1/437
Looks like no tags are added yet.
Name | Mastery | Learn | Test | Matching | Spaced |
---|
No study sessions yet.
Identify the scrap calculation procedures supported by the system.
There are 3 correct answers to this question.
Component
Assembly
PRT
Operation
component operation and assembly
Which statements accurately describe BOMs?
There are 2 correct answers to this question.
a Phantom assemblies will have the technical type P
b The system will assign a low-level code for each material in the BOM structure.
c The BOM status shows which application areas the BOM can be used in.
d Net ID should be checked if the component is the same as the higher-level assembly.
b The system will assign a low-level code for each material in the BOM structure.
c The BOM status shows which application areas the BOM can be used in.
The procurement type of your material is set to "E" for In-house production. Which of the following is valid to determine a source of supply in SAP S/4HANA?
Choose one:
a purchasing info record
b selection method
c contract
d production version
production version
Which are the possible restrictions of MRP Live?
There are 2 correct answers too this question.
a Using the Advanced planning flag enables select materials in embedded PPDS to be treated separately in MRP Live on SAP HANA.
b Production version only considers the first BOM alternatives for planning in MRP Live on SAP HANA.
c Time-phased planning isn't yet supported in MRP Live on SAP HANA.
d Configurable materials aren't supported in MRP Live on SAP HANA
c Time-phased planning isn't yet supported in MRP Live on SAP HANA.
d Configurable materials aren't supported in MRP Live on SAP HANA
You are using heuristic SAP_ERP_001. Which of the following criteria are included in the automatic source determination logic when a planned order is created?
Please choose the correct answer.
A component availability
B quota arrangement
C delivery date
D costs
E vendor rating
quota arrangement
When the goods receipt for a finished product is posted during confirmation on a manufacturing environment, which of the following actions are also performed by default?
There are 2 correct answers to this question.
a | Staging of components for the next order in the sequence |
b | Posting of production costs to cost collector |
c | Archiving of backflush documents |
d | Reduction of the capacity requirements |
b Posting of production costs to cost collector
d Reduction of the capacity requirements
In your plant, MRP is activated. Which options do you have to exclude a material from the MRP run?
There are 2 correct answers to this question.
a | Use a specific MRP controller. |
b | Use a specific material group |
c | Use a specific material status. |
d | Use a specific MRP type. |
A Use a specific MRP controller.
D Use a specific MRP type
Production orders are used for what production type?
Please choose the correct answer.
a | Period and quantity-oriented production |
b | Process manufacturing processes |
c | Discrete manufacturing processes |
d | Replenishment controlled by control cycles |
D discrete manufacturing processesb
What are the possible results of a production planning run in Advanced Planning (PP/OS)?
There are 3 correct answers to this question.
a | Stock transport order |
b | Scheduling agreement schedule line |
c | Production order |
d | Purchase requisition |
e | Planned order |
b scheduling agreement schedule line
d purchase requisition
e planned order
You want to represent setup time as a graphical object in the Detailed Scheduling Planning Board. Which actions are needed?
There are 2 correct answers to this question.
a | Run setup minimization heuristics or optimizer. |
b | Create and assign a setup matrix with setup transition time to the resource |
c | Create and assign setup group/setup keys in the production data structure. |
d | Create and assign a new graphical object for setup time in the planning board. |
b Create and assign a setup matrix with setup transition time to the resource
d create and assign a new graphical object for setup time in the planning board
You want to procure your material components based on a forecast for the finished material derived from historical sales. When customers order, you produce the finished product and reserve it for that particular order.
Which is the appropriate planning strategy to use?
a) 50 Planning without final assembly
b) 20 Make to order production
c) 30 Production by lot size
d) 40 Planning with final assembly
a) 50 Planning without final assembly
Which warehouse management functions are available in SAP EWM but NOT in SAP WM?
