Operations and Supply Chain Final Exam

0.0(0)
studied byStudied by 0 people
0.0(0)
full-widthCall Kai
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
GameKnowt Play
Card Sorting

1/54

encourage image

There's no tags or description

Looks like no tags are added yet.

Study Analytics
Name
Mastery
Learn
Test
Matching
Spaced

No study sessions yet.

55 Terms

1
New cards

categories on the goods-services continuum

pure goods, core goods, core services, pure services

2
New cards

weather app on a smartphone is a

pure service

3
New cards

if everything else remains the same, if the revenue or sales decreases, the asset turnover ratio will

decrease

4
New cards

asset turnover ration =

revenue (sales)/total assets

5
New cards

technology push products

start with new technology and look for an appropriate market opportunity

6
New cards

market pull products

there is a market opportunity, so begin product development

7
New cards

core competency

one thing a firm can do better than its competition

8
New cards

5 core supply chain processes

planning sourcing, making, delivering, returning

9
New cards

tier 3 supplier for adidas indy

raw good cotton farmers

10
New cards

productivity

outputs/inputs

11
New cards

when a firm produces a standard item with a stable demand, the reaction rate to differences between actual and forecasted demand would tend to be

small, perhaps just 5-10%

12
New cards

when forecasting for consumer demand, which factor most influences consumer behavior when purchasing specific products

payroll cycle

13
New cards

long range planning

greater than one year

14
New cards

why would AT&T schedule their call centers way over capacity

operators are more productive

15
New cards

diseconomy of scale

when production increases to the point that it becomes difficult to keep the operation’s efficiency

16
New cards

adidas indy’s busiest shipping month is

july

17
New cards

lower learning percentage means

faster learning rate

18
New cards

number one priority for operations managers

safety

19
New cards

boeing 737 jet normally happens under what production process

engineer-to-order

20
New cards

what type of manufacturing layout does adidas indy use

workcenter layout

21
New cards

labor management efficiency is tracked by monitoring metrics on

performance rate and on-standard pctgs

22
New cards

manufacturing center likely to produce the highest variety of products

work centers

23
New cards

high degree customer contact with tight specs

mcdonalds- face to face, but typical routine

24
New cards

low degree customer contact with loose specs

indiana power and light- don’t see customer, each situation is different

25
New cards

cost or price

forms a company’s strategic operational competitive position in their strategic planning

26
New cards

triple bottom line

concept that firms should consider economic prosperity, environmental stweardship, and social responsibility affecting share and stake holders

27
New cards

fabric cut and sew vendors are considered

tier 1 suppliers for adidas indy

28
New cards

the more rapid the growth in exponentional smoothing, the ______ alpha?

higher alpha

29
New cards

polka yokes

built-in tools/procedures to prevent user mistakes

30
New cards

balking

potential customer arrives at a service operation and decides to leave when they see a long line

31
New cards

two things to remember about the US postal service

deliveries are subsidized, deliveries are required to every address

32
New cards

gross national product

not a criterion that influences manufacturing plan or warehouse facility location

33
New cards

kanban squares

marked spaces on a table or the floor that identify where material should be stored

34
New cards

value stream mapping

technique used to identify all of the value-adding/non value-adding processes that materials are subjected to within a plant

35
New cards

five types of waste in a lean system

over-production, excess inventory, poor transportation, scrap, unnecessary motion

36
New cards

how many bottlenecks can a system have at one time

exactly one

37
New cards

what part of the system is Herbie

Drum

38
New cards

what is the goal in the book The Goal

to make money

39
New cards

firms keep supplies of inventory

to meet variation in product demand

40
New cards

the final mile

the last step, delivery method

41
New cards

no final mile for what type of delivery

rail

42
New cards

types of multi-period inventory systems

fixed-order quantity, fixed-time period

43
New cards

DMAIC

acronym that describes the menthodology and chronology of Six Sigma

44
New cards

assignable variation

a deviation in processing output that can be clearly identified and managed

45
New cards

in a forward pick department, what statistical measure of inventory accuracy is the preferred method

unit accuracy

46
New cards

internal failure costs

costs for defectis incurred within the system: scrap, rework, repair

47
New cards

internation port in indiana

Jeffersonville

48
New cards

delphi method

forecasting method that relys on anonomyous expert opinions

49
New cards

capacity utilization rate

= actual output / best operating level

50
New cards

which strategy supports the longest production runs

make to stock

51
New cards

manufacturing process that creates the highest product variety

workcenter

52
New cards

ERP systems are best known as

integrated and modular systems

53
New cards
54
New cards
55
New cards