Quantity Surveying and Cost Estimating (Part I)

0.0(0)
Studied by 0 people
call kaiCall Kai
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
GameKnowt Play
Card Sorting

1/14

encourage image

There's no tags or description

Looks like no tags are added yet.

Last updated 2:41 AM on 4/5/26
Name
Mastery
Learn
Test
Matching
Spaced
Call with Kai

No analytics yet

Send a link to your students to track their progress

15 Terms

1
New cards

Estimate

Approximation projection or prediction of a quantity of work; a statement of the approximate or projected cost of work to be done.

2
New cards

Quantity Survey

Term describing the detailed calculation of all component necessary to construct a building.

3
New cards

Detailed Estimate of Construction Cost

A forecast of construction cost prepared on the basis of a detailed analysis of materials and labor for all items of work.

4
New cards

Bill of Materials

Term used to describe the materials’ sub-components needed to manufacture a finished product

5
New cards

User-unit method

An estimating method, involves the determination of user occupants to quantify space and to establish cost.

6
New cards

Area Method

An estimating method involving costing and quantification using area and multiplier or factor

7
New cards

Volume Method

An estimating method involving the three-dimensional aspect of the project. Is an extension of the area method but involves the height of the building project.

8
New cards

Parametric Method

Involves the identification of several major factors in estimating components of the project each with a corresponding percentage cost.

9
New cards

Modular Cost Method

An estimating method applicable to repetitive work or work made of similar components.

10
New cards

Quantity Survey Method

An estimating method considered to be the most precise of the different types of estimating method. Materials are quantified based parameters.

11
New cards

Combination Method

An estimation method used when the project and the scope of work is incomplete or some area of the project are not clearly defined.

12
New cards

50 pcs

How many 6” CHBs can be produced out of one (1) bag of cement per five (5) bags of sand?

13
New cards

350 psi

The compressive strength of a non-load bearing CHB

14
New cards

750 psi

The compressive strength of a load bearing CHB

15
New cards

12.5 pcs / m²

How many CHBs can fit per m² area?

Explore top notes

note
RPH: Did Rizal Retract?
Updated 1273d ago
0.0(0)
note
Jeopardy: Genetics Review
Updated 401d ago
0.0(0)
note
Chapter 6: A New Nation
Updated 1287d ago
0.0(0)
note
Disasters affect our Biodiversity
Updated 1276d ago
0.0(0)
note
APHUG-All Units
Updated 544d ago
0.0(0)
note
Structure  of an atom
Updated 1187d ago
0.0(0)
note
Chapter 5: Stoichiometry
Updated 1094d ago
0.0(0)
note
RPH: Did Rizal Retract?
Updated 1273d ago
0.0(0)
note
Jeopardy: Genetics Review
Updated 401d ago
0.0(0)
note
Chapter 6: A New Nation
Updated 1287d ago
0.0(0)
note
Disasters affect our Biodiversity
Updated 1276d ago
0.0(0)
note
APHUG-All Units
Updated 544d ago
0.0(0)
note
Structure  of an atom
Updated 1187d ago
0.0(0)
note
Chapter 5: Stoichiometry
Updated 1094d ago
0.0(0)

Explore top flashcards

flashcards
civics vocab 7th
121
Updated 1066d ago
0.0(0)
flashcards
unit 5
98
Updated 1135d ago
0.0(0)
flashcards
AP gov Unit 5
23
Updated 565d ago
0.0(0)
flashcards
Climate and Weather 1
22
Updated 355d ago
0.0(0)
flashcards
Microscopic Pathogens
65
Updated 403d ago
0.0(0)
flashcards
WWI
31
Updated 132d ago
0.0(0)
flashcards
Philosophy Ch. 11-15
50
Updated 726d ago
0.0(0)
flashcards
civics vocab 7th
121
Updated 1066d ago
0.0(0)
flashcards
unit 5
98
Updated 1135d ago
0.0(0)
flashcards
AP gov Unit 5
23
Updated 565d ago
0.0(0)
flashcards
Climate and Weather 1
22
Updated 355d ago
0.0(0)
flashcards
Microscopic Pathogens
65
Updated 403d ago
0.0(0)
flashcards
WWI
31
Updated 132d ago
0.0(0)
flashcards
Philosophy Ch. 11-15
50
Updated 726d ago
0.0(0)