Assembly Systems - ISEE 120

0.0(0)
studied byStudied by 0 people
0.0(0)
full-widthCall Kai
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
GameKnowt Play
Card Sorting

1/5

encourage image

There's no tags or description

Looks like no tags are added yet.

Study Analytics
Name
Mastery
Learn
Test
Matching
Spaced

No study sessions yet.

6 Terms

1
New cards

Make-to-Order

  • (custom)

2
New cards

Assemble-to-Order

  • (options)

3
New cards

Make-to-Stock

  • (standardized)

4
New cards

Push Systems

  • produces an item irrespective of actual demands; creates muda of overproduction

  • Advantages: 

    • Simple to implement

    • Efficient for high-volume production of standard items

    • Easier capacity planning

  • Disadvantages:

    • Overproduction/inventory waste

    • Lack of flexibility in changing demands

    • Increased lead times

5
New cards

Muda

  • waste

6
New cards

Pull System

  • produces an item when the customer asks for it

  • Advantages:

    • Reduced inventory waste (less WIP)

    • Increased responsiveness to demand changes (lead time shorter)

    • Improved lead times 

    • Reduced production costs (only working on what’s needed)

  • Disadvantages: 

    • Requires good forecasting and communication 

    • May not be suitable in high volume production

    • Increased complexity