who will notify the MCR that new fuel has damage and who will notify the MCR that new fuel may be damaged?
notified by fuel handling supervisor that fuel cladding of new fuel assemblies may be damaged
notified by fuel handling group that an event has occurred where fuel damage may be suspected
what is the concern with placing a damaged fuel assembly in the core?
placing a fuel assembly in an unanalyzed position could challenge the required SDM
what is required during a breached fuel cladding event?
evacuate non-essential personal from the fuel BLDG and CTMT
in CTMT
actuate CPIAS/CREFAS
close airlocks
close equipment hatch
fuel building
actuate FBEVAS/CREFAS
ensure equal number aux Bldg supply and exhaust fans are running
who will initiate the fuel handling event recovery checklist
initiated by RSRO or FHS for fuel handling problems
who will determine the safe intermediate storage locations?
placement will be at the RSROs discretion
what are the entry conditions for Loss of SFP cooling or level?
Low level alarm or less than 137’ on any spent fuel level instrument
loss of cooling hi temp alarm or pump problems
what are the exit conditions for a loss of SFP cooling?
temperature controlled to less than 145F
what are the milestone levels for the SFP?
138’1” normal level
137’4” LCO 3.7.14. 23ft above fuel assemblies
131’10” loss of PC pump suction
130’2” lowest level due to pipe break/valve misalignment
what is the design bases for time to boil in M1-4 and during full core offload
M1-4 16.7 hours
full core offload 3.46 hours
where should fuel that is being moved be placed during a loss of level or cooling?
place in storage rack (loss of cooling only) OR lower F/A to just above the floor in the deep area of the SFP
if PCN-V118 is open, what affect does the delta P between the CTMT building and the FB have on pool levels
Delta P creates a monometer effect between the buildings
what are the consequences of aligning SDC to the SFP during a loss of SFP cooling have?
aligning SDC to SFP does not make SDC non-functional
augment SDC results in a higher level in the refueling pool than in the SFP due to lineup required to allow refueling pool water to flow into the SFP