Plans and Earthworks

0.0(0)
Studied by 0 people
call kaiCall Kai
Locked
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
GameKnowt Play
Card Sorting

1/25

encourage image

There's no tags or description

Looks like no tags are added yet.

Last updated 7:35 PM on 4/17/26
Name
Mastery
Learn
Test
Matching
Spaced
Call with Kai
Chat

No analytics yet

Send a link to your students to track their progress

26 Terms

1
New cards

Quantity Surveying

the professional practice of managing all costs, contracts and financial aspects of construction project from inception to completion

2
New cards

Quantity Surveyor

known as project financial adviser
- Calculate s material and labor quantities, prepares budgets, manages tender documents, control cost and ensures value for money.

3
New cards

Basic Skills needed for creating accurate estimates in construction and related fields

  1. Understanding of Construction Drawings and Specifications

  2. Measurement and Quantification

  3. Knowledge of Materials and Costs

  4. Mathematical Skills

  5. Analytical Thinking

  6. Use of Estimating Software

  7. Cost Control and Budgeting

  8. Attention to Detail

  9. Communication Skills

  10. Time Management

4
New cards

Perspective Drawing

graphic representation in 3D style of the project showing how it would appear when finished

5
New cards

Location or Vicinity Map

shows the site of the proposed project in relation to major streets in the area

6
New cards

Site Development Plan

designated the outline and measurements of the proposed building and its placement on the property and also shows the proposed improvements

7
New cards

Architectural Plans

show the design of the project

8
New cards

Floor Plan

aerial view of the layout

9
New cards

Roof Plan

view of the roof from above the building

10
New cards

Elevation drawings

they show height and elevation

11
New cards

Section drawings

shows how the structure is to be built in cross sectional views

12
New cards

Detail drawings

enlarged views of some special features of the building

13
New cards

Civil/Structural Plan

set of engineered plans to support architectural plan

14
New cards

Foundation Plan

shows the lowest level of the building

15
New cards

Electrical Plan

engineered drawings for electrical supply and distribution

16
New cards

Plumbing and Sanitary Plan

engineered plans that show the layout for the plumbing system that supplies hot and cold water

17
New cards

Mechanical Plan

engineered plans for motors, pumps, piping systems, and piping equipments

18
New cards

Construction specifications

are detailed written instructions describing the materials, standards, workmanship, and installation procedures required for a project.

19
New cards

Earthwork estimation

involves calculating the volume of soil or rock to be excavated (cut) or filled (embankment) for construction projects

20
New cards

EXCAVATION

The process of moving things like earth, rock or other materials with tools, equipment or explosives.

21
New cards

Backfill

the process of refilling an excavated hole, trench or area around a structure with soil, gravel, or sand to provide stability and support

22
New cards

Fill

sand, soil, gravel or crushed stone added to low areas, excavation, trenches to raise ground levels, stabilize foundations or create a level building site.

23
New cards

Bank Materials

Materials in their natural state

24
New cards

% Swell

the expansion of bank materials causes the soil to assume a larger volume

25
New cards

Loose Materials

uncompacted excavated materials

26
New cards

% Shrinkage

reduction of volume when compaction is applied to the materials