There are 3 correct answers to this question.
a) Handling Unit Management
b) Expected goods receipt
c) Labor Management
d) Yard Management
e) Slotting
b) Expected goods receipt
c) Labor Management
e) Slotting
The settings for MRP can be maintained at different levels. If settings have been maintained in different places, in which sequence does the system search for the MRP settings?
Please choose the correct answer.
a) MRP Group –> Material Master –> Plant Settings
b) Plant Settings –> MRP Group –> Material Master
c) Material Master –> Plant Settings –> MRP Group
d) Material Master –> MRP Group –> Plant Settings
d) Material Master –> MRP Group –> Plant Settings
For which categories can you define bills of materials (BOMs) in SAP S/4HANA?
There are 2 correct answers to this question.
a) Sales Order
b) Document Structure
c) Class
d) Work Center
a) Sales Order
b) Document Structure
Which technological advances enabled the development of SAP S/4HANA as the digital core?
There are 3 correct answers to this question.
a) Big and affordable memory
b) Multi core processors enabling parallelism of tasks
c) Wide adoption of web standards such as Service oriented architecture
d) Advances in the three-tier architecture approach
e) Capability to add to server landscape and scale
b) Multi core processors enabling parallelism of tasks
c) Wide adoption of web standards such as Service oriented architecture
e) Capability to add to server landscape and scale
A customer is considering switching from order-related settlement to product related settlement.
What are capabilities of cost collectors?
There are 2 correct answers to this question.
a) They can be created automatically during month end process.
b) They can be applied to make-to-stock production order.
c) They can be used for manufacturing with collective orders.
d) They can be used for repetitive manufacturing.
b) They can be applied to make-to-stock production order.
d) They can be used for repetitive manufacturing.
Which elements are included in the structure of the batch where-used list?
There are 3 correct answers to this question.
a) Purchase orders
b) Planned orders
c) Transfers from batch to batch
d) Stock transfers
e) Collective orders
a) Purchase orders
c) Transfers from batch to batch
d) Stock transfers
How can Production Planning and Detailed Scheduling (PP/DS) enhance the standard planning functionality?
Please choose the correct answer.
a) By providing multilevel material requirements planning
b) By providing future demands from demand figures in the past
c) By providing cross-plant planning and deployment
d) By providing replenishment proposals with exact times
d) By providing replenishment proposals with exact times
Which of the following apply to MRP Live?
There are 2 correct answers to this question.
a) The BAdIs for classical MRP also apply to MRP Live.
b) The definition of the planning scope is more flexible.
c) The sequence of planning materials is calculated across plants.
d) Planned orders need to be converted to purchase requisitions for externally procured materials
b) The definition of the planning scope is more flexible.
c) The sequence of planning materials is calculated across plants.
You run MRP for a material that was planned using Demand-Driven Replenishment. Towards which buffer level does the MRP run create a replenishment proposal?
Please choose the correct answer.
a) Top of Green
b) Top of Red
c) Top of Yellow
d) Top of Red Base
Top of Green
You are creating a production order manually. What activities are involved in this process?
There are 3 correct answers to this question.
a) Planning selection
b) Master data selection
c) Capacity requirements determination
d) Order type determination
e) Actual cost calculation
b) Master data selection
c) Capacity requirements determination
d) Order type determination
To trigger a goods receipt posting, which Kanban status do you have to set?
Please choose the correct answer.
a) In use
b) Wait
c) Empty
d) Full
d) Full
Which transaction code can you use in SAP S/4HANA to enter and display goods movements?
Please choose the correct answer.
a) MB02
b) MBNL
c) MIGO
d) MMBE
c) MIGO
Which material master data can you copy when you use the Copy Material program (transaction MMCC, Material Master Copier) to create new materials?
There are 2 correct answers to this question.
a) Storage location data
b) Warehouse number data
c) MRP area data
d) Production version data
a) Storage location data
b) Warehouse number data
Which of the following elements does the MRP run take into account?
There are 2 correct answers to this question.
a) Sales orders
b) Planned independent requirements
c) Shipments
d) Material documents
a) Sales orders
b) Planned independent requirements
Advanced Planning is delivered with standard out-of-the-box order and resource evaluations.
