Transient Binder

0.0(0)
studied byStudied by 0 people
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
Card Sorting

1/3

flashcard set

Earn XP

Description and Tags

This set will focus on Transient Briefing Sheets and guidance afforded to the Crew that could deem testable strategy/direction

Study Analytics
Name
Mastery
Learn
Test
Matching
Spaced

No study sessions yet.

4 Terms

1
New cards

AOP-101 Rapid Power Reduction

Load Targets and Intents

700MWe

400MWe

300MWe

200MWe

700MWe: Remove one MFP from service

400MWe: Remove one CDP from service

300MWe: Remove two MFPs from service

200MWe: Remove Turbine from service

2
New cards

AOP-101 Rapid Power Reduction

Suggested Rates and Motivations

20MWe/min: SGTL reduction <50% within an hour

20MWe/min: Slowly degrading with no stability threat

50MWe/min: Emergent equipment issues that challenge stability

3
New cards

AOP-101 Rapid Power Reduction

Expected Alarms

Reheat Steam ROC Temperatures

Power/Temperature Mismatch

LCO 3.7.2 (no expected steam dump)

MSS-V005 EQ (dumps not armed)

4
New cards

ES-0.1 Reactor Trip Response

Forced Circulation Priorities

Natural Circulation Priorities

Forced:

2,235psig using auto heaters and sprays

SGs at 1,085psig using auto dumps

Natural:

2,000-2,235psig using heaters and aux spray

Tcold band of Current-559F