EIA Midterms

0.0(0)
Studied by 0 people
call kaiCall Kai
Locked
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
GameKnowt Play
Card Sorting

1/317

encourage image

There's no tags or description

Looks like no tags are added yet.

Last updated 12:36 AM on 9/24/26
Name
Mastery
Learn
Test
Matching
Spaced
Call with Kai
Chat

No analytics yet

Send a link to your students to track their progress

318 Terms

1
New cards

18th–19th century

Period marked by the Industrial Revolution, when large-scale industrial development greatly increased environmental pressures.

2
New cards

1945–1960s

Period after World War II characterized by a shift toward modernization and accelerated development.

3
New cards

1970s

Period associated with the environmental protection paradigm in the EIA history timeline.

4
New cards

1972: Philippine Economic Development Strategy (PEDS)

Year and Strategy that formed part of the historical background leading to the establishment of the EIA system.

5
New cards

1976 PD 984

Presidential Decree associated with the National Pollution Control Commission.

6
New cards

1977 PD 1151

Presidential Decree establishing the Philippine Environmental Policy.

7
New cards

1977 PD 1152

Presidential Decree establishing the Philippine Environment Code.

8
New cards

1978 PD 1586

Presidential Decree establishing the Philippine Environmental Impact Statement System (PEISS).

9
New cards

1981 PD 2146

Presidential Decree proclaiming Environmentally Critical Areas (ECAs) and Environmentally Critical Projects (ECPs).

10
New cards

2003 DAO 2003-30

DENR Administrative Order containing the Revised Procedural Manual for the Philippine EIA system.

11
New cards

2010 DENR MC 2010-14

Memorandum Circular that standardized EIA requirements with emphasis on thresholds and the Social Development Plan (SDP).

12
New cards

2011 DENR MC 2011-005

Memorandum Circular incorporating Disaster Risk Reduction and Climate Change Adaptation (DRR-CCA) into EIA.

13
New cards

MC 2014-005

Guidelines for Coverage Screening issued in 2014 and used as an operational guide for ECAs, multi-component project categories, and documentary requirements.

14
New cards

Category A

EIA screening category for Environmentally Critical Projects (ECPs).

15
New cards

Category B

EIA screening category for non-environmentally critical projects (NECs/NECPs) located in Environmentally Critical Areas (ECAs).

16
New cards

Category C

Category for projects that enhance the environment or resolve environmental problems.

17
New cards

Category D

Category for projects that are not covered by the PEISS.

18
New cards

Resource extraction; and Wastes and pollutants

The main pathways through which a development project creates environmental pressure.

19
New cards

Carrying capacity

The capacity of a system to sustainably support a population through time.

20
New cards

Overshoot

The condition that occurs when population growth exceeds carrying capacity.

21
New cards

Instability

Fluctuation of population based on carrying capacity.

22
New cards

Degradation

Decline in natural resources caused by increasing demand and excessive environmental pressure.

23
New cards

Environmental Impact Assessment (EIA)

The process of evaluating and predicting the likely impacts of projects, including cumulative impacts, across construction, commissioning, operation, and abandonment.

24
New cards

Construction, Commissioning, Operation, Abandonment

Project stages whose impacts are covered by EIA.

25
New cards

Mitigation and enhancement measures

Measures designed within EIA to reduce unwanted impacts and improve beneficial effects.

26
New cards

Project development cycle

The sequence in which project planning and implementation progress, with EIA inputs entering at different stages.

27
New cards
  1. Project concept

The first main stage of the project development cycle.

28
New cards
  1. Pre-feasibility

The second main stage of the project development cycle.

29
New cards
  1. Feasibility

The third main stage of the project development cycle.

30
New cards
  1. Design and engineering

The fourth main stage of the project development cycle.

31
New cards
  1. Implementation

The fifth main stage of the project development cycle.

32
New cards
  1. Monitoring and evaluation

The sixth main stage of the project development cycle.

33
New cards

Project sponsor / project proponent

One of the participants in EIA who proposes and develops the project.

34
New cards

EIA consultants

Specialists who participate in preparing and conducting the EIA.

35
New cards

Regulatory agencies

Government agencies, including LGUs, that participate in EIA and related permitting.

36
New cards

Community members

Members of the public who may participate in the EIA process.

37
New cards

Socio-civic organizations

Public-interest organizations that may participate in EIA.

38
New cards

Private organizations

Organizations from the private sector that may participate in EIA.

39
New cards

Religious denominations

Religious groups that may participate in EIA.

40
New cards

Advocacy groups

Groups that represent particular environmental or social concerns and may participate in EIA.

41
New cards

Public participation in EIA

A process in which stakeholders participate throughout all stages of the EIA.

42
New cards

Inform

The participation-ladder level using advertising, media, and brochures to provide information.

43
New cards

Consult

The participation-ladder level using public comments, meetings, and group presentations to obtain views.

44
New cards

Involve

The participation-ladder level using workshops and field visits to involve stakeholders directly.

45
New cards

Collaborate

The participation-ladder level using participatory decision-making with stakeholders.

46
New cards

Empower

The participation-ladder level in which decisions are delegated to the community level.

47
New cards

Project impact

A deviation or change from the baseline situation that occurs as a result of a project or investment.

48
New cards

Positive impact

A project impact representing a beneficial change from the baseline situation.

49
New cards

Negative impact

A project impact representing an adverse change from the baseline situation.

50
New cards

Neutral impact

A project impact in which the change is treated as neutral.

