This set of flashcards covers geodetic and project control survey regulations, monument specifications, technical standards for PPCS/PTM, and administrative requirements under DMC 2010-13 and DAO No. 2007-29.
Name | Mastery | Learn | Test | Matching | Spaced | Call with Kai | Chat |
|---|
No analytics yet
Send a link to your students to track their progress
According to DMC 2010-13, which type of surveys must be fixed on the surface of the earth by permanent monuments?
Control Surveys
Which sections of DAO No. 2007-29 define and classify control surveys into geodetic and project control surveys?
4, 8
In what reference system must all Geodetic Control Surveys be conducted using survey-grade GNSS receivers?
Philippine Reference System of 1992 (PRS92)
Under which law, also known as the Philippine Geodetic Engineering Act of 1998, must a qualified professional be authorized to conduct the survey?
RA 8560
Who is responsible for issuing the Survey Order as defined in Section 15 of DAO No. 2007-29?
NAMRIA Administrator
What document, when received by a contractor, signals the official date of commencement for a survey project?
Notice to Proceed
What are the three core components of a Geodetic Control Survey Party?
Project Head Office, Office Operations, and Field Operations
Which two plans must be included in the Geodetic Control Work Plan submitted to NAMRIA?
Project Management Plan and Technical Plan
What value indicates a higher probability of accuracy in GNSS observations, and must be low during field timing?
Position Dilution of Precision (PDOP)
To disrupt transmission of data properly, reconnaissance must identify radio station towers and obstructions above what degree of the horizon?
30∘
For first and second order accuracy survey control monuments, what are the dimensions of the top cross-section, bottom cross-section, and total length?
Top: 30×30cm; Bottom: 40×40cm; Length: 120cm
For third and fourth order accuracy survey control monuments, what are the dimensions of the top cross-section and total length?
Top: 20×20cm; Length: 100cm
How are control points numbered to distinguish those established by NAMRIA from those established by LMB/LMS?
NAMRIA: 1 to 3000; LMB/LMS: 3001 and above
What specific font type, size, and thickness are required for the engraved letters and numbers on reference monuments?
Gothic Bold font, 2.5cm in height, 2cm in width, and 0.4cm in thickness
How many known PRS 92 control points must be included in a network design at minimum?
At least 3 known points
In achieving geodetic control accuracy for 1st and 2nd Order, what is the minimum number of GNSS receiver units required per survey team?
At least 3 receiver units
What is the required minimum number of observations to achieve 1st Order, 2nd Order, and 3rd Order accuracy connection to existing controls?
1st Order: 3 observations; 2nd Order: 2 observations; 3rd Order: 1 observation
What is the duration for posting the Public Land Incentive Survey (PIS) in Barangay Halls for cadastral projects?
30 days
What is the definition of a tie line in the context of land survey and lot positioning?
A straight line with known azimuth and distance computed based on the position of corner 1 of the lot from an established reference monument
In which direction is the azimuth of all survey lines reckoned from zero?
Reckoned from the south as zero direction following clockwise of the quadrants
What is the designation for surveys used for geographic and scientific investigations that cannot be used for titling?
Special Work Order (Swo)
What are the standard dimensions and marginal lines for a Cadastral Map (CM)?
Overall: 54×54cm; Marginal lines: 50×50cm
What is the standard scale of a cadastral map drawn in the PPCS/PTM-PRS 92?
1:4000
What is the required temperature range for steel tapes used in land surveys for standard length calibration?
Between 25∘C and 35∘C
What coordinate system was adopted in the Philippines via Lands Circular No. 64 in 1965?
Philippine Plane Coordinate System (PPCS), also known as the Philippine Transverse Mercator (PTM) Grid
What are the characteristics of the Philippine Plane Coordinate System (PPCS) regarding Spheroid and Scale Factor at the Central Meridian?
Spheroid: Clarke 1866; Scale factor: 0.99995
What is the point of origin for the Philippine Plane Coordinate System (PPCS)?
The intersection of the Equator and the Central Meridian of each zone, with Northing of 0 meter and an Easting of 500,000 meters
What are the transformation constants for ΔX, ΔY, and ΔZ when converting from WGS84 to the PRS92 datum?
ΔX=127.62195m, ΔY=67.24478m, and ΔZ=47.04305m
What are the rotation constants (Rot X, Rot Y, Rot Z) for the transformation from WGS84 to PRS92 datum?
Rot X=−3.06762′′, Rot Y=+4.90291′′, and Rot Z=+1.57790′′
What are the allowable angular error of closures for primary, secondary, and tertiary traverses?
Primary: 2′′.5P; Secondary: 10′′.0S; Tertiary: 30′′T
What is the PRS92 province code for Ifugao, Apayao, and Metro Manila?
Ifugao: IFU; Apayao: APA; Metro Manila: MMA
What is the PRS92 province code for Zamboanga Sibugay and Sultan Kudarat?
Zamboanga Sibugay: ZSI; Sultan Kudarat: SKR