d ago
0.0(0)
note
Photosynthesis
Updated 560d ago
0.0(0)
note
Romeo and Juliet
Updated 555d ago
0.0(0)

Explore top flashcards

flashcards
Chem - Units 6-10: reactions
58
Updated 887d ago
0.0(0)
flashcards
AP BIO Unit 8 ALL
85
Updated 212d ago
0.0(0)
flashcards
Fluency Fast Vocabulary
30
Updated 1177d ago
0.0(0)
flashcards
Lecture 9
49
Updated 694d ago
0.0(0)
flashcards
AUTENTICO 5A (copy)
67
Updated 1128d ago
0.0(0)
flashcards
Chem - Units 6-10: reactions
58
Updated 887d ago
0.0(0)
flashcards
AP BIO Unit 8 ALL
85
Updated 212d ago
0.0(0)
flashcards
Fluency Fast Vocabulary
30
Updated 1177d ago
0.0(0)
flashcards
Lecture 9
49
Updated 694d ago
0.0(0)
flashcards
AUTENTICO 5A (copy)
67
Updated 1128d ago
0.0(0)