Lecture Notes Flashcards

0.0(0)
studied byStudied by 0 people
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
Card Sorting

1/18

flashcard set

Earn XP

Description and Tags

Flashcards for exam review.

Study Analytics
Name
Mastery
Learn
Test
Matching
Spaced

No study sessions yet.

19 Terms

1
New cards

Regulations

Requirements imposed by a governmental body that establish government-mandated compliance.

2
New cards

Relative Estimating

A method for creating estimates derived from a comparison against a similar body of work, considering effort, complexity, and uncertainty.

3
New cards

Release

One or more components of one or more products intended to be put into production at the same time.

4
New cards

Release Plan

The plan that sets expectations for the dates, features, and/or outcomes expected to be delivered over the course of multiple iterations.

5
New cards

Release Planning

The process of identifying a high-level plan for releasing or transitioning a product, deliverable, or increment of value.

6
New cards

Report

A formal record or summary of information to satisfy a business need.

7
New cards

Requirement

A condition or capability that is necessary to be present in a product, service, or result.

8
New cards

Requirements Documentation

A record of product requirements and other product information, along with what is recorded to manage it.

9
New cards

Requirements Management Plan

A component of the project or program management plan that describes how requirements will be analyzed, documented, and managed.

10
New cards

Requirements Traceability Matrix

A grid that links product requirements from their origin to the deliverables that satisfy them.

11
New cards

Reserve

A provision in the project management plan to mitigate cost and/or schedule risk.

12
New cards

Reserve Analysis

A method used to evaluate the amount of risk on the project and the amount of schedule and budget reserve to determine whether the reserve is sufficient for the remaining risk.

13
New cards

Resource Breakdown Structure

A hierarchical representation of resources by category and type.

14
New cards

Resource Management Plan

A component of the project management plan that describes how project resources are acquired, allocated, monitored, and controlled.

15
New cards

Responsibility

An assignment that can be delegated within a project management plan such that the assigned resource incurs a duty to perform the requirements of the assignment.

16
New cards

Responsibility Assignment Matrix (RAM)

A grid that shows the project resources assigned to each work package.

17
New cards

Result

An output from performing project management processes and activities; see also deliverable.

18
New cards

Retrospective

A regularly occurring workshop in which participants explore their work and results in order to improve both the process and product.

19
New cards

Rework

Action taken to bring a defective or nonconforming component into compliance with requirements or specifications.