51
New cards

Social acceptability

Understanding environmental impacts can help development projects and investments gain ______ _____________

52
New cards

Secondary data collection

Collection of existing information from local and national government agencies, parallel studies, journal articles, maps, and other sources.

53
New cards

Primary data collection

Collection of new field information on biophysical, socio-cultural, and socio-economic conditions.

54
New cards

Biophysical information

Primary information covering flora and fauna, hydrology, geology, land use, climate, soil conditions, and water quality conditions.

55
New cards

Socio-cultural information

Primary information covering demography, customs and traditions, migration, ethnicity, and language.

56
New cards

Socio-economic information

Primary information covering income sources, tenurial instruments, peace and order situation, and mode of transportation.

57
New cards

Physical and chemical environment, Biological environment, Human social environment, Human economic environment

The four facets of the environment.

58
New cards

Environmental reaction

The reaction produced when project pressure or environmental stress acts on the environment.

59
New cards

Avoidance

The strongest option for unwanted impacts in the project's impact-management hierarchy; it seeks to prevent the impact.

60
New cards

Enhancement

An impact-management measure used for beneficial impacts.

61
New cards

Mitigation

An impact-management measure that reduces damage from unwanted impacts.

62
New cards

Compensation

An impact-management measure used when impacts cannot be fully avoided.

63
New cards

Direct impact areas

Areas where project activities directly cause environmental or social changes.

64
New cards

Primary impact areas

Areas receiving the main or immediate environmental effects associated with a project.

65
New cards

Secondary impact areas

Areas affected by indirect or subsequent effects that result from the project and its primary impacts.

66
New cards

Regional impact areas

Areas beyond the immediate project surroundings that may experience impacts extending across a wider region.

67
New cards

Environmental Impact Statement (EIS)

EIA document for a single new project that contains primary environmental baseline data and has a maximum of 250 pages.

68
New cards

Programmatic Environmental Impact Statement (PEIS)

EIA document for a single co-located project or group of co-located projects that contains primary baseline data and carrying capacity information and has a maximum of 350 pages.

69
New cards

Initial Environmental Examination Checklist Report (IEE)

Document using secondary environmental baseline data and including the project description, location, impacts, and management strategies; maximum 75 pages.

70
New cards

Environmental Performance Report and Management Plan (EPRMP)

Document for a single project that is already operating, covering actual environmental impacts and focusing on the effectiveness of current measures; maximum 150 pages.

71
New cards

Programmatic Environmental Performance Report and Management Plan (PEPRMP)

Document covering actual environmental impacts of co-located projects and proposals for expansion, modification, and performance-improvement plans; maximum 200 pages.

72
New cards

Project Description Report (PDR)

Document describing the nature, location, configuration, and use of raw materials and resources of a project; maximum 30 pages.

73
New cards

PEIS page limit

350 pages.

74
New cards

EIS page limit

250 pages.

75
New cards

PEPRMP page limit

200 pages.

76
New cards

EPRMP page limit

150 pages.

77
New cards

IEER page limit

75 pages.

78
New cards

PDR page limit

30 pages.

79
New cards

Annex 2-11

Content outline for the Programmatic Environmental Impact Statement (PEIS), covering pages 149–152.

80
New cards

Annex 2-12

Content outline for the Environmental Impact Statement (EIS), covering pages 153–154.

81
New cards

Annex 2-13

Content outline for the Programmatic Environmental Performance Report and Management Plan (PEPRMP), covering pages 155–156.

82
New cards

Annex 2-14

Content outline for the Environmental Performance Report and Management Plan (EPRMP), covering pages 157–158.

83
New cards

Annex 2-15

Content outline for the Initial Environmental Examination Checklist/Report (IEER/IEE), covering pages 159–160.

84
New cards

Annex 2-16

Content outline for the Project Description Report (PDR), covering page 161.

85
New cards

Proponent

The project applicant, whether private or government.

86
New cards

DENR-EMB Central Office

Category A cases are handled by the ________ _____ _______

87
New cards

DENR-EMB Regional Office

Categories B, C, and D are handled by the ________ _________ ______

88
New cards

LGUs and regulatory agencies in EIA

They handle applications for other permits and clearances.

89
New cards

EIA team

A multidisciplinary group of specialists because EIA covers different environmental and socioeconomic dimensions.

90
New cards

Team Leader

EIA team role that may be filled by an Environmental Scientist or Environmental Planner.

91
New cards

Geologist

EIA team specialist focused on geological and geophysical concerns.

92
New cards

Geophysical specialist

EIA team specialist associated with geophysical assessment.

93
New cards

Biodiversity Specialist

EIA team specialist responsible for flora and fauna concerns.

94
New cards

Hydrologist / Freshwater / Marine Specialist

EIA team specialist covering hydrologic and freshwater or marine concerns.

95
New cards

Air Quality Specialist

EIA team specialist focused on air-quality concerns.

96
New cards

Social Scientist / Sociologist

EIA team specialist focused on social dimensions of the project.

97
New cards

Economist

EIA team specialist focused on economic dimensions.

98
New cards

STEP 2 Project Screening

The step that begins with a thorough and full understanding of the proposed project or investment and determines the applicable documentary requirement.

99
New cards

Programmatic EIS

Required for a new, co-located Category A (ECP) project processed by the EMB Central Office.

100
New cards

EIS

Required for a new, single Category A (ECP) project processed by the EMB Central Office.