ISDS 3115

0.0(0)
Studied by 0 people
call kaiCall Kai
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
GameKnowt Play
Card Sorting

1/42

flashcard set

Earn XP

Description and Tags

Last updated 7:10 PM on 3/9/23
Name
Mastery
Learn
Test
Matching
Spaced
Call with Kai

No analytics yet

Send a link to your students to track their progress

43 Terms

1
New cards
what is slack time?
Slack is the amount of time an activity can be delayed without delaying the entire project.
2
New cards
A project​ organization:
is effective for companies with multiple large projects.
3
New cards
Which of the following statements concerning CPM activities is​ false?
The late finish of an activity is the earliest late start of all preceding activities.
4
New cards
The difference between AON and AOA networks is​ that:
* nodes designate activities in​ AON, while arrows designate activities in AOA.


* AOA networks sometimes require dummy activities.


* both are acceptable in​ practice; however, Microsoft Project uses AON.


* nodes consume no resources or time in AOA networks.
5
New cards
Is it true that, In trend​ projection, a negative regression slope is mathematically impossible?
no
6
New cards
In a regression equation where *​y-hat* is demand and *x* is​ advertising, a coefficient of determination (R^2​) of .70 means that​ 70% of the variance in advertising is explained by demand.
false
7
New cards
Increasing the number of periods in a moving average will accomplish greater​ smoothing, but at the expense​ of:
sensitivity to real changes in the data.
8
New cards
A fundamental distinction between trend projection and linear regression is​ that:
in trend projection the independent variable is​ time; in linear regression the independent variable need not be​ time, but can be any variable with explanatory power.
9
New cards
The production process at Hard Rock Cafe does NOT include which of the following​ activities?
advertising
10
New cards
Which of the following best defines​ scheduling?
Determines and implements​ intermediate- and​ short-term schedules that effectively and efficiently utilize both personnel and facilities while meeting customer demands.
11
New cards
The economic activities that typically produce an intangible product are referred to as:
services
12
New cards
Which of the following does not represent competing on​ response?
based on providing uniqueness
13
New cards
A way to identify those elements in the​ product/service chain that uniquely add value is referred to as
value-chain analysis.
14
New cards
A successful quality strategy begins with
an organizational culture that fosters quality.
15
New cards
Which of the following is NOT a common TQM​ tool?
queuing models
16
New cards
Which of the following would NOT be a concerning pattern on a control​ chart?
All of the above are concerning patterns on a control chart
17
New cards
In acceptance​ sampling, the​ producer's risk is the risk of having a
good lot rejected.
18
New cards
In location​ planning, environmental​ regulations, cost and availability of​ utilities, and taxes​ are:
\n ​regional/community factors.
19
New cards
Which of the following methods best considers intangible costs related to a location​ decision?
factor-rating method
20
New cards
Production and transportation costs are always considered in which of the following location decision​ methods?
transportation model
21
New cards
Geographic information systems can assist the location decision​ by:
combining geography with demographic analysis.
22
New cards
A good layout requires​ determining:
* environment and aesthetics.


* material handling equipment.


* capacity and space requirements.


* cost of moving between various work areas.
23
New cards
Which of the following seeks the best personnel and machine utilization in repetitive or continuous​ production?
product-oriented layout
24
New cards
ASRS stands for which of the​ following?
automated storage and retrieval system
25
New cards
The major problem addressed by the​ process-oriented layout strategy​ is:
minimizing difficulties caused by material flow varying with each product
26
New cards
Which of the following is one of the main advantages of a product−oriented layout?
low variable cost per unit
27
New cards
Which one of the following is NOT common to repetitive and​ product-oriented layouts?
ability to adjust to changes in demand
28
New cards
The disadvantages of​ process-oriented layout come​ from:
the general purpose use of the equipment.
29
New cards
The major problem addressed by the warehouse layout strategy​ is:
addressing trade-offs between space and material handling.
30
New cards
Which of the following is NOT a retail layout​ practice?
all of the above are retail layout practices
31
New cards
The objective of layout strategy is​ to:
develop an effective and efficient layout that will meet the firm’s competitive requirements.
32
New cards
Which of the following statements regarding the​ center-of-gravity method is​ FALSE?
It is designed to minimize the maximum possible travel distance to any of the locations.
33
New cards
Governmental attitudes toward issues such as private​ property, intellectual​ property, zoning,​ pollution, and employment stability may change over time.
political risk
34
New cards
The two popular measures for quantitatively determining if a process is capable are
process capability ratio and process capability index.
35
New cards
One hundred percent inspection
means that every part is checked to see whether or not it is defective.
36
New cards
Which of the following costs is NOT a cost of​ quality?
research & developing
37
New cards
Disney differentiates itself by not simply having customers go on a​ ride, but instead immersing them in the experience. What is the name for this type of​ differentiation?
experience differentiation
38
New cards
Which operations function at a manufacturing facility strives for the efficient use of​ machines, space, and​ personnel?
industrial engineering
39
New cards
The primary purpose of the mean absolute deviation​ (MAD) in forecasting is​ to:
measure forecast accuracy
40
New cards
Which of the following techniques uses variables such as price and promotional​ expenditures, which are related to product​ demand, to predict​ demand?
associative models
41
New cards
The forecasting technique that pools the opinions of a group of experts or managers is known​ as:
jury of executive opinion
42
New cards
The main difference between PERT and CPM is​ that:
PERT employees three time estimates for each activity
43
New cards
Work breakdown structure is a useful tool in project management because it addresses the timing of individual work elements.
false