TS422_2021 SAP S/4HANA Production Planning and Manufacturing

0.0(0)
studied byStudied by 0 people
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
Card Sorting

1/437

encourage image

There's no tags or description

Looks like no tags are added yet.

Study Analytics
Name
Mastery
Learn
Test
Matching
Spaced

No study sessions yet.

438 Terms

1
New cards

Identify the scrap calculation procedures supported by the system.
There are 3 correct answers to this question.

Component
Assembly
PRT
Operation

component operation and assembly

2
New cards

Which statements accurately describe BOMs?
There are 2 correct answers to this question.

a Phantom assemblies will have the technical type P
b The system will assign a low-level code for each material in the BOM structure.
c The BOM status shows which application areas the BOM can be used in.
d Net ID should be checked if the component is the same as the higher-level assembly.

b The system will assign a low-level code for each material in the BOM structure.
c The BOM status shows which application areas the BOM can be used in.

3
New cards

The procurement type of your material is set to "E" for In-house production. Which of the following is valid to determine a source of supply in SAP S/4HANA?
Choose one:
a purchasing info record
b selection method
c contract
d production version

production version

4
New cards

Which are the possible restrictions of MRP Live?
There are 2 correct answers too this question.
a Using the Advanced planning flag enables select materials in embedded PPDS to be treated separately in MRP Live on SAP HANA.
b Production version only considers the first BOM alternatives for planning in MRP Live on SAP HANA.
c Time-phased planning isn't yet supported in MRP Live on SAP HANA.
d Configurable materials aren't supported in MRP Live on SAP HANA

c Time-phased planning isn't yet supported in MRP Live on SAP HANA.
d Configurable materials aren't supported in MRP Live on SAP HANA

5
New cards

You are using heuristic SAP_ERP_001. Which of the following criteria are included in the automatic source determination logic when a planned order is created?
Please choose the correct answer.
A component availability
B quota arrangement
C delivery date
D costs
E vendor rating

quota arrangement

6
New cards

When the goods receipt for a finished product is posted during confirmation on a manufacturing environment, which of the following actions are also performed by default?
There are 2 correct answers to this question.

a

Staging of components for the next order in the sequence

b

Posting of production costs to cost collector

c

Archiving of backflush documents

d

Reduction of the capacity requirements

b Posting of production costs to cost collector
d Reduction of the capacity requirements

7
New cards

In your plant, MRP is activated. Which options do you have to exclude a material from the MRP run?
There are 2 correct answers to this question.

a

Use a specific MRP controller.

b

Use a specific material group

c

Use a specific material status.

d

Use a specific MRP type.

A Use a specific MRP controller.
D Use a specific MRP type

8
New cards

Production orders are used for what production type?
Please choose the correct answer.

a

Period and quantity-oriented production

b

Process manufacturing processes

c

Discrete manufacturing processes

d

Replenishment controlled by control cycles

D discrete manufacturing processesb

9
New cards

What are the possible results of a production planning run in Advanced Planning (PP/OS)?
There are 3 correct answers to this question.

a

Stock transport order

b

Scheduling agreement schedule line

c

Production order

d

Purchase requisition

e

Planned order

b scheduling agreement schedule line
d purchase requisition
e planned order

10
New cards

You want to represent setup time as a graphical object in the Detailed Scheduling Planning Board. Which actions are needed?
There are 2 correct answers to this question.

a

Run setup minimization heuristics or optimizer.

b

Create and assign a setup matrix with setup transition time to the resource

c

Create and assign setup group/setup keys in the production data structure.

d

Create and assign a new graphical object for setup time in the planning board.

b Create and assign a setup matrix with setup transition time to the resource
d create and assign a new graphical object for setup time in the planning board

11
New cards

You want to procure your material components based on a forecast for the finished material derived from historical sales. When customers order, you produce the finished product and reserve it for that particular order.

Which is the appropriate planning strategy to use?
a) 50 Planning without final assembly
b) 20 Make to order production
c) 30 Production by lot size
d) 40 Planning with final assembly

a) 50 Planning without final assembly

12
New cards

Which warehouse management functions are available in SAP EWM but NOT in SAP WM?


