1/760
Looks like no tags are added yet.
Name | Mastery | Learn | Test | Matching | Spaced | Call with Kai | Chat |
|---|
No analytics yet
Send a link to your students to track their progress
The external environment should be arranged to support
human behaviors
the social and cultural goals of site planning support
community, cultural and historic resources, increase safety, increase recreation and access to public services, and minimize negative effects on adjacent properties
the environmental goals of site planning support
consolidate natural resources, protect ecosystems, preserve and encourage biodiversity, reduce pollution, and consider development intensity and location
the economic goals of site planning support
attract investments, dive tourism, increase property value, attract skilled workers, reduce commuting times, promote efficient land use
through effective site planning you can achieve
better public health, safety, protection from natural disasters, reduced construction costs, increased profit, amenities, support for critical ecological processes
the difference between smart growth and sustainable design
Smart growth: addresses development at a regional or city scale, has little direct impact at the site scale
Sustainable Design: addresses design as a regional or city scale but manifests at the site scale
the similarities between smart growth and sustainable design
emphasize pedestrian friendly communities, respect for local context and commitment to socially and environmentally conscious economic development
Smart growth
address development at a regional or city scale and are enacted by government regulatory agencies through comprehensive plans, master plans and zoning code, has little direct impact at the site scale (example: cluster development)
Sustainable design
addresses design as a regional or city scale but manifests at the site scale (example: permeable paving)
Sustainability
meeting the needs of the present without compromising the ability of future generations to meet their own needs
Smart Growth Goals
creating cost effective development solutions, encouraging community and stakeholder collaboration
Sustainable Design Goals
to protect existing environmental resources from degradation and to restore degraded resources
to reuse previously developed sites including brownfields and urban in fill development
to build compact walkable communities
conserve resources at all scales, reduce commuting times regionally and design energy efficient buildings
Site program and what influence each other
site selection, they can lead into a site inventory phase
Steps of the Pre
Design Phase
What does programing determine?
the specific uses for the site, objectives, functional and spatial requirements
Programing both shapes and is shaped by
site selection
program includes
a list of goals and objectives, elements to be included in the design, spatial requirements, for the design to fulfill the
Goals are
general statements of intent for the overall design
Objectives are
specific statements that suggest how goals are going to be accomplished and are thus more action oriented
Program Developments:
Period of research and information gathering used to determine project outcomes and programming studies
Program developments are guided by
market analysis, literature reviews, user demand studies, stakeholder interviews/ surveys, analysis of relevant precedents, client objectives (desired uses, special features, design styles), project budget
Site selection is guided by:
project objectives, project requirements the general location, area, region for desired end use
what are the benefits of a thorough site selection process?
improved site function, greater convenience and access for users, reduced construction costs, reduced maintenance and operational costs, improved aesthetics, reduced environmental impacts
Site selection process
Site programing informs the
site selection criteria and establishes what data needs to be collected during the site inventory process
Urban in
fill and brownfield sites should be
urban in
fill
Brownfield site
previously developed land that is not in use
To develop a brownfield site you need
phase 1: environmental assessment and phase 2: assessment to determine where contaminants are and future land use restriction
Greenfield site
land that is either undeveloped or is currently being used for farmland
Benefits of developing brownfield and urban in fill sites
economic revitalization, providing housing near jobs and services, decreasing automobile use, transit
Site inventory
is a process of documenting various site data.
