1/9
Looks like no tags are added yet.
Name | Mastery | Learn | Test | Matching | Spaced |
---|
No study sessions yet.
Entry Conditions
How to ensure Reactor is Tripped
(Step 4)
CETs above 870°F Actions
(Step 5 RNO)
Local Processor Cabinets
Visual and Location
Aux. Building Elevation 5 (Near SFP)
CET Assessment
(Steps 5 & 6)
SG WR Level Actions
(Step 8)
a. If <26%: Actuate PRHR, CMT, Containment Isolation
Arm/Actuate Switch Guidance
(Step 9 NOTE)
Squib Valve Blasting Device information
(Attachment 1)
How to Actuate Blasting Device
(Attachment 1)
Overview