There are 3 correct answers to this question.
a) Handling Unit Management
b) Expected goods receipt
c) Labor Management
d) Yard Management
e) Slotting

b) Expected goods receipt
c) Labor Management
e) Slotting

13
New cards

The settings for MRP can be maintained at different levels. If settings have been maintained in different places, in which sequence does the system search for the MRP settings?

Please choose the correct answer.
a) MRP Group –> Material Master –> Plant Settings
b) Plant Settings –> MRP Group –> Material Master
c) Material Master –> Plant Settings –> MRP Group
d) Material Master –> MRP Group –> Plant Settings

d) Material Master –> MRP Group –> Plant Settings

14
New cards

For which categories can you define bills of materials (BOMs) in SAP S/4HANA?

There are 2 correct answers to this question.
a) Sales Order
b) Document Structure
c) Class
d) Work Center

a) Sales Order
b) Document Structure

15
New cards

Which technological advances enabled the development of SAP S/4HANA as the digital core?

There are 3 correct answers to this question.
a) Big and affordable memory
b) Multi core processors enabling parallelism of tasks
c) Wide adoption of web standards such as Service oriented architecture
d) Advances in the three-tier architecture approach
e) Capability to add to server landscape and scale

b) Multi core processors enabling parallelism of tasks
c) Wide adoption of web standards such as Service oriented architecture
e) Capability to add to server landscape and scale

16
New cards

A customer is considering switching from order-related settlement to product related settlement.

What are capabilities of cost collectors?
There are 2 correct answers to this question.
a) They can be created automatically during month end process.
b) They can be applied to make-to-stock production order.
c) They can be used for manufacturing with collective orders.
d) They can be used for repetitive manufacturing.

b) They can be applied to make-to-stock production order.
d) They can be used for repetitive manufacturing.

17
New cards

Which elements are included in the structure of the batch where-used list?

There are 3 correct answers to this question.
a) Purchase orders
b) Planned orders
c) Transfers from batch to batch
d) Stock transfers
e) Collective orders

a) Purchase orders
c) Transfers from batch to batch
d) Stock transfers

18
New cards

How can Production Planning and Detailed Scheduling (PP/DS) enhance the standard planning functionality?

Please choose the correct answer.
a) By providing multilevel material requirements planning
b) By providing future demands from demand figures in the past
c) By providing cross-plant planning and deployment
d) By providing replenishment proposals with exact times

d) By providing replenishment proposals with exact times

19
New cards

Which of the following apply to MRP Live?

There are 2 correct answers to this question.
a) The BAdIs for classical MRP also apply to MRP Live.
b) The definition of the planning scope is more flexible.
c) The sequence of planning materials is calculated across plants.
d) Planned orders need to be converted to purchase requisitions for externally procured materials

b) The definition of the planning scope is more flexible.
c) The sequence of planning materials is calculated across plants.

20
New cards

You run MRP for a material that was planned using Demand-Driven Replenishment. Towards which buffer level does the MRP run create a replenishment proposal?

Please choose the correct answer.
a) Top of Green
b) Top of Red
c) Top of Yellow
d) Top of Red Base

Top of Green

21
New cards

You are creating a production order manually. What activities are involved in this process?

There are 3 correct answers to this question.
a) Planning selection
b) Master data selection
c) Capacity requirements determination
d) Order type determination
e) Actual cost calculation

b) Master data selection
c) Capacity requirements determination
d) Order type determination

22
New cards

To trigger a goods receipt posting, which Kanban status do you have to set?

Please choose the correct answer.
a) In use
b) Wait
c) Empty
d) Full

d) Full

23
New cards

Which transaction code can you use in SAP S/4HANA to enter and display goods movements?

Please choose the correct answer.
a) MB02
b) MBNL
c) MIGO
d) MMBE

c) MIGO

24
New cards

Which material master data can you copy when you use the Copy Material program (transaction MMCC, Material Master Copier) to create new materials?


There are 2 correct answers to this question.
a) Storage location data
b) Warehouse number data
c) MRP area data
d) Production version data

a) Storage location data
b) Warehouse number data

25
New cards

Which of the following elements does the MRP run take into account?