Which evaluations are available?
There are 2 correct answers to this question.
a) Resource overview
b) Resource utilization
c) Order list
d) Production list
b) Resource utilization
c) Order list
A material in your company is planned with planning strategy 70 (Planning at assembly level). The consumption mode has been set to backwards with a consumption period of 12 days. Starting from when are the 12 days counted backwards?
Please choose the correct answer.
a) From the planned independent requirement date of the material
b) From the requested delivery date of the related finished good
c) From the availability date of the related finished good
d) From the dependent requirement date of the material
d) From the dependent requirement date of the material
What generates capacity requirements in a process order? Please choose the correct answer.
a) Activities
b) Phases
c) Operations
d) Resources
b) Phases
What are the three layers in the SAP Best Practices Content for SAP S/4HANA?
There are 3 correct answers to this question.
a) Solution Package
b) Scope Items
c) Building Blocks
d) Test Scripts
e) Process Flows
a) Solution Package
b) Scope Items
c) Building Blocks
You set up a material as a phantom assembly by entering the special procurement key in the material master. How can you switch off the phantom assembly in a specific bill of material (BOM)?
A) Change the special procurement key of the phantom assembly in the BOM.
B) Change the explosion type of the phantom assembly in the BOM.
C) Change the phantom item indicator for the phantom assembly in the BOM.
D) Change the item category of the phantom assembly in the BOM.
B) Change the explosion type of the phantom assembly in the BOM.
Which information is required when you created a production master in SAP S/4HANA?
Select 2
a) Selective screen for views
b) Product type
c) Base unit of measure
d) Industry sector
a) Selective screen for views
b) Product type
You want to insert an operation at a certain time on work center. The planning direction is forward. The desired dispatching time coincides with an operation that has previously been dispatched. How does the insertion take place?
A) The previously dispatched operation stays as is; the new operation is inserted after the the dispatched operation.
B) The previously dispatched operation stays as is; the new operation is inserted before the the dispatched operation.
C) The new operation is inserted at the desired time; the previously dispatched operation is moved forward.
D) The new operation is inserted at the desired time; the previously dispatched operation is moved backward.
D) The new operation is inserted at the desired time; the previously dispatched operation is moved backward.
What does it mean for the production planner when MRP works with infinite capacities?
A) MRP assigns capacity requirements automatically after the last scheduled order on a work center.
B) MRP creates capacity requirements without checking the capacity of a work center.
C) MRP assigns capacity requirements automatically to work center is with the earliest available capacity.
D) MRP creates capacity requirements only if the work center has sufficient capacity.
B) MRP creates capacity requirements without checking the capacity of a work center.
What do you use to dispatch operations from planned orders so that the production plan can be fulfilled?
AMaterial Requirements Planning (MRP)
BCapacity Requirements Planning (CRP)
CSupply Network Planning (SNP)
DDemand Planning (DP)
Material Requirements Planning (MRP)
Which chart types does the tabular planning table for capacity planning provide in SAP S/4HANA? Note: There are 2 correct answers to this question.
AOrders (dispatched) chart
BCapacity requirements chart
COrder (pool) chart
DWork center capacities chart
Capacity requirements chart
Work center capacities chart
What are the consequences when you assign a planned order to a production line manually, using the planning table in repetitive manufacturing?
AThe planed order's component availability is checked.
BThe planed order is converted to production order.
CThe planned order's components are copied to the picking list.
DThe planed order generates capacity requirements
The planed order generates capacity requirements
Your project team decides to use a make-to-order planning strategy for strategic in discrete manufacturing. What is the impact of this decision?
choose 3
A Net requirement calculation is sales-order specific.
B A sales-order-specific planning run is required.
C Storage location MRP areas are required.
D Production orders specific stock is created
Net requirement calculation is sales-order specific.
A sales-order-specific planning run is required.
Production orders specific stock is created
What determines whether the planned independent requirements in demand management are consumed by other requirements? Note: There are 2 correct answers to this question.
