Procédures Opérationnelles Avions (ATPL 070)

0.0(0)
Studied by 0 people
call kaiCall Kai
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
Card Sorting

1/34

flashcard set

Earn XP

Description and Tags

Vocabulary flashcards generated from the Operational Procedures course manual covering ICAO/AIR OPS regulations, flight duty, weather hazards, runway conditions, and precision approaches.

Last updated 11:58 AM on 9/6/26
Name
Mastery
Learn
Test
Matching
Spaced
Call with Kai
Chat

No analytics yet

Send a link to your students to track their progress

35 Terms

1
New cards

Flight Time (Block Time)

The total time measured from the moment an aircraft first moves under its own power for the purpose of taking off until the moment it comes to a complete rest at the end of the flight.

2
New cards

Flight Duty Period (FDP)

The total time between the moment a flight crew member commences duty immediately after a rest period and prior to operating a flight or series of flights, and when relieved of all duties after completing that flight or series of flights.

3
New cards

Rest Period

Any continuous and defined period of time on the ground during which a flight crew member is relieved of all duties by the operator.

4
New cards

Take-off Alternate Aerodrome

An alternate aerodrome where an aircraft can land if it becomes necessary shortly after take-off and it is not possible to use the aerodrome of departure.

5
New cards

En-route Alternate Aerodrome

An adequate aerodrome at which an aircraft would be able to land in the event that a diversion becomes necessary while en route.

6
New cards

Destination Alternate Aerodrome

An alternate aerodrome to which an aircraft may proceed should it become impossible or inadvisable to land at the aerodrome of intended landing.

7
New cards

Master Minimum Equipment List (MMEL)

A document established for a specific aircraft type by the aircraft manufacturer and approved by the State of Design certification authority, listing the items that may be temporarily inoperative under specified conditions.

8
New cards

Minimum Equipment List (MEL)

A document established by the operator for its own aircraft, based on the MMEL and approved by the operator's Authority, permitting operation of the aircraft with certain inoperative equipment at the commencement of flight.

9
New cards

ETOPS (Extended-range Twin-engine Operational Performance Standards)

The operation of twin-engine aircraft approved by the Authority beyond specific threshold distances or times (such as 60min60\,\text{min} at one-engine-inoperative cruise speed for Performance Class A with CANSP 20\ge 20 or MMSD 45,360kg\ge 45,360\,\text{kg}) from an adequate aerodrome.

10
New cards

Isolated Aerodrome

An aerodrome for which the required fuel (diversion and landing) to reach the nearest adequate destination alternate is greater than 2hours2\,\text{hours} of normal cruise consumption for turbine aircraft or 45min+15%45\,\text{min} + 15\% cruise flight time for piston aircraft.

11
New cards

Contaminated Runway

A runway where more than 25%25\% of the required surface area is covered by standing water (>3mm> 3\,\text{mm}), slush or loose snow equivalent to >3mm> 3\,\text{mm} of water, compacted snow, or ice.

12
New cards

Damp Runway

A runway surface that is not dry, but where surface moisture does not give it a shiny appearance.

13
New cards

Wet Runway

A runway surface covered with water or equivalent at a depth less than specified for a contaminated runway, or where surface moisture is sufficient to make it reflective without significant standing water.

14
New cards

Low Visibility Take-Off (LVTO)

A take-off on a runway where the Runway Visual Range (RVR) is less than 400m400\,\text{m}.

15
New cards

Fail-Passive Flight Control System

A flight control system that, in the event of a failure, produces no significant out-of-trim condition, trajectory deviation, or abnormal attitude, requiring the pilot to assume manual control because automatic landing is not completed.

16
New cards

Fail-Operational Flight Control System

A flight control system that ensures the approach, flare, and landing can be completed automatically if a failure occurs below the alert height.

17
New cards

De-icing

A procedure that removes ice, snow, slush, or frost from an aircraft's surfaces using mechanical/pneumatic methods or heated fluids.