There are 2 correct answers to this question.
a) Sales orders
b) Planned independent requirements
c) Shipments
d) Material documents

a) Sales orders
b) Planned independent requirements

26
New cards

Advanced Planning is delivered with standard out-of-the-box order and resource evaluations.

Which evaluations are available?
There are 2 correct answers to this question.
a) Resource overview
b) Resource utilization
c) Order list
d) Production list

b) Resource utilization
c) Order list

27
New cards

A material in your company is planned with planning strategy 70 (Planning at assembly level). The consumption mode has been set to backwards with a consumption period of 12 days. Starting from when are the 12 days counted backwards?
Please choose the correct answer.
a) From the planned independent requirement date of the material
b) From the requested delivery date of the related finished good
c) From the availability date of the related finished good
d) From the dependent requirement date of the material

d) From the dependent requirement date of the material

28
New cards

What generates capacity requirements in a process order? Please choose the correct answer.
a) Activities
b) Phases
c) Operations
d) Resources

b) Phases

29
New cards

What are the three layers in the SAP Best Practices Content for SAP S/4HANA?

There are 3 correct answers to this question.
a) Solution Package
b) Scope Items
c) Building Blocks
d) Test Scripts
e) Process Flows

a) Solution Package
b) Scope Items
c) Building Blocks

30
New cards

You set up a material as a phantom assembly by entering the special procurement key in the material master. How can you switch off the phantom assembly in a specific bill of material (BOM)?

A) Change the special procurement key of the phantom assembly in the BOM.

B) Change the explosion type of the phantom assembly in the BOM.

C) Change the phantom item indicator for the phantom assembly in the BOM.

D) Change the item category of the phantom assembly in the BOM.

B) Change the explosion type of the phantom assembly in the BOM.

31
New cards

Which information is required when you created a production master in SAP S/4HANA?
Select 2

a) Selective screen for views
b) Product type
c) Base unit of measure
d) Industry sector

a) Selective screen for views
b) Product type

32
New cards

You want to insert an operation at a certain time on work center. The planning direction is forward. The desired dispatching time coincides with an operation that has previously been dispatched. How does the insertion take place?

A) The previously dispatched operation stays as is; the new operation is inserted after the the dispatched operation.
B) The previously dispatched operation stays as is; the new operation is inserted before the the dispatched operation.
C) The new operation is inserted at the desired time; the previously dispatched operation is moved forward.
D) The new operation is inserted at the desired time; the previously dispatched operation is moved backward.

D) The new operation is inserted at the desired time; the previously dispatched operation is moved backward.

33
New cards

What does it mean for the production planner when MRP works with infinite capacities?

A) MRP assigns capacity requirements automatically after the last scheduled order on a work center.

B) MRP creates capacity requirements without checking the capacity of a work center.

C) MRP assigns capacity requirements automatically to work center is with the earliest available capacity.

D) MRP creates capacity requirements only if the work center has sufficient capacity.

B) MRP creates capacity requirements without checking the capacity of a work center.

34
New cards

What do you use to dispatch operations from planned orders so that the production plan can be fulfilled?


AMaterial Requirements Planning (MRP)

BCapacity Requirements Planning (CRP)

CSupply Network Planning (SNP)

DDemand Planning (DP)

Material Requirements Planning (MRP)

35
New cards

Which chart types does the tabular planning table for capacity planning provide in SAP S/4HANA? Note: There are 2 correct answers to this question.

AOrders (dispatched) chart

BCapacity requirements chart

COrder (pool) chart

DWork center capacities chart

Capacity requirements chart

Work center capacities chart

36
New cards

What are the consequences when you assign a planned order to a production line manually, using the planning table in repetitive manufacturing?

AThe planed order's component availability is checked.

BThe planed order is converted to production order.

CThe planned order's components are copied to the picking list.

DThe planed order generates capacity requirements

The planed order generates capacity requirements

37
New cards

Your project team decides to use a make-to-order planning strategy for strategic in discrete manufacturing. What is the impact of this decision?

choose 3

A Net requirement calculation is sales-order specific.

B A sales-order-specific planning run is required.

C Storage location MRP areas are required.

D Production orders specific stock is created

Net requirement calculation is sales-order specific.
A sales-order-specific planning run is required.
Production orders specific stock is created

38
New cards

What determines whether the planned independent requirements in demand management are consumed by other requirements? Note: There are 2 correct answers to this question.

ARequirements type

BOrder type

CPlanning strategy

DRequirements profile

Requirements type
Planning strategy

39
New cards

How can you achieve a feasible production plan in case of capacity constraints? Note: There are 3 correct answers to this question.

AExecute an infinite production planning run for the critical resources.

BIncrease the capacity supply in a time-phased interval.

CReduce the planning window.

DForm optimum sequences to reduce setup times.

EDetermine a time period with available capacity on the planning board.

B increase the capacity supply in a time-phased interval.

D Form optimum sequences to reduce setup times.

E Determine a time period with available capacity on the planning board.

40
New cards

What is the purpose of a reporting point confirmation in repetitive manufacturing? Note: There are 2 correct answers to this question.

A To determine the work in progress along the production line

B To stage different components for a production line simultaneously

C To provide timely updates of inventory management for the staged components

D To reduce the total production lead time for a long production line

A To determine the work in progress along the production line

C To provide timely updates of inventory management for the staged components

41
New cards

When can consumption of planned independent requirements take place for planning strategy 40 (Planning with final assembly)?

A When you create a sales order

B When you deliver a sales order

C When MRP creates a planned order

D When MRP creates a dependent requirement

A When you create a sales order

42
New cards

You want to use capacity availability checks for production orders. Which settings have to be made for this? Choose 2

A A checking rule must be assigned in the checking control

B The PRT Availability Check must be set in the checking control.

C An overall profile must be assigned in the checking control.

D The Relevant for Finite Scheduling indicator must be set

C An overall profile must be assigned in the checking control.

D The Relevant for Finite Scheduling indicator must be set

43
New cards

Your production planners must execute planning only for specific resources. How can you achive this in advanced Planning(PP/DS)

A Use heuristic.

B Use a resource group.

C Use a propagation range.

D Use a planning group.

A Use heuristic.

44
New cards

Which alternative item strategies are available in bills of material (BOMs) in SAP S/4HANA? Note: There are 2 correct answers to this question.

A Manual maintenance

B Simultaneous

C 100% check

D First in first out (FIFO)

A Manual maintenance

C 100% check

45
New cards

Your company produces a finished good based on a forecast and expects it to be in stock when customers order it. If customers order more than the forecasted quantity, this must NOT have any impact on the production program.Which planning strategy do you use?

A Make-to-order production (20)

B Planning without final assembly (50)

C Make-to-stock production (10)

D Planning with final assembly (40)

D Planning with final assembly (40)

46
New cards

Your project team decides to use a make-to-order planning strategy for a strategic material in discrete manufacturing. What is the impact of this decision? Note: There are 3 correct answers to this question.

A Production orders are created with sales order reference.

B Sales orders have to be ATP-confirmed (available-to-promise) to be saved.

C Net requirements calculation is carried out for every sales order individually.

D Storage location MRP areas are required for sales-order-specific stock.

E Both the reduction of make-to-order stock and requirements occur on delivery.

A Production orders are created with sales order reference.

B Sales orders have to be ATP-confirmed (available-to-promise) to be saved.

C Net requirements calculation is carried out for every sales order individually.

47
New cards

Which time elements are part of a routing operation?
Choose 3

A Pick/pack time

B Float before production

C Queue time

D Wait time

E Move time

A Pick/pack time

C Queue Time

D Wait time

48
New cards

What are the consequences if the Dispatched operation status is set for a production order operation? Choose 2

A You can reschedule the operation using midpoint scheduling in a planning table.

B You can reschedule the operation using finite scheduling in planning table

C You can update the order's status using production order management features.

D You can reschedule the order using infinite scheduling in a planing table

B You can reschedule the operation using finite scheduling in planning table

C You can update the order's status using production order management features.

49
New cards

How can you achieve a feasible production plan in case of capacity constraints?

A Execute an infinite production planning run for the critical resources.

B Increase the capacity supply in a time-phased interval.

