Flashcards covering bridge construction terminology and pipeline engineering concepts as described in the lecture notes.

Last updated 3:43 PM on 5/11/26
Name
Mastery
Learn
Test
Matching
Spaced
Call with Kai
Chat

No analytics yet

Send a link to your students to track their progress

25 Terms

1
New cards

Deck

The surface of a bridge where vehicles move.

2
New cards

Pillars

The vertical supports of a bridge structure.

3
New cards

Abutments

The supports located at the specific ends of a bridge.

4
New cards

Segmental Bridge

A bridge built in small sections called segments that are connected together rather than being built in one large piece.

5
New cards

Cast-in-place

Concrete that is built and poured in its final location at the construction site.

6
New cards

Precast concrete

Concrete segments built elsewhere and then transported to the bridge site.

7
New cards

Incremental Launching Method (ILM)

A construction method where the bridge deck is built section by section from one abutment and pushed forward toward the other side, usually for decks longer than 250m250\,m.

8
New cards

Steel nose

A component placed at the front of the bridge deck during the Incremental Launching Method to help the deck reach the pier safely.

9
New cards

Pigging Stations

Intermediate stations in a pipeline used for cleaning and inspection.

10
New cards

Sectionalizing Valve Station

A pipeline component used specifically for isolating segments of the line.

11
New cards

Tap-off Stations

Intermediate delivery points along a pipeline system.

12
New cards

Coupling

A fitting used to join two identical threaded pipes together.

13
New cards

Reducer

A fitting used to enlarge or reduce the diameter of a pipeline.

14
New cards

Right-of-Way (ROW)

The approved work boundaries and centerline area surveyed for pipeline construction and land acquisition.

15
New cards

Pipe Stringing

The process of aligning raw pipe segments end-to-end along the trench.

16
New cards

Hydrostatic Testing

Testing a pipeline before operation by filling it with water and increasing the pressure above normal operating levels to check for leaks.

17
New cards

Thrust boring

A trenchless construction method used where excavation is undesirable, involving a cutting head, a jacking rig, and an auger to remove soil.

18
New cards

Pilot Bore

A small first hole created during thrust boring that shows the planned path of the pipeline, guided by a laser system.

19
New cards

Seabed Intervention

Offshore activities such as dredging carried out to reduce geohazards, correct free spans, and protect pipelines from waves or currents.

20
New cards

Free spans

Gaps created by an uneven seabed under a pipeline that increase bending stress and risks of vibration.

21
New cards

S-Lay System

An offshore pipe-laying method where the pipeline is assembled onboard and leaves the stern in a curve that forms an "S" shape underwater.

22
New cards

J-Lay System

A deep-water pipe-laying method where the pipeline leaves the vessel in a nearly vertical position, forming a "J" shape with only one curve.

23
New cards

Reel-Lay System

A system where the pipeline is assembled onshore and then wrapped around a large drum on the vessel for offshore installation.

24
New cards

Mattresses

Stabilization components placed under or above a pipeline for support and protection.

25
New cards

Saddle Blocks

Concrete blocks used to provide lateral support for pipeline stabilization.