ARequirements type
BOrder type
CPlanning strategy
DRequirements profile
Requirements type
Planning strategy
How can you achieve a feasible production plan in case of capacity constraints? Note: There are 3 correct answers to this question.
AExecute an infinite production planning run for the critical resources.
BIncrease the capacity supply in a time-phased interval.
CReduce the planning window.
DForm optimum sequences to reduce setup times.
EDetermine a time period with available capacity on the planning board.
B increase the capacity supply in a time-phased interval.
D Form optimum sequences to reduce setup times.
E Determine a time period with available capacity on the planning board.
What is the purpose of a reporting point confirmation in repetitive manufacturing? Note: There are 2 correct answers to this question.
A To determine the work in progress along the production line
B To stage different components for a production line simultaneously
C To provide timely updates of inventory management for the staged components
D To reduce the total production lead time for a long production line
A To determine the work in progress along the production line
C To provide timely updates of inventory management for the staged components
When can consumption of planned independent requirements take place for planning strategy 40 (Planning with final assembly)?
A When you create a sales order
B When you deliver a sales order
C When MRP creates a planned order
D When MRP creates a dependent requirement
A When you create a sales order
You want to use capacity availability checks for production orders. Which settings have to be made for this? Choose 2
A A checking rule must be assigned in the checking control
B The PRT Availability Check must be set in the checking control.
C An overall profile must be assigned in the checking control.
D The Relevant for Finite Scheduling indicator must be set
C An overall profile must be assigned in the checking control.
D The Relevant for Finite Scheduling indicator must be set
Your production planners must execute planning only for specific resources. How can you achive this in advanced Planning(PP/DS)
A Use heuristic.
B Use a resource group.
C Use a propagation range.
D Use a planning group.
A Use heuristic.
Which alternative item strategies are available in bills of material (BOMs) in SAP S/4HANA? Note: There are 2 correct answers to this question.
A Manual maintenance
B Simultaneous
C 100% check
D First in first out (FIFO)
A Manual maintenance
C 100% check
Your company produces a finished good based on a forecast and expects it to be in stock when customers order it. If customers order more than the forecasted quantity, this must NOT have any impact on the production program.Which planning strategy do you use?
A Make-to-order production (20)
B Planning without final assembly (50)
C Make-to-stock production (10)
D Planning with final assembly (40)
D Planning with final assembly (40)
Your project team decides to use a make-to-order planning strategy for a strategic material in discrete manufacturing. What is the impact of this decision? Note: There are 3 correct answers to this question.
A Production orders are created with sales order reference.
B Sales orders have to be ATP-confirmed (available-to-promise) to be saved.
C Net requirements calculation is carried out for every sales order individually.
D Storage location MRP areas are required for sales-order-specific stock.
E Both the reduction of make-to-order stock and requirements occur on delivery.
A Production orders are created with sales order reference.
B Sales orders have to be ATP-confirmed (available-to-promise) to be saved.
C Net requirements calculation is carried out for every sales order individually.
Which time elements are part of a routing operation?
Choose 3
A Pick/pack time
B Float before production
C Queue time
D Wait time
E Move time
A Pick/pack time
C Queue Time
D Wait time
What are the consequences if the Dispatched operation status is set for a production order operation? Choose 2
A You can reschedule the operation using midpoint scheduling in a planning table.
B You can reschedule the operation using finite scheduling in planning table
C You can update the order's status using production order management features.
D You can reschedule the order using infinite scheduling in a planing table
B You can reschedule the operation using finite scheduling in planning table
C You can update the order's status using production order management features.
How can you achieve a feasible production plan in case of capacity constraints?
A Execute an infinite production planning run for the critical resources.
B Increase the capacity supply in a time-phased interval.
C Reduce the planning window.
D Form optimum sequences to reduce setup times.
E Determine a time period with available capacity on the planning board.
B Increase the capacity supply in a time-phased interval.