C Reduce the planning window.

D Form optimum sequences to reduce setup times.

E Determine a time period with available capacity on the planning board.

B Increase the capacity supply in a time-phased interval.

D Form optimum sequences to reduce setup times.

E Determine a time period with available capacity on the planning board.

50
New cards

Which of the following is used by the MRP Live planning run in SAP S/4HANA?

Net Change Planning

51
New cards

The pegging situation was changed because of an MRP heuristic run. What is a capability of dynamic pegging?

It links receipts from an alternative location in case of a shortage in the default location

52
New cards

In order to use strategy 70 – Planning At Assembly Level, what order field must be set besides the planning strategy?

Individual/Collective Indicator

Dependent Requirements indicator

Mixed MRP indicator

Storage Location MRP Indicator

Mixed MRP indicator

53
New cards

Confirmations for process order are recorder at which level?

Phase Level

54
New cards

How can you avoid order proposals for planned independent requirements with dates in the past?
There are 2 correct answers to this question.


Reorganize planned independent requirements

Use a planning strategy with requirements consumption

Set the requirements reduction indicator in the requirements class

Maintain adjustment parameter in the MRP group

Reorganize planned independent requirements
Maintain adjustment parameter in the MRP group

55
New cards

Which of the following are design principles of SAP Fiori?
There are 2 correct answers to this question.

Coherent

On-premise

Delightful

Complex

Coherent
Delightful

56
New cards

For which data objects do you have to set up CIF integration models in S/4HANA to use them in advanced planning?
There are 2 correct answers to this question.

Work center

Contract

Material master

Production plant

Contract
Production Plant

57
New cards

Which of the following is the main reason for an alternative production method being required for different production lots?
Please choose the correct answer.


Lot size

Efficiency

Validity date

Labor availability

Efficiency

58
New cards

What does the work center hierarchy define in SAP S/4HANA capacity planning?

A group of alternative work centers for production, structured in hierarchy levels by priorities

59
New cards

Which bill of material (BOM) categories can you define in SAP S/4HANA?
There are 2 correct answers to this question

Functional Location BOM

Sales Order BOM

Work Center BOM

Class BOM

Functional Location BOM

Sales Order BOM

60
New cards

Which statements are correct with reference to the Schedule Production app?
There are 3 correct answers to this question.

A

Planning Mode can be selected flexibly between Bucket and Sequence.

B

This app is applicable only for pacemaker or bottleneck work center.

C

You can perform dispatch, deallocate, and reschedule of operations.

D

Only the Chart view is available for this app.

E

You can have more than one work center as a bottleneck work center.

A Planning Mode can be selected flexibly between Bucket and Sequence.
C You can perform dispatch, deallocate, and reschedule of operations.
D Only the Chart view is available for this app.

61
New cards

Capacity Leveling: In which of the following situations is the dispatch of an operation likely to be cancelled?

When the desired dispatching time of an operation coincides with an operation that is already dispatched.

When inserting an operation infinitely fails due to lack of capacity

When there is a critical bottleneck for a work center

When an operation is shifted out of a planning period

When an operation is shifted out of a planning period

62
New cards

With reference to MTO planning strategies, which of the following statements are correct?

Both A and B are correct.

Only answer A is correct.

Rounding values should not be used.

MTO strategies should always be combined with lot-size key EX (lot-for-lot).

Both A and B are correct.

63
New cards

What data can you maintain in the sub items of a bill of material (BOM)?

Installation Point
Quantity

64
New cards

In which data objects do you maintain the production in as the work center for repetitive manufacturing?

Product Version
Routing

65
New cards

What is a typical transportation processing SAP Transportation Management?

Order Management, Transportation Planning, Transportation Execution, Freight Costing and Settlement, Analytics and Reporting

66
New cards

What are some of the SAP Fiori user types?
There are 3 correct answers to this question.

Response:

Business partner

Occasional

Employee

Developer

Expert

Occasional
Developer
Expert

67
New cards

Which of the following items are part of the end-to-end process in Demand-Driven Replenishment?
There are 3 correct answers to this question.

Coupling of Production Lines

Buffer Positioning

Replenishment Planning

Buffer Sizing

Buffer Positioning
Replenishment Planning
Buffer Sizing

68
New cards

Which of the following statements are correct?
There are 2 correct answers to this question.

A

You can only print the shop papers in the background.

B

The shop floor papers are classified as operation-related slips, component-based slips, and multipurpose slips.

C

You can print the papers when the order is in Created status.

D

Original print and reprint are the two modes available for printing.

B The shop floor papers are classified as operation-related slips, component-based slips, and multipurpose slips
D Original print and reprint are the two modes available for printing.

69
New cards

Which are possible replenishment strategies for the supply source of a Kanban control cycle?
There are 3 correct answers to this question.

Response:

A

Subcontracting

B

External procurement

C

Inhouse production

D

Stock transfer

External Procurement
Inhouse Production
Stock Transfer

70
New cards

At which level is scheduling performed?

Resource

71
New cards

What are the possible results of a production planning run in Advanced Planning (PP/OS)?
There are 3 correct answers to this question.

Response:

A

Stock transport order

B

Production order

C

Planned order

D

Purchase requisition

E

Scheduling agreement schedule line

C
D
E

72
New cards

Which of the following statements are true regarding the material master?
There are 2 correct answers to this question.

A

It’s always possible to change the industry sector of a material after you assign it.

B

It’s possible to set the industry sector as default but not possible to set views and organization levels as default.

C

The material type determines the screen sequence, material number assignment, and procurement type.

D

Maintaining the material master is a collective responsibility of different departments in an organization.

C
D

73
New cards

How can SAP S/4HANA support a GMP compliant production process?
There are 3 correct answers to this question.

Response:

A

Documentation of quality data with Quality Management

B

Predefined GMP compliant process order types to meet audit requirements

C

Recipe approval with Engineering Change Management

D

Use of the GMP compliant flag in relevant master data applications

E

Use of the digital signature function to check and run business processes

A
B
C
D

74
New cards

Which of the following statements describe the Schedule Production app?
There are 2 correct answers to this question.

Response:

A

It maintains capacity and raw material constraints to achieve right product mix.

B

It is a straightforward tool for the capacity leveling of planned, production and process orders.

C

It records sales orders to ensure all demands are at the same level of fulfillment.

D

It is specially designed for dispatching orders to pacemaker or bottleneck work centers.

B
D

75
New cards

Before a user can add multiple production versions in a material master, what information should be collected?
There are 3 correct answers to this question.

Response:

A

Task list group number

B

Lot sizes

C

Work center hierarchy

D

BOM status

E

Validity dates

B
D
E

76
New cards

Which of the following belong to production master data in SAP S/4HANA?
There are 2 correct answers to this question.

A

Integrated business planning

B

Planning for discrete manufacturing

C

Period-based planning and production

D

Assembly processing with production order

B
C

77
New cards

Which of the following are optimization criteria for the PP/DS optimization?
There are 3 correct answers to this question.

Makespan

Labor costs

Setup times

Delay costs

Machine robustness

Makespan
Setup times
Delay costs

78
New cards

Which report would you use to display the differences between two BOMs with different change statuses?

BOM comparison

79
New cards

Taking the MRP cockpit as an example - what are key capabilities of SAP S/4HANA’s new user interface?

A

Mobile access

B

System-based decision support

C

On-the-fly simulations

D

Personalization

A,B,C,D

80
New cards

To perform capacity planning for planned orders, which MRP Live run option should be used?

Lead Time scheduling

81
New cards

Which SAP solutions support the supplier area in the portfolio of the Digital Value Network?

SAP Ariba
SAP Field Glass

82
New cards

Which time elements does MRP consider in backward scheduling to determine the order dates for components from dependent requirements?
There are 2 correct answers to this question.

A

Total replenishment lead time

B

Planned delivery time

C

Operation duration

D

In-house production time

B
D

83
New cards

Which material-specific information can be transferred to a transportation lane in PP/DS?
There are 3 correct answers to this question.

A

Production versions

B

Special procurement keys

C

Quota arrangements

D

Outline agreement

E

Purchasing info records

B, D, E

84
New cards

Which of the following controls the engineering workbench (EWB)?

