transition point that include a Crimp, shoulders, or weld
Coating: FBE or Tru Coat
Locate wire
ID Ring (bunny ears)
Sleeve: grey, green, or black
Weed wacker sleeve
at least 2 times a day (before working on and after the final cleaning)
Above, at, and below service valve and riser 1st soap - anything u clean - 2nd soap
1/2 below crimp, shoulder or weld
1/2 inch of good coating
What does the No Go gauge check for?
Where do u gauge?
checks for metal loss on gas carrying nipple
gauge from the transition point to the bottom of service valve
transition point @ or below grade
SLP - transition is at or below grade
SLE - bottom hex of S/C is at or below grade
When do u need to install an MRV?
How much space do u leave between the MRV and Service valve?
install when transition is below grade
1/2 to 1 inch
When is a composite required?
What is the Min and Max measurement for a Composite installation?
when riser fails gauge and/or has thru wall steel casing corrosion
min: 5 inches - max: 8 inches
verify contractor is fluent when talking to customers
verify contractor is proficient using tablet (leak box)
verify contractor is using required PPE (protective equipment)
verify contractor separates trash from hazardous materials