DMC 2010-13 and DAO No. 2007-29 Land Survey Regulations

0.0(0)
Studied by 0 people
call kaiCall Kai
Locked
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
GameKnowt Play
Card Sorting

1/31

flashcard set

Earn XP

Description and Tags

This set of flashcards covers geodetic and project control survey regulations, monument specifications, technical standards for PPCS/PTM, and administrative requirements under DMC 2010-13 and DAO No. 2007-29.

Last updated 2:51 PM on 6/30/26
Name
Mastery
Learn
Test
Matching
Spaced
Call with Kai
Chat

No analytics yet

Send a link to your students to track their progress

32 Terms

1
New cards

According to DMC 2010-13, which type of surveys must be fixed on the surface of the earth by permanent monuments?

Control Surveys

2
New cards

Which sections of DAO No. 2007-29 define and classify control surveys into geodetic and project control surveys?

4, 8

3
New cards

In what reference system must all Geodetic Control Surveys be conducted using survey-grade GNSS receivers?

Philippine Reference System of 1992 (PRS92)

4
New cards

Under which law, also known as the Philippine Geodetic Engineering Act of 1998, must a qualified professional be authorized to conduct the survey?

RA 8560

5
New cards

Who is responsible for issuing the Survey Order as defined in Section 15 of DAO No. 2007-29?

NAMRIA Administrator

6
New cards

What document, when received by a contractor, signals the official date of commencement for a survey project?

Notice to Proceed

7
New cards

What are the three core components of a Geodetic Control Survey Party?

Project Head Office, Office Operations, and Field Operations

8
New cards

Which two plans must be included in the Geodetic Control Work Plan submitted to NAMRIA?

Project Management Plan and Technical Plan

9
New cards

What value indicates a higher probability of accuracy in GNSS observations, and must be low during field timing?

Position Dilution of Precision (PDOP)

10
New cards

To disrupt transmission of data properly, reconnaissance must identify radio station towers and obstructions above what degree of the horizon?

3030^{\circ}

11
New cards

For first and second order accuracy survey control monuments, what are the dimensions of the top cross-section, bottom cross-section, and total length?

Top: 30×30cm30 \times 30\,\text{cm}; Bottom: 40×40cm40 \times 40\,\text{cm}; Length: 120cm120\,\text{cm}

12
New cards

For third and fourth order accuracy survey control monuments, what are the dimensions of the top cross-section and total length?

Top: 20×20cm20 \times 20\,\text{cm}; Length: 100cm100\,\text{cm}

13
New cards

How are control points numbered to distinguish those established by NAMRIA from those established by LMB/LMS?

NAMRIA: 11 to 30003000; LMB/LMS: 30013001 and above

14
New cards

What specific font type, size, and thickness are required for the engraved letters and numbers on reference monuments?

Gothic Bold font, 2.5cm2.5\,\text{cm} in height, 2cm2\,\text{cm} in width, and 0.4cm0.4\,\text{cm} in thickness

15
New cards

How many known PRS 92 control points must be included in a network design at minimum?

At least 33 known points

16
New cards

In achieving geodetic control accuracy for 1st and 2nd Order, what is the minimum number of GNSS receiver units required per survey team?

At least 33 receiver units

17
New cards

What is the required minimum number of observations to achieve 1st Order, 2nd Order, and 3rd Order accuracy connection to existing controls?

1st Order: 33 observations; 2nd Order: 22 observations; 3rd Order: 11 observation

18
New cards

What is the duration for posting the Public Land Incentive Survey (PIS) in Barangay Halls for cadastral projects?

3030 days

19
New cards

What is the definition of a tie line in the context of land survey and lot positioning?

A straight line with known azimuth and distance computed based on the position of corner 11 of the lot from an established reference monument

20
New cards

In which direction is the azimuth of all survey lines reckoned from zero?

Reckoned from the south as zero direction following clockwise of the quadrants

21
New cards

What is the designation for surveys used for geographic and scientific investigations that cannot be used for titling?

Special Work Order (Swo)

22
New cards

What are the standard dimensions and marginal lines for a Cadastral Map (CM)?

Overall: 54×54cm54 \times 54\,\text{cm}; Marginal lines: 50×50cm50 \times 50\,\text{cm}

23
New cards

What is the standard scale of a cadastral map drawn in the PPCS/PTM-PRS 92?

1:40001:4000

24
New cards

What is the required temperature range for steel tapes used in land surveys for standard length calibration?

Between 25C25\,^{\circ}\text{C} and 35C35\,^{\circ}\text{C}

25
New cards

What coordinate system was adopted in the Philippines via Lands Circular No. 64 in 1965?

Philippine Plane Coordinate System (PPCS), also known as the Philippine Transverse Mercator (PTM) Grid

26
New cards

What are the characteristics of the Philippine Plane Coordinate System (PPCS) regarding Spheroid and Scale Factor at the Central Meridian?

Spheroid: Clarke 1866; Scale factor: 0.999950.99995

27
New cards

What is the point of origin for the Philippine Plane Coordinate System (PPCS)?

The intersection of the Equator and the Central Meridian of each zone, with Northing of 00 meter and an Easting of 500,000500,000 meters

28
New cards

What are the transformation constants for ΔX\Delta X, ΔY\Delta Y, and ΔZ\Delta Z when converting from WGS84 to the PRS92 datum?

ΔX=127.62195m\Delta X = 127.62195\,\text{m}, ΔY=67.24478m\Delta Y = 67.24478\,\text{m}, and ΔZ=47.04305m\Delta Z = 47.04305\,\text{m}

29
New cards

What are the rotation constants (Rot X, Rot Y, Rot Z) for the transformation from WGS84 to PRS92 datum?

Rot X=3.06762\text{Rot X} = -3.06762'', Rot Y=+4.90291\text{Rot Y} = +4.90291'', and Rot Z=+1.57790\text{Rot Z} = +1.57790''

30
New cards

What are the allowable angular error of closures for primary, secondary, and tertiary traverses?

Primary: 2.5P2''.5 \sqrt{P}; Secondary: 10.0S10''.0 \sqrt{S}; Tertiary: 30T30'' \sqrt{T}

31
New cards

What is the PRS92 province code for Ifugao, Apayao, and Metro Manila?

Ifugao: IFU; Apayao: APA; Metro Manila: MMA

32
New cards

What is the PRS92 province code for Zamboanga Sibugay and Sultan Kudarat?

Zamboanga Sibugay: ZSI; Sultan Kudarat: SKR