CIM 310 Test 1

studied byStudied by 0 people
0.0(0)
learn
LearnA personalized and smart learning plan
exam
Practice TestTake a test on your terms and definitions
spaced repetition
Spaced RepetitionScientifically backed study method
heart puzzle
Matching GameHow quick can you match all your cards?
flashcards
FlashcardsStudy terms and definitions

1 / 22

encourage image

There's no tags or description

Looks like no one added any tags here yet for you.

23 Terms

1

Basis of strength in concrete

W/C ratio

New cards
2

Admixtures for concrete are

Chemical and Mineral

New cards
3

Concrete achieves ___% of untilate compressive strength in 7 days

65-75

New cards
4

what percentage does the paste represent in the concrete mixture

20-40

New cards
5

A mixture in a freshly harded state, delivered to the site is

Ready Mix Concrete

New cards
6

High Profile Bacthes have components:

above ground level

New cards
7

Whats is the difference between wet-batch plants and dry-batch plants

The Mixer

New cards
8

Liquid advixture dosage is in:

floz/yd3

New cards
9

minimum concrete temprature of concrete mixtures in cold weather is:

50F

New cards
10

Batch plant mixers can be grouped in:

Tilt and horizontal mixers

New cards
11

non-agitating trucks are used for:

short haul projects

New cards
12

10yd3 concrete buckets are helpful for:

high elevation

New cards
13

concrete mictures made a mobil truck mixer is commonly:

Volume based

New cards
14

Common concrete barrel size in NJ is:

4-12 yd3

New cards
15

production, delivery and placecmnt of ready mix concrete is based on:

ASTM C-94

New cards
16

Scale that has a counter weight

Scale Lever

New cards
17

Scale that is electronic

Single Load

New cards
18

Scale that has no moving parts

Four Point

New cards
19

In batching, Cement should be weighed:

First

New cards
20

In batching Pozzolans should be batched:

Second

New cards
21

water batching can be done by:

Volume and Weight

New cards
22

loading method which blends fine and coarse and cememt before

Ribbon Batching

New cards
23

Loading method where trucks get aggregate, water and admixtures; thenthey move to the next station to get the cement

Dry Batching

New cards
robot