Op Management Module 3

0.0(0)
Studied by 0 people
call kaiCall Kai
Locked
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
GameKnowt Play
Card Sorting

1/52

encourage image

There's no tags or description

Looks like no tags are added yet.

Last updated 8:08 PM on 6/28/26
Name
Mastery
Learn
Test
Matching
Spaced
Call with Kai
Chat

No analytics yet

Send a link to your students to track their progress

53 Terms

1
New cards

In the context of operations management, which of the these refers to the assignment of start and completion times to particular jobs, people, or equipment

Scheduling

2
New cards

A requirement of two-resource sequencing rule is that

each job must be processed first on the first resource and then on the second

3
New cards

Each customer order in the cabinet shop was meticulously tracked by employees. They knew who ordered and when the order was placed. They also recorded when the job was promised and delivered. Using the delivery date and the order date, the employees were able to compute

the flow time

4
New cards

A profession office uses an appointment time interval of 15 minutes to schedule customers. What should office staff do if they know a particular customer’s needs exceed this time interval

Use a multiple of 15 minute, like 30 or 45 minutes for this customer

5
New cards

3 customers dropped off their dry cleaning at 8:00 Monday morning, and the operator promised each one a different ready time. The 3rd and final pick-up time was to be 5:30 pm Monday. For 3 jobs, 9.5 hours represents which of the following

Makespan

6
New cards

In a two-resource sequencing problem

the goal is to minimize makespan

7
New cards

IN the context of sequencing, the difference between the completion time and the due date of a job is known as

lateness

8
New cards

Why are front-office operations, like the reception and intake area of an emergency clinic, difficult to schedule in comparison to a manufacturing operation

Because both customers and service providers participate in service creation and delivery

9
New cards

When scheduling staff to match anticipated customer demand, the first step is to

convert customer demand to a capacity measure (i.e. the number of staff required)

10
New cards

Mara, a new assistant professor, eyeballed her teaching assignment for the fall semester She had two section of operation management at 8 am Mon-Wed and Tues-Thurs. This is Mara’s

Schedule

11
New cards

In the context of operations management, triage nurses deciding on the order in which emergency patients are to be treated is an example of

Sequencing

12
New cards

The 4 × 100 meter relay was to begin at 2 pm. At the team breakfast, Coach Fowler told the team the order of the runners. Coach has established a

Sequence

13
New cards

Devin’s scheduling software showed that the customer order wasn’t late, but curiously, the calculated was identical to the lateness. How tardy is the job

0

14
New cards

Bar charts are used to

Monitor planned schedules

15
New cards

In the context of sequencing, the earliest due date (EDD) rule

minimizing the maximum jobs past due

16
New cards

In the context of sequencing, the time needed to process a given set of jobs is called

makespan

17
New cards

In the context of sequencing, the rule that minimizes the average lateness of a set of jobs is the

shortest processing time rule

18
New cards

In the context of sequencing, which of these refers to the amount of time by which the completion time exceeds the due date of a job

tardiness

19
New cards

In the context of sequencing, the shortest processing time (SPT) rule tends to

minimize work-in-process inventory

20
New cards

What is perhaps the most effective way to increase speed and response

Synchronize the entire value chainW

21
New cards

Which of the following is an example of waste is organization

Planned product obsolescence

22
New cards

Lean has a goal of zero waste in all value-creation processes and

all support processes

23
New cards

In the airline industry, short setup and turnaround time translate into

higher asset utilization

24
New cards

WHich of these is focused on ensuring that operating systems will perform their intended function reliably

total productive mantience

25
New cards

Southwest uses only one type of aircraft- the Boeing 737. Which of 5S principles isa t work with this tactic

Standardize

26
New cards

Which type of system produces finished goods inventory is advance of customer demand using a forecast of sales

Push

27
New cards

Geeky Gadgets Company’s suppliers was having a year-end price reduction on a few components on Latoya stucked up on a 6 month supply of one of the sales items. As jeffery was putting them into storage, he wondered whether this was the best use of the firm’s money, citing the Toyata waste of

inventory

28
New cards

Lean is focused on

efficiency by reducing waste and improving process flows

29
New cards

Drive-in -style motors follows a traditional manufacturing systems It produces a fixed number of cars every month. It is now planning to switch to a system of manufacturing where workers go to the source of required pairs and withdraw them based on requirements. In this scenario, which of the following is most likely to occur if they implement this plot

the component parts and subassemblies will be replenished only when needed

30
New cards

Which of the following is a similarity between lean production and Six sigma

Both are driven by customer requirements

31
New cards

Southwest is one of the few airlines encouraging passengers to carry their luggage on the plan which Lean’s wastes is this an example of

Processing

32
New cards

Which system is one in which employees at a given operations go to the source of repaired parts, such an matching in subassembly and withdraw the unit as they need them

A pull system

33
New cards

In comparison with both lean thinking and six sigma, the theory of constraints

is more reliant on value stream mapping and finanical measures

34
New cards

Which action would be considered a process simplification for a service business

Completing forms online before one’s appointment

35
New cards

In the context of the 5s principles, which of these terms refers to ensuring that each item in a workplace is in the its proper place or identified as unnecessary and removed

sort

36
New cards

At southwest airlines all employees cooperate to ensure timely takoffs and landings, even to the points of the pilots helping load luggage what principle does this embody

Single minute exchange of dies (SMED)

37
New cards

In the context of lean tools and approaches which one of the components of the 5s principles renders to a clean work area

shine

38
New cards

Developing formal producers and practices to create consistency in how things are done falls under which 5s

Standardize

39
New cards

Which of the following is not true about lean principles

They are always transferable to front-office services that involve high customer contact

40
New cards

The equation used to calculate the number of Kanban cards required in a system, where o< donotes

a form of safety stock

41
New cards

One difference between six sigma, the theory of constraints and Lean is

six sigma requires a more analytical, measurement driven approach

42
New cards

In the context of lean tools and approaches, which of these are indicators for operating activities that are placed in plain sight of all employees so that everyone can quickly and easily understood the status and performance of the work system

visual contorls

43
New cards

In the context of the 5s principles which of the following means to keep a process going through training communication, and organizational structures

sustain

44
New cards

When queues build up in between process steps, there is more work-in-process inventory and

longer lead times

45
New cards

Which of following is true of push manufacturing system

It leads on high-work-process inventories and high levels of indirect labor and overhead

46
New cards

Six sigma is focused on

effectiveness by reducing errors and defects

47
New cards

Which of these guiding principles would allow a company to ‘go lean”

Doing only what is necessary

48
New cards

Which of the following is a difference between lean production and six sigma

lean production tools are more intuitive and easier to apply by anybody in the workplace, whereas many six sigma tools require advanced training and expertise of specialists

49
New cards

Which of these is a problem that six sigma would address

variations is perfomrance

50
New cards

Quickly changing toolings and fixtures to reduce setup times and achieve higher flexibility and productivity is the principle of

SMED

51
New cards

Which of the following is a flag or a piece of paper that contains all relevant information of ran order such as part number description process area used, time of delivery quantity available production quantity and so on

kanban

52
New cards

In the context of the major categories of waste classified by the Toyota motor company Which of the following is true of overproduction

it ties up production facilities, and the resulting excess inventory simply sits idle

53
New cards