Cockpit

85
New cards

What options does a planner have in the planning table for repetitive manufacturing?
There are 2 correct answers to this question.

Response:

A

Reschedule/deallocate operations.

B

Create new production quantities.

C

Change the assignments of production quantities to production lines.

D

Dispatch operations to work centers.

B,C

86
New cards

Which SAP solutions are part of the Digital Value Network portfolio?

Concur
SAP Hybris
SAP Fieldglass

87
New cards

Which transactional data is required for predictive material and resource planning (pMRP)?

Planned Independent Requirements (PIRs)

88
New cards

Phantom assemblies facilitate ________________.
There are 2 correct answers to this question.

A

simple structuring of BOMs

B

component assignment

C

easy maintenance of the material master

A, B

89
New cards

What are the key aspects of SAP S/4HANA?
There are 2 correct answers to this question.

Response:

A

SAP S/4HANA can be deployed on-premise, in the cloud, or a combination of both.

B

SAP S/4HANA increases the data footprint.

C

SAP S/4HANA has minor changes on data model.

D

SAP S/4HANA is built on SAP HANA

A
D

90
New cards

Which options are available for an SAP S/4HANA deployment?
There are 2 correct answers to this question.

A

SAP S/4AHANA Enterprise Management cloud

B

SAP S/4HANA Professional services cloud

C

SAP S/4HANA private cloud

D

SAP S/4HANA on premise

C
D

91
New cards

The production plan is being disrupted by last minute demands that are entered in the system. Which is the most efficient way to handle last minute demands and protect the current production plan?
There are 2 correct answers to this question.

A

In the stock requirements list, set a manual firming fence for a date based on the replenishment lead time of the material

B

In the material master record, set MRP type to P1 and a planning time fence on the replenishment lead time of the material

C

Manually firm all planned orders for materials within the replenishment lead time of the material

D

In the material master record, set MRP type to P4 and a planning time fence on the replenishment lead time of the material

A
D

92
New cards

How does new Inventory Management Data model contribute to the reduction of the data footpint?
There are 3 correct answers to this question.

A

By eliminating inventory history tables

B

By eliminating fields for different stock types

C

By eliminating inventory tables

D

By eliminating hybrid tables

E

By eliminating material master tables

A
B
C

93
New cards

Which statements regarding material master numbering in SAP S/4HANA are correct?

A

The maximum length of a material is 18 characters for an external number range.

B

A template can be assigned to material numbers but without any additional characters.

C

The maximum length of a material is 18 characters for an internal number range.

D

It's required to activate and acknowledge the extended material length with Transaction FLETS.

E

The material number is unique for a material.

C
D
E

94
New cards

The Mixed MRP indicator is used in conjunction with which of the planning strategies?
There are 2 correct answers to this question.

A

Subassembly planning strategies

B

MTO planning

C

Gross requirements planning

D

Net requirements planning

A
C

95
New cards

In which customizing activity do you set up automatic routing selection for production orders?

Define order-type-dependent parameter

96
New cards

Which of the following are standard forecasting techniques?
There are 3 correct answers to this question.

A

Consumption

B

Exponential smoothing

C

Moving average

D

Value proposition

E

Trend model

B
C
E

97
New cards

Which of the following consists of interoperation times of an operation?
There are 3 correct answers to this question.

A

Wait time

B

Queue time

C

Setup time

D

Move time

E

Processing time

A
B
D

98
New cards

Operations can be rescheduled from a resource to an alternate resource using which of the following ways?
There are 3 correct answers to this question.

A

Manual drag and drop

B

Using a PDS with multiple modes

C

Attaching a production note to the PDS

D

Selecting a different PDS using a heuristic

A
B
D

99
New cards

Which system components can provide Planned Independent Requirement numbers?
There are 3 correct answers to this question

A

SAP Manufacturing Execution

B

SAP S/4HANA Standard SOP

C

SAP Integrated Business Planning

D

SAP APO Demand Planning

B
C
D

100
New cards

Which are the key features of SAP HANA?
There are 3 correct answers to this question.

A

Parallelization

B

In-memory

C

SAP Fiori

D

Compression

A
B
D