D Form optimum sequences to reduce setup times.
E Determine a time period with available capacity on the planning board.
Which of the following is used by the MRP Live planning run in SAP S/4HANA?
Net Change Planning
The pegging situation was changed because of an MRP heuristic run. What is a capability of dynamic pegging?
It links receipts from an alternative location in case of a shortage in the default location
In order to use strategy 70 – Planning At Assembly Level, what order field must be set besides the planning strategy?
Individual/Collective Indicator | |
Dependent Requirements indicator | |
Mixed MRP indicator | |
Storage Location MRP Indicator |
Mixed MRP indicator
Confirmations for process order are recorder at which level?
Phase Level
How can you avoid order proposals for planned independent requirements with dates in the past?
There are 2 correct answers to this question.
| |
Use a planning strategy with requirements consumption | |
Set the requirements reduction indicator in the requirements class | |
Maintain adjustment parameter in the MRP group |
Reorganize planned independent requirements
Maintain adjustment parameter in the MRP group
Which of the following are design principles of SAP Fiori?
There are 2 correct answers to this question.
Coherent | |
On-premise | |
Delightful | |
Complex |
Coherent
Delightful
For which data objects do you have to set up CIF integration models in S/4HANA to use them in advanced planning?
There are 2 correct answers to this question.
Work center | |
Contract | |
Material master | |
Production plant |
Contract
Production Plant
Which of the following is the main reason for an alternative production method being required for different production lots?
Please choose the correct answer.
| |
Efficiency | |
Validity date | |
Labor availability |
Efficiency
What does the work center hierarchy define in SAP S/4HANA capacity planning?
A group of alternative work centers for production, structured in hierarchy levels by priorities
Which bill of material (BOM) categories can you define in SAP S/4HANA?
There are 2 correct answers to this question
Functional Location BOM | |
Sales Order BOM | |
Work Center BOM | |
Class BOM |
Functional Location BOM
Sales Order BOM
Which statements are correct with reference to the Schedule Production app?
There are 3 correct answers to this question.
A | Planning Mode can be selected flexibly between Bucket and Sequence. |
B | This app is applicable only for pacemaker or bottleneck work center. |
C | You can perform dispatch, deallocate, and reschedule of operations. |
D | Only the Chart view is available for this app. |
E | You can have more than one work center as a bottleneck work center. |
A Planning Mode can be selected flexibly between Bucket and Sequence.
C You can perform dispatch, deallocate, and reschedule of operations.
D Only the Chart view is available for this app.
Capacity Leveling: In which of the following situations is the dispatch of an operation likely to be cancelled?
When the desired dispatching time of an operation coincides with an operation that is already dispatched. | |
When inserting an operation infinitely fails due to lack of capacity | |
When there is a critical bottleneck for a work center | |
When an operation is shifted out of a planning period |
When an operation is shifted out of a planning period
With reference to MTO planning strategies, which of the following statements are correct?
Both A and B are correct. | |
Only answer A is correct. | |
Rounding values should not be used. | |
MTO strategies should always be combined with lot-size key EX (lot-for-lot). |
Both A and B are correct.
What data can you maintain in the sub items of a bill of material (BOM)?
Installation Point
Quantity
In which data objects do you maintain the production in as the work center for repetitive manufacturing?
Product Version
Routing
What is a typical transportation processing SAP Transportation Management?
Order Management, Transportation Planning, Transportation Execution, Freight Costing and Settlement, Analytics and Reporting
What are some of the SAP Fiori user types?
There are 3 correct answers to this question.
Response:
Business partner | |
Occasional | |
Employee | |
Developer | |
Expert |
Occasional
Developer
Expert
Which of the following items are part of the end-to-end process in Demand-Driven Replenishment?
There are 3 correct answers to this question.
Coupling of Production Lines | |
Buffer Positioning | |
Replenishment Planning | |
Buffer Sizing |
Buffer Positioning
Replenishment Planning
Buffer Sizing
Which of the following statements are correct?
