1/71
What law governs architecture practice in the Philippines?
Name | Mastery | Learn | Test | Matching | Spaced | Call with Kai |
|---|
No analytics yet
Send a link to your students to track their progress
Architecture Act of 2004
RA 9266 is also known as:
PRC
Who supervises the Board of Architecture?
President
Who appoints members of the Board of Architecture?
70%
Minimum passing average in ALE:
50%
Minimum grade per subject:
2 years
Required experience before exam:
Licensed architect
Who can use the title “Architect”?
License
Which is required for practice?
Plans and documents
Seal must be affixed on:
Continuing Professional Development
CPD refers to:
Signing unsupervised work
Which is NOT allowed?
Fine and imprisonment
Penalty may include:
₱100k–₱5M
Fine range:
6 months–6 years
Imprisonment range:
Oath
Which is required to issue license?
PRC
Which agency maintains registry?
Licensure
Certificate of Registration proves:
3 years
Professional ID validity:
BOA
Who prepares exam questions?
Signing others’ work
Which is grounds for revocation?
Illegal
Practice without license is:
. CHED + BOA
Who regulates education standards?
Licensed and registered
Architect must be:
Planning to construction
Scope includes:
Detailed procedures
IRR provides:
Written
Service agreement must be:
Filipino counterpart
Foreign architect requirement:
Architect
Copyright belongs to:
Illegal
Plans reuse without consent is:
Responsibility
Seal indicates:
15 years
Liability period:
75% architects
Firm ownership requirement:
. Fine/imprisonment
Unauthorized practice penalty:
Offer services
Non-registered person cannot:
Signed and sealed
Plans must be:
Violation
Service without contract is:
Foreign architects
Special permit needed for:
Continuous learning
CPD ensures:
Misrepresentation
Board may revoke license if:
Full design process
Practice includes:
Limited to project
Ownership of documents:
SEC
Architectural firm must register with:
PRC/BOA
Who monitors practice standards?
Conflicts of interest
Architect must disclose:
Name and number
Seal includes:
Law provisions
IRR enforces:
Public welfare
Primary duty of architect
Integrity
Architect must act with:
Unethical
Misrepresentation is:
Prohibited
Accepting bribes is:
Illegal
Plagiarism is:
Unethical
free services without agreement:
Honest practice
Fair competition means:
Factual
Advertising must be:
All stakeholders
Architect should respect:
Unethical
Signing unsupervised plans:
SPP defines:
Services and fees
Schematic Design
First design phase:
Feasibility
. Pre-design includes:
Contractor selection
Bidding phase
Adviser
Architect role:
Site visits
Construction phase includes:
Percentage
Compensation based on PCC:
Fixed fee
Lump sum means:
Meetings/travel
Per diem used for:
Multiple types
Mixed method means:
Construction
Contract documents are used for:
fees
. Project classification affects:
Residential
Group 4 refers to:
Monumental
Group 5 refers to:
Contract docs phase
Architect completes ~90% work at: