1/21
Looks like no tags are added yet.
Name | Mastery | Learn | Test | Matching | Spaced |
---|
No study sessions yet.
Preanalytical Time
The time involved in collecting the specimen and preparing samples and instruments.
Analytical Time
The time during which the test is actually performed and the results are calculated.
Postanalytical Time
The time in which the report is made and routine maintenance is performed.
Total (paid) Hours
The total number of hours for which an employee is paid; includes actual time spent in the laboratory as well as benefit hours paid (productive plus nonproductive)
Productive (worked) Hours
The actual hours worked, including overtime.
Nonproductive (benefit) Hours
Hours for which the employee is compensated but not available for work.
Full-Time Equivalent (FTE)
An accounting calculation of the number of full-time employee represented by the payroll hours.
Productivity Model
Workload units divided by labor units.
Billable Procedure
A test for which the laboratory may issue a charge.
Weighted Workload Labor Estimation
A system that assigns a value (usually in a unit defined as 1 minute) to a specific task performed in a standardized manner, obtained by analyzing and timing each step in the production or performance process.
Labor Costs
Represent the largest single item in the laboratory budget.
Technical Evaluation of Labor Cost
the technical approach to labor costs seeks to identify and assign labor costs to the production activities that actually generate the expenses.
What is the formula of Productivity Model
Labor Unit
is a unit of time in minutes or hours.
Expert Opinion
A person knowledgeable in the field makes an estimate of time necessary to perform an activity.
Simulation
A technologist performs a specific test to determine the time needed.
Log (diary) Book
The technologist performs a specific test to determine the time needed.
Time-motion study
A person with special training in management engineering either directly observes the person working or develops special logs where the steps in a process can be recorded, along with the time involved.
Cap Workload System
used time studies to collect the statistics needed to assign weighted unit values.
Determining a WLU(workload units) Value
The WLU assigned to a procedure was based on the specific methodology used to perform the test.
Position Control Master
A detailed list of the authorized positions and the person assigned to each slot is maintained by the person department as a part of the budgeting and hiring process.
✨PASAR LAB MAN✨
✨MANIFESTING✨