What do u do when observing a riser?
look for AOCs and determine steel/AL riser
What’s an AOC?
Abnormal Operating Condition
ask for examples and include check for sources of ignition
what identifies the riser as AL?
transition point that include a Crimp, shoulders, or weld
Coating: FBE or Tru Coat
Locate wire
ID Ring (bunny ears)
Sleeve: grey, green, or black
Weed wacker sleeve
How do u know ur electrical test is working?
check tester at electrical panel or any outlet - at least once a day
How many times do leak test the riser and where?
at least 2 times a day (before working on and after the final cleaning)
Above, at, and below service valve and riser 1st soap - anything u clean - 2nd soap
What must u find before u can do any work on an AL riser?
Transition Point
What r the minimum requirements to install a wax pad?
1/2 below crimp, shoulder or weld
1/2 inch of good coating
What does the No Go gauge check for?
Where do u gauge?
checks for metal loss on gas carrying nipple
gauge from the transition point to the bottom of service valve
What makes an AL riser low in earth or paving?
transition point @ or below grade
SLP - transition is at or below grade
SLE - bottom hex of S/C is at or below grade
When do u need to install an MRV?
How much space do u leave between the MRV and Service valve?
install when transition is below grade
1/2 to 1 inch
When applying more than one wax pad where do u start the application?
use bottom up application overlapping 1 inch
When is a composite required?
What is the Min and Max measurement for a Composite installation?
when riser fails gauge and/or has thru wall steel casing corrosion
min: 5 inches - max: 8 inches
Can u composite if there is a by-pass?
no
How much good coating do u need for a composite?
1 inch of good coating
What r u required to do if u find a leak?
take a pic and notify inspector
what r u required to do if u find a steel riser?
take pic and notify inspector
what is the measurement to turn the riser in for shallow service?
Policy: 18 inches
Inland Requirement: 15 inches
what do u do when u find an EFV tag?
remove and replace w/ a new tag when complete
when do u extend the locate wire?
only when installing an MRV
if the riser has failed gauge 360 degrees, what is the next step?
notify inspector for instruction of next steps required
do we inspect risers that have no meter attached?
yes
What must u verify from the contractor?
verify contractor is fluent when talking to customers
verify contractor is proficient using tablet (leak box)
verify contractor is using required PPE (protective equipment)
verify contractor separates trash from hazardous materials