38 Terms

1
New cards

-laying out of building

-process of relocating the point boundaries and property line of the site

Staking out

2
New cards

horizontal boards used to established the height of the finish foundation and to support the guidelines for the excavation of footing trenches.

Batterboard

<p>Batterboard</p>
3
New cards

distance of batter board from excavation

1.2 to 3 meters

4
New cards

vertical and horizontal line check

Spirit Level

<p>Spirit Level</p>
5
New cards

vertical line check

Plumbob

<p>Plumbob</p>
6
New cards

horizontal line check

Leveling hose

<p>Leveling hose</p>
7
New cards

manual method of squaring the corners of building lines in staking

3-4-5 multiple (steel tape)

<p>3-4-5 multiple (steel tape)</p>
8
New cards

temporary structure to support concrete

Formwork

<p>Formwork</p>
9
New cards

Wall formwork

<p>Wall formwork</p>
10
New cards

Metal formwork

<p>Metal formwork</p>
11
New cards

Panel formwork

<p>Panel formwork</p>
12
New cards

Aluminum table formwork

<p>Aluminum table formwork</p>
13
New cards

Climbing formwork

<p>Climbing formwork</p>
14
New cards

Circular formwork

<p>Circular formwork</p>
15
New cards

wood or other material to produce groove

Rustification strip

<p>Rustification strip</p>
16
New cards

wood strip to indicate top of concrete lift

Grade strip

<p>Grade strip</p>
17
New cards

materials for formwork?

Plywood, Fiberboards, Phenolic

18
New cards

to support top rebars

High chair

<p>High chair</p>
19
New cards

to support bottom rebars

Bolster

<p>Bolster</p>
20
New cards

type of formwork

Continuous rib type

<p>Continuous rib type</p>
21
New cards

type of formwork

Stud type

<p>Stud type</p>
22
New cards

temporary supports to carry forms for beams and slabs

Shoring

<p>Shoring</p>
23
New cards

Shoring parts

<p>Shoring parts</p>
24
New cards

Shoring parts

<p>Shoring parts</p>
25
New cards

materials for shoring?

Lumber, steel

26
New cards

temporary supports for workers

Scaffolding

<p>Scaffolding</p>
27
New cards

Scaffolding parts

<p>Scaffolding parts</p>
28
New cards

Scaffolding parts

<p>Scaffolding parts</p>
29
New cards

Scaffolding parts

<p>Scaffolding parts</p>
30
New cards

Scaffolding parts

<p>Scaffolding parts</p>
31
New cards

Scaffolding parts

<p>Scaffolding parts</p>
32
New cards

2x2stock- columns, beams bottom, girder bottom

1x1stock- floor panels, beams sides, girder sides

2x4stock- struts, posts, shores, uprights

1x1 or 2x2- cleats

Sizes of lumber for formworks and shoring

33
New cards

used to prevent concrete from adhering to the wood

crude oil (petroleum)

34
New cards

