Numbered Things in Software Engineering

0.0(0)
studied byStudied by 0 people
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
Card Sorting

1/18

flashcard set

Earn XP

Description and Tags

Ouda MIZ cs4320

Study Analytics
Name
Mastery
Learn
Test
Matching
Spaced

No study sessions yet.

19 Terms

1
New cards

1 in system design issues of the 8

identify design goals

2
New cards

2 in system design issues of the 8

Subsystem Decomposition

3
New cards

3 in system design issues of the 8

Identify Concurrency

4
New cards

4 in system design issues of the 8

Hardware/software mapping

5
New cards

5 in system design issues of the 8

Persistent Data Management

6
New cards

6 in system design issues of the 8

Global Resource Handling

7
New cards

7 in system design issues of the 8

Software Control

8
New cards

8 in system design issues of the 8

Boundary Conditions

9
New cards

What is availability in the context of principal dependability properties?

Te ability of the system to deliver services when requested

10
New cards

What is reliability in the context of principal dependability properties?

The ability of the system to deliver services as specified.

11
New cards

What is safety in the context of principal dependability properties?

The ability of the system to operate without catastrophic failure.

12
New cards

What is security in the context of principal dependability properties?

The ability of the system to protect itself against deliberate or accidental intrusion

13
New cards

What is resilience in the context of principal dependability properties?

The ability of the system to resist and recover from damaging events

14
New cards

What is the first step in evaluating the MOV (Measurable organizational value)

Identify desired area of impact (e.g. Strategic, Customer, financial, Operational, Social)

15
New cards

What is the second step in evaluating the MOV (Measurable organizational value)

Identify desired value of IT project

16
New cards

What is the third step in evaluating the MOV (Measurable organizational value)


Develop an appropriate metric

17
New cards

What is the fourth step in evaluating the MOV (Measurable organizational value)

Set a time frame for achieving MOV

18
New cards

What is the fifth step in evaluating the MOV (Measurable organizational value)


Verify and get agreement from project stakeholders

19
New cards

What is the sixth step in evaluating the MOV (Measurable organizational value)

Summarize in a clear and concise statement.