TLIC0024 Operate rail traffic with due consideration of route conditions

0.0(0)
studied byStudied by 0 people
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
Card Sorting

1/7

encourage image

There's no tags or description

Looks like no tags are added yet.

Study Analytics
Name
Mastery
Learn
Test
Matching
Spaced

No study sessions yet.

8 Terms

1
New cards

Where are the 4 interface locations with ARC infrastructure?

  1. Woodbridge

  2. Midland

  3. Kenwick

  4. Fremantle

2
New cards

What are the heat restriction speeds for Stage 1, 2, and 3 on the Perth to Midland/Fremantle/Armadale sections?

80, 80, 70km/h

<p>80, 80, 70km/h</p>
3
New cards

What does train service no. 7095AS mean?

………..

4
New cards

What speed should you be doing in Stage 1, 2, and 3 heat restrictions on a curved line with a permanent speed restriction?

Stages 1 and 2: 20km lower than permanent speed, unless speed <= 50km/h

Stage 3: 30km lower than permanent speed, unless speed <= 50km/h

5
New cards

Where a 3-car marker is not available on a platform, 3-car sets must use

4 car markers

6
New cards

Where in Perth City Precinct is unwired (EMUs can’t go)?

from 826 points into Perth Platform 3

7
New cards

Is there any Std gauge track in the Perth City Precinct?

No

8
New cards

At C Depot, what is the process to leave if your train is in a river stow road?

  1. get permission from Depot Master on Claisebrook Channel, then proceed to crossover and call control to depart via 220 signal