1/15
Flashcards covering the core rules, definitions, examples, and response patterns for the four schedules of reinforcement: Fixed Ratio, Variable Ratio, Fixed Interval, and Variable Interval.
Name | Mastery | Learn | Test | Matching | Spaced | Call with Kai | Chat |
|---|
No analytics yet
Send a link to your students to track their progress
In reinforcement schedules, if the reward is based on behaviors or actions, the schedule is a __________.
Ratio
When a schedule is based on time, such as seconds, minutes, or hours, it is classified as an __________.
Interval
If the requirement for reinforcement is the same every time (constant or set), it is a __________ schedule.
Fixed
If the requirement for reinforcement changes or is based on an average, it is a __________ schedule.
Variable
A __________ schedule is based on behaviors and is the same every time, such as getting a token for every 5 correct answers.
Fixed Ratio (FR)
The responding pattern for a Fixed Ratio (FR) schedule looks like fast responding followed by a __________ after the reward.
short pause
A __________ schedule is based on behaviors but the number of required responses changes (average), like rewards given on average every 5 responses.
Variable Ratio (VR)
The responding pattern for a Variable Ratio (VR) schedule is characterized as __________ responding with no pauses.
very high, steady
A __________ schedule is based on time and is the same every time, such as praise for the first correct response after every 5min.
Fixed Interval (FI)
The response pattern for a Fixed Interval (FI) schedule is known as a __________ pattern, where behavior is slow then speeds up.
scalloped
A __________ schedule is based on time but the duration changes (average), such as praise for the first correct response on average every 3min.
Variable Interval (VI)
A Variable Interval (VI) schedule produces a __________, steady, and consistent responding pattern.
moderate
To identify a schedule fast, Step 1 is to ask if it is about __________ or __________.
actions; time
To identify a schedule fast, Step 2 is to ask if the requirement is always the __________ or if it __________.
same; changes
Matching the components: Average/Changing + Time results in a __________ schedule.
Variable Interval (VI)
Matching the components: Constant/Same + Actions results in a __________ schedule.
Fixed Ratio (FR)