AVMG 3600 - Ch. 9

0.0(0)
Studied by 3 people
call kaiCall Kai
Locked
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
GameKnowt Play
Card Sorting

1/22

flashcard set

Earn XP

Description and Tags

Production Planning and Control (PP&C)

Last updated 10:04 PM on 10/10/23
Name
Mastery
Learn
Test
Matching
Spaced
Call with Kai
Chat

No analytics yet

Send a link to your students to track their progress

23 Terms

1
New cards

The PP&C function is considered an ‘idealized’ responsibility

Planning

2
New cards

All “A” Checks and higher are coordinated by

PP&C

3
New cards

Often times, operations and maintenance schedules need to e modified by

PP&C

4
New cards

Parts required for maintenance are not readily available, this is an example of

Parts running (cannibalization)

5
New cards

The activities of line, hanger, and shop maintenance constitute the ___ aspect of M&E.

Production

6
New cards

Schedules for checks and known modifications are finalized in which type of forecast?

Short-term

7
New cards

The crash of a BAC1-11 in 1990 lead to the need for airlines to address

Human factors in maintenance

8
New cards

What are the three primary functions of PP&C?

Forecasting, Planning, and Control

9
New cards

Why can continually deferring maintenance items b costly to airlines?

The aircraft must be taken out of service for several hours

10
New cards

PP&C control maintenance by

Adjusting the plan and keeping checks on schedule

11
New cards

PP&C is primarily responsible for

Planning and scheduling all aircraft maintenance activity within an airline

12
New cards

Planning and scheduling the appropriate manpower, parts and facilities are examples of PP&C’s ____ function.

Planning

13
New cards

Deferring maintenance, adding personnel, and outsourcing are examples of PP&C’s ____ function.

Controlling

14
New cards

Unscheduled maintenance, or work generated by inspections in considered a/an ____ task.

Non-routine

15
New cards

Who administers routine tasks?

MCC

16
New cards

PP&C’s forecasting activities include:

Estimated maintenance workload

17
New cards

Who is usually in control of daily, 48-hour, and transit checks?

Line Mainteance

18
New cards

Deferred Maintenance is an example of which type of task?

Variable-routine

19
New cards

What is maintenance’s “Product”?

Airworthy vehicles

20
New cards

In a partially decentralized organization

Forecasting and Planning is performed by PP&C, while control is done by another work center

21
New cards

Preliminary Planning consists of

Developing the maintenance program by engineering

22
New cards

The “C” Check consists of three category tasks:

Routine, variable routine, and non-routine

23
New cards

In march 2010, Northwest airlines was fined $1.45 million by the FAA due to

Poop PP&C maintenance scheduling in response to an AD