It examines internal calculation paths in order to identify bugs.
White box testing
Which of the following relates to the following aspects: analyzability, changeability, stability, and testability?
Software maintainability metrics
These are tests performed by potential users at the developer’s site on a new software package.
Alpha site testing
Which of the following relates to the following aspects: adaptability, installability, coexistence, replaceability?
Software portability metrics
It is performed on relatively small software units, yields higher percentages of identified errors and facilitates correction.
Incremental testing
Software operations are performed internally when the organization operates its software systems and externally when an external software organization provides user support and software maintenance services.
Software operation contract review
This metrics relate to a variety of implementation situations allowing comparison between tasks and teams and between time periods.
Software productivity metrics
It tests the software as a whole once the completed package is available.
Big bang testing
This type of testing identifies bugs only according to software malfunctioning as they are revealed in its erroneous outputs.
Black box testing
Which of the following relates to the following aspects: understandability, learnability, operability, and attractiveness?
Software usability metrics
It is a process for evaluating a documented software project product.
Review
S/he examines the software system from the point of view of the consumer, rather than the designer/supplier.
User representative
S/he provides the rest of the reference material that makes up the inspection package distributed to each inspector
Author
S/he is the system analyst responsible for analyzing the software system reviewed.
Designer
It includes various development and operation reports, such as design reports, test reports, and periodical customer services’ reports.
Relevant documentation
Which of the following is NOT included in the main processes applied by the management in the software operation quality assurance?
Software operation process plan
Which of the following is a classification of software product metrics?
Software attributes metrics
Which of the following is a disadvantage of black box testing?
Lacks control of line coverage
Which of the following is a metrics implementation characteristic?
Immune to biased interventions
Which of the following is NOT a requirement to become a review leader/moderator?
Ensure that the review process is followed and that the other reviewers perform their responsibilities
Which of the following is a disadvantage of the alpha and beta site testing?
Much effort is required to examine reports
Which of the following walkthrough participants of peer review is a specialized professional?
Maintenance Expert
Which of the following is an aspect that relates to software efficiency metrics?
Behavior overtime
Which of the following inspection participants of peer review is NOT a specialized professional?
Moderator
Which of the following is an implementation situation that relates to software effectiveness metrics?
Changes of the original software product
Which of the following testing strategies is a contrary alternative to structural testing?
White box testing
Which of the following is included in the evaluation process performed by the SQA function in the evaluation of project plans for conformance?
Reevaluate the plans for conformance with contract requirements after the plans have been corrected
Which of the following testing strategy is a contrast to incremental testing?
Big bang testing
Which of the following is NOT an advantage of white box testing?
The tester may carry out almost all test classes
Which of the following is NOT a type of software product evaluation activity?
The evaluation of project plans by measurement