Test Planning
Defining test objective
Test Planning
Deciding how to meet the test objective
Test Monitoring and Control
Checking of test results and logs against coverage criteria
Test Monitoring and Control
Assessing component or system quality based on the test result and logs
Test Monitoring and Control
Determine if more tests are needed
Test Monitoring and Control
Report progress, deviations, and information needed to stop testing
Test Analysis
Analyze the test basis
Test Analysis
Evaluating the test basis and test items to identify defects
Test Analysis
Identify features and sets of features to be tested
Test Analysis
Defining and prioritizing test conditions per feature
Test Design
Test conditions are used to create test cases and testware
Test Design
Decides how to test
Test Design
Identify test data to support test conditions and test cases
Test Design
Design the test environment and required infrastructure and tools
Test Implementation
Create Testware
Test Implementation
Determines “Do we now have everything in place to run tests”
Test Implementation
Developing test procedures
Test Implementation
Create automated test scripts
Test Implementation
Create test suites
Test Implementation
Arrange test suites withing an execution schedule
Test Implementation
Build and verify test environment
Test Implementation
Preparing test data and ensuring it is properly loaded into the test environment
Test Execution
Run test suites in accordance with a test execution schedule
Test Execution
Record the IDs and versions of test items, objects, tools, and wares
Test Execution
Execute tests in the planned sequence
Test Execution
Compare actual with expected results and log anomalies
Test Execution
Analyzing anomalies to find out their causes
Test Execution
Reporting defects based on observed failures
Test Execution
Logging the outcome of test execution
Text Execution
Regression testing
Test Completion
Collect Data
Test Completion
Check if defect reports are closed
Test Completion
Enter change requests for open defect reports
Test Completion
Create a test summary report
Test Completion
Archive test environment, test data, and other testware
Test Completion
Handing over the testware to the maintenance teams
Test Completion
Analyzing lessons learned
Test Completion
Using information gathered to improve test process