There are 2 correct answers to this question.
A | You can only print the shop papers in the background. |
B | The shop floor papers are classified as operation-related slips, component-based slips, and multipurpose slips. |
C | You can print the papers when the order is in Created status. |
D | Original print and reprint are the two modes available for printing. |
B The shop floor papers are classified as operation-related slips, component-based slips, and multipurpose slips
D Original print and reprint are the two modes available for printing.
Which are possible replenishment strategies for the supply source of a Kanban control cycle?
There are 3 correct answers to this question.
Response:
A | Subcontracting |
B | External procurement |
C | Inhouse production |
D | Stock transfer |
External Procurement
Inhouse Production
Stock Transfer
At which level is scheduling performed?
Resource
What are the possible results of a production planning run in Advanced Planning (PP/OS)?
There are 3 correct answers to this question.
Response:
A | Stock transport order |
B | Production order |
C | Planned order |
D | Purchase requisition |
E | Scheduling agreement schedule line |
C
D
E
Which of the following statements are true regarding the material master?
There are 2 correct answers to this question.
A | It’s always possible to change the industry sector of a material after you assign it. |
B | It’s possible to set the industry sector as default but not possible to set views and organization levels as default. |
C | The material type determines the screen sequence, material number assignment, and procurement type. |
D | Maintaining the material master is a collective responsibility of different departments in an organization. |
C
D
How can SAP S/4HANA support a GMP compliant production process?
There are 3 correct answers to this question.
Response:
A | Documentation of quality data with Quality Management |
B | Predefined GMP compliant process order types to meet audit requirements |
C | Recipe approval with Engineering Change Management |
D | Use of the GMP compliant flag in relevant master data applications |
E | Use of the digital signature function to check and run business processes |
A
B
C
D
Which of the following statements describe the Schedule Production app?
There are 2 correct answers to this question.
Response:
A | It maintains capacity and raw material constraints to achieve right product mix. |
B | It is a straightforward tool for the capacity leveling of planned, production and process orders. |
C | It records sales orders to ensure all demands are at the same level of fulfillment. |
D | It is specially designed for dispatching orders to pacemaker or bottleneck work centers. |
B
D
Before a user can add multiple production versions in a material master, what information should be collected?
There are 3 correct answers to this question.
Response:
A | Task list group number |
B | Lot sizes |
C | Work center hierarchy |
D | BOM status |
E | Validity dates |
B
D
E
Which of the following belong to production master data in SAP S/4HANA?
There are 2 correct answers to this question.
A | Integrated business planning |
B | Planning for discrete manufacturing |
C | Period-based planning and production |
D | Assembly processing with production order |
B
C
Which of the following are optimization criteria for the PP/DS optimization?
There are 3 correct answers to this question.
Makespan | |
Labor costs | |
Setup times | |
Delay costs | |
Machine robustness |
Makespan
Setup times
Delay costs
Which report would you use to display the differences between two BOMs with different change statuses?
BOM comparison
Taking the MRP cockpit as an example - what are key capabilities of SAP S/4HANA’s new user interface?
A | Mobile access |
B | System-based decision support |
C | On-the-fly simulations |
D | Personalization |
A,B,C,D
To perform capacity planning for planned orders, which MRP Live run option should be used?
Lead Time scheduling
Which SAP solutions support the supplier area in the portfolio of the Digital Value Network?
SAP Ariba
SAP Field Glass
Which time elements does MRP consider in backward scheduling to determine the order dates for components from dependent requirements?
There are 2 correct answers to this question.
A | Total replenishment lead time |
B | Planned delivery time |
C | Operation duration |
D | In-house production time |
B
D
Which material-specific information can be transferred to a transportation lane in PP/DS?
There are 3 correct answers to this question.
A | Production versions |
B | Special procurement keys |
C | Quota arrangements |
D | Outline agreement |
E | Purchasing info records |
B, D, E
Which of the following controls the engineering workbench (EWB)?
Cockpit
What options does a planner have in the planning table for repetitive manufacturing?
