Comprehensive Training for DPWH Field Engineers: Architectural Design

0.0(0)
Studied by 0 people
call kaiCall Kai
Locked
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
GameKnowt Play
Card Sorting

1/21

flashcard set

Earn XP

Description and Tags

Flashcards covering architectural design considerations, building classifications, height limits, setbacks, accessibility laws (BP 344), and the architectural design process based on the DPWH training transcript.

Last updated 7:54 AM on 7/30/26
Name
Mastery
Learn
Test
Matching
Spaced
Call with Kai
Chat

No analytics yet

Send a link to your students to track their progress

22 Terms

1
New cards

Architectural design is the process of shaping spaces and structures to meet human needs while achieving beauty, ________, and purpose.

stability

2
New cards

The 2018 edition of the ________ of the Philippines (P.D. 1096) is a primary reference code for architectural designers.

National Building Code

3
New cards

The law known as the Accessibility Law, which enhances the mobility of disabled persons, is ________.

Batas Pambansa Bilang 344

4
New cards

The Act known as the Comprehensive Fire Code of the Philippines is ________.

RA 9514

5
New cards

According to NBCP Rule VII, Group ________ buildings are classified as Residential Dwellings used for sleeping or living purposes.

A

6
New cards

Group ________ buildings are used for transient accommodation, such as hotels and apartments.

B

7
New cards

Institutional buildings categorized as Group ________ include facilities for care, medical treatment, or detention where occupants need supervision.

D

8
New cards

Group E buildings are used for ________ and Mercantile purposes, such as the transaction of business or sale of merchandise.

Business

9
New cards

Buildings used for the fabrication, assembly, or processing of materials are classified as Group ________.

F

10
New cards

Assembly buildings with an occupant load of ________ or more are classified as Group H.

1000

11
New cards

For commercial buildings with a Road Right of Way (RROW) of 30.00m30.00\,m and above, the required front setback is ________.

8.00m8.00\,m

12
New cards

The Building Height Limit (BHL) for a Residential 1 (R1R-1) structure is ________.

10.00m10.00\,m

13
New cards

A Commercial 3 (C3C-3) building has a Building Height Limit ranging from 16 to 60 storeys or ________.

48.00180.00m48.00-180.00\,m

14
New cards

In the 2024 amendments to the IRR of BP344, ________ nosings are preferred for stairs.

Slanted

15
New cards

If a parking lot has a total of 51-75 slots, the required number of accessible PWD parking slots is ________.

3

16
New cards

A PWD ramp must have a maximum gradient of ________ to meet design regulations.

1:201:20

17
New cards

Handrails on PWD ramps must be installed on both sides at heights of ________ and ________ from the finish ramp level.

900mm900\,mm and 700mm700\,mm

18
New cards

The minimum turning space required for a PWD water closet stall is ________.

1.50×1.50m1.50 \times 1.50\,m

19
New cards

Before starting project plans, proof of land ownership such as a ________ or a Notarized MOA must be established.

Transfer Certificate of Title

20
New cards

The ________ phase of the architectural design process includes activities such as preliminary site analysis.

Pre-Design

21
New cards

The ________ phase involves bubble diagrams and initial zoning of space and functions.

Schematic Design

22
New cards

Coordination between the architect, civil engineer, electrical engineer, and other specialists occurs during the ________ phase.

Design Development