Site analysis
follows the site inventory, and it requires the landscape architect to interpret the site inventory data to make conclusions relevant to the design process
Inventory is ONLY the act of
collecting data and that any conclusions drawn from it is site data analysis
What is site inventory
identifying communities natural and cultural processes and resources to incorporated them into decision making process by the public
Site inventory is guided by
the site program and selection
Site inventory can cause
another round of site selection or introduce new ideas for the site program
site inventory begins with an initial site reconnaissance collecting
informal assets and abilities of site, in person or using site data
once a site meets basic criteria the next step is to
develop a base map
community resource inventory
wetlands, historic, farm, cultural resources, etc.
scope of project changes base map contents
such as what utilities and data need to be collected, what is relevant to the project
ALTA
American Land Title Association
Contents of a Base map should include:
property boundary, public ROW line, easements, topography, existing buildings, existing utilities, flood zone classifications, adjacent property uses and owners (typ map things: site location map, title info, north arrow, graphic map scale, data sources)
USGS Topographic Maps
United States Geological Survey
USGS maps are used for
large sites and multiple sites considering that they are free
USGS maps include:
topography, township, transportation, infrastructure, rivers, floodplains, wetlands, buildings
PLSS
Public Land Survey System
PLSS
method of building land for the purpose of sale
Units of Land: Townships
6x6sq mile units
Units of Land: Sections
1x1sq mile squares
Units of Land: Quarter sections
60 acres
Which unit of land measurement is primarily used
sections
Quadrangle
largest unit used
Survey Types
ATLA, As
Alta Survey
"title survey"
As
built survey
boundary survey
defines boundaries of a parcel of land, conducted before subdividing, improving, or building on land, incorporated into other scopes of survey (such as ALTA survey)
topographic survey
conducted as part of other survey (ALTA survey normally), also needed for updated topo, include contours with specified interval spot elevations (accurate measurements of specific site elements, vegetation, physical attributes, streams, outcroppings, wooded areas, utilities)
Survey Terms and Techniques: Aerial Photography
documents static, high contrast and large
Survey Terms and Techniques: Backsight
point used to determine the elevation and or angular orientation of the surveying instrument
Survey Terms and Techniques: Bearings
lines that follow the conventions of cardinal directions
Survey Terms and Techniques: Chaining
type of basic surveying in which only linear measurements are made and is suitable for the survey of a small flatish area
Survey Terms and Techniques: Infared Aerial
tracks the growth of vegetation over time, tracks tree diseases, insect damage, supplemented with arborist data
Survey Terms and Techniques: Leveling
process of determining the height of one level reactive to another, used to establish the elevation of a point using other datum
Survey Terms and Techniques: Lidar
light detection and ranging, imaging tech used for aerial site surveys, "see" through vegetation to detect topography and can provide accurate topography with lower cost and shorter period than a field survey
Survey Terms and Techniques: Traversing
survey technique that maps an area of land using a series of interconnected lines, may be considered "open" if it does not form an enclosed area (road) or "closed" if it does (property boundary), lines in a traverse have both a bearing and a distance
Survey Terms and Techniques: Stadia Measurement
Uses upright rod (often 6' in height) to determine horizontal distance
Site Analysis
synthesizes data collected during the site inventory to identify opportunities and constraints for a specific project/ land use, uses data from the base map to determine a sites suitability
Site analysis can cause
a client to reevaluate the proposed program or if program cannot be altered to select a new site
The process of site analysis can be referred to as
suitability analysis (analogous to the site inventory and analysis)
3 Steps of Suitability Analysis
Opportunities and Constraints posed by a specific site and it's associated context shape
the outcomes of the basic goals and objectives set at the beginning
sites and programs are compared with
constraints and oppurtunities
Typical Site inventory
Abiotic Systems
physical systems: soils, topography, geology, hydrology, climate
Biotic Systems
living systems: vegetation and wildlife
Cultural and Human Systems
land use, regulations, legal and financial, utilities, transportation, historical resources, sensory data
Soil Series
group of soils originating from the same parent material and similar soil horizons in the soil profile, primary difference between them being their soil texture
Soil series are usually named after
a nearby geographic feature (town name, etc)
What are soil series divided into
phases
Soil series are divided into phases based on
the difference in texture, name of the phase indicated a feature that affects management
What does the name of a soil series phase indicate
a feature that affects management
Soil horizon
layer parallel to the soil surface whose physical, chemical and biological characteristics differ from the layers above and beneath