There are 2 correct answers to this question.
Response:
A | Reschedule/deallocate operations. |
B | Create new production quantities. |
C | Change the assignments of production quantities to production lines. |
D | Dispatch operations to work centers. |
B,C
Which SAP solutions are part of the Digital Value Network portfolio?
Concur
SAP Hybris
SAP Fieldglass
Which transactional data is required for predictive material and resource planning (pMRP)?
Planned Independent Requirements (PIRs)
Phantom assemblies facilitate ________________.
There are 2 correct answers to this question.
A | simple structuring of BOMs |
B | component assignment |
C | easy maintenance of the material master |
A, B
What are the key aspects of SAP S/4HANA?
There are 2 correct answers to this question.
Response:
A | SAP S/4HANA can be deployed on-premise, in the cloud, or a combination of both. |
B | SAP S/4HANA increases the data footprint. |
C | SAP S/4HANA has minor changes on data model. |
D | SAP S/4HANA is built on SAP HANA |
A
D
Which options are available for an SAP S/4HANA deployment?
There are 2 correct answers to this question.
A | SAP S/4AHANA Enterprise Management cloud |
B | SAP S/4HANA Professional services cloud |
C | SAP S/4HANA private cloud |
D | SAP S/4HANA on premise |
C
D
The production plan is being disrupted by last minute demands that are entered in the system. Which is the most efficient way to handle last minute demands and protect the current production plan?
There are 2 correct answers to this question.
A | In the stock requirements list, set a manual firming fence for a date based on the replenishment lead time of the material |
B | In the material master record, set MRP type to P1 and a planning time fence on the replenishment lead time of the material |
C | Manually firm all planned orders for materials within the replenishment lead time of the material |
D | In the material master record, set MRP type to P4 and a planning time fence on the replenishment lead time of the material |
A
D
How does new Inventory Management Data model contribute to the reduction of the data footpint?
There are 3 correct answers to this question.
A | By eliminating inventory history tables |
B | By eliminating fields for different stock types |
C | By eliminating inventory tables |
D | By eliminating hybrid tables |
E | By eliminating material master tables |
A
B
C
Which statements regarding material master numbering in SAP S/4HANA are correct?
A | The maximum length of a material is 18 characters for an external number range. |
B | A template can be assigned to material numbers but without any additional characters. |
C | The maximum length of a material is 18 characters for an internal number range. |
D | It's required to activate and acknowledge the extended material length with Transaction FLETS. |
E | The material number is unique for a material. |
C
D
E
The Mixed MRP indicator is used in conjunction with which of the planning strategies?
There are 2 correct answers to this question.
A | Subassembly planning strategies |
B | MTO planning |
C | Gross requirements planning |
D | Net requirements planning |
A
C
In which customizing activity do you set up automatic routing selection for production orders?
Define order-type-dependent parameter
Which of the following are standard forecasting techniques?
There are 3 correct answers to this question.
A | Consumption |
B | Exponential smoothing |
C | Moving average |
D | Value proposition |
E | Trend model |
B
C
E
Which of the following consists of interoperation times of an operation?
There are 3 correct answers to this question.
A | Wait time |
B | Queue time |
C | Setup time |
D | Move time |
E | Processing time |
A
B
D
Operations can be rescheduled from a resource to an alternate resource using which of the following ways?
There are 3 correct answers to this question.
A | Manual drag and drop |
B | Using a PDS with multiple modes |
C | Attaching a production note to the PDS |
D | Selecting a different PDS using a heuristic |
A
B
D
Which system components can provide Planned Independent Requirement numbers?
There are 3 correct answers to this question
A | SAP Manufacturing Execution |
B | SAP S/4HANA Standard SOP |
C | SAP Integrated Business Planning |
D | SAP APO Demand Planning |
B
C
D
Which are the key features of SAP HANA?
There are 3 correct answers to this question.
A | Parallelization |
B | In-memory |
C | SAP Fiori |
D | Compression |
A
B
D