[P1] BT PART 1

0.0(0)
Studied by 0 people
call kaiCall Kai
Locked
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
GameKnowt Play
Card Sorting

1/21

encourage image

There's no tags or description

Looks like no tags are added yet.

Last updated 3:12 PM on 8/26/26
Name
Mastery
Learn
Test
Matching
Spaced
Call with Kai
Chat

No analytics yet

Send a link to your students to track their progress

22 Terms

1
New cards

PRELIMINARY COST ESTIMATION

Abstract cost estimate, approximate cost. Used in the early phases of a project

2
New cards

DETAILED ESTIMATE

involves breaking down the project scope into smaller unit prices that can be priced individually

3
New cards

QUANTITY COST ESTIMATE

Based on the actual number of units or amount of work that needs to be provided. is based on the count or measure of the amount of work and materials needed to complete the project

4
New cards

BID COST ESTIMATE

Cost estimate that is submitted to a potential client in hopes of winning the job

5
New cards

WALL AREA = LENGHT X HEIGHT

Compute the wall area

6
New cards

400mm x 200mm

The standard dimensions of CHB

7
New cards

CHB required = WALL AREA X 12.5

Compute the total number of CHB

8
New cards

5-10%

A typical allowance for CHB is

9
New cards

Area = Length x Height

Compute the plastering area

10
New cards

Total area = (Length x Height) x 2

Compute if plastering both sides of the wall

11
New cards

Volume = Area x Thickness

Compute the Volume of Plaster

12
New cards

approximate estimate

The _____ is prepared from the practical knowledge and cost of similar works.

13
New cards

estimate

The _____ is accompanied by a report duly explaining necessity and utility of the project and with a site or layout plan. A percentage 5 to 10% is allowed for contingencies

14
New cards

Area Method

The_____ of Estimate is a preliminary estimating technique in which the approximate cost of a building is determined by multiplying its total floor area by the average construction cost per square meter.

15
New cards

Cubic Meter Method

The _____ of Estimate determines the approximate construction cost by using the total volume of a building.

16
New cards

building volume

The_____ is calculated by multiplying the total floor area by the average height of the Page 1of 22 structure, and the result is multiplied by the unit cost percubic meter. This methodis moreappropriate for buildings with different floor heights because it considers the enclosed space rather than just the floor area.

17
New cards

Linear Meter Method

The _____ of Estimate is used when construction work is measured according to its length. It is commonly applied to projects such as fences, pipelines, canals, roads, drainage systems, and retaining walls.

18
New cards

Direct Counting Method

The_____ of Estimate is used for construction items that are counted individually instead of being measured by area, volume, or length. These include doors, windows, plumbing fixtures, lighting fixtures, and other equipment.

19
New cards

Earthwork

in construction refers to the process of moving and processing portions of the earth’s surface to create suitable conditions for construction. It involves the removal, moving, and addition of soil or rock to achieve desired ground levels for the foundation of buildings, roads, and other infrastructure projects.

20
New cards

Pyramids

What are the prime examples of early earthworks in Egypt

21
New cards

Great wall

What are the prime examples of early earthworks in China

22
New cards

EXCAVATION

is the process of removing soil or rock from a site to create space for foundations, basements, and other underground structures.