18
New cards

Anti-icing

A precautionary procedure providing protection against the formation of ice, clear ice, or accumulation of snow and slush on clean aircraft surfaces for a limited time.

19
New cards

Holdover Time (HOT)

The estimated time during which anti-icing fluid will prevent the formation of ice or frost and the accumulation of snow on the treated surfaces of an aircraft.

20
New cards

Microburst

A strong downdraft associated with thunderstorms that impacts a small area of ground (typically less than 2km2\,\text{km} in diameter) and spreads horizontally in all directions, creating severe vertical and horizontal wind shear.

21
New cards

Dynamic Hydroplaning

Hydroplaning caused by standing water on the runway that prevents the tire tread from contacting the runway surface, occurring above a minimum speed given by V=9PV = 9 \sqrt{P} in knots (where PP is tire pressure in psi\text{psi} for rotating tires).

22
New cards

Viscous Hydroplaning

Hydroplaning occurring when a thin film of water mixes with dust, oil, or rubber deposits to form a smooth viscous layer, occurring at lower speeds on lightly contaminated surfaces.

23
New cards

Reverted Rubber Hydroplaning

Hydroplaning caused by a prolonged skid that generates heat, melting the tire rubber and trapping steam beneath the tire tread.

24
New cards

Category I Precision Approach (CAT I)

A precision instrument approach and landing using ILS, MLS, or PAR with a decision height (DH) 200ft\ge 200\,\text{ft} and a runway visual range (RVR) 550m\ge 550\,\text{m}.

25
New cards

Category II Precision Approach (CAT II)

A precision instrument approach and landing using ILS or MLS with a decision height (DH) between 100ft100\,\text{ft} and 200ft200\,\text{ft} and an RVR 300m\ge 300\,\text{m}.

26
New cards

Category IIIA Precision Approach (CAT IIIA)

A precision instrument approach and landing using ILS or MLS with a decision height (DH) <100ft< 100\,\text{ft} (or no DH) and an RVR 200m\ge 200\,\text{m}.

27
New cards

Category IIIB Precision Approach (CAT IIIB)

A precision instrument approach and landing using ILS or MLS with a decision height (DH) <50ft< 50\,\text{ft} (or no DH) and an RVR between 75m75\,\text{m} and 200m200\,\text{m}.

28
New cards

Noise Abatement Departure Procedure 1 (NADP 1)

A noise abatement departure procedure designed to provide noise reduction for noise-sensitive areas close to the aerodrome.

29
New cards

Noise Abatement Departure Procedure 2 (NADP 2)

A noise abatement departure procedure designed to provide noise reduction for areas more distant from the aerodrome.

30
New cards

Reduced Vertical Separation Minimum (RVSM) Airspace

Airspace where the minimum vertical separation is reduced to 1,000ft1,000\,\text{ft} (300m300\,\text{m}) between flight levels FL 290 and FL 410 inclusive.

31
New cards

Strategic Lateral Offset Procedures (SLOP)

A standard operating procedure in oceanic airspace where aircraft may apply an offset up to 2NM2\,\text{NM} to the right of the track centerline to mitigate collision risks and wake turbulence.

32
New cards

Minimum Navigation Performance Specification (MNPS)

A set of navigation performance standards required for aircraft operating in designated oceanic airspace (such as the NAT region), requiring specialized equipment and approvals.

33
New cards

Route de Temps Minimum (RTM)

A flight route chosen in long-haul operations that may be longer in ground distance than the orthodromic route but yields the shortest flight time due to favorable wind conditions.

34
New cards

Precautionary Landing

A planned landing on an appropriate aerodrome executed to control an unexpected situation that does not immediately endanger the safety of the aircraft.

35
New cards

Emergency Landing

An unavoidable landing on land or water executed when continued flight is impossible or when immediate danger threatens the safety of the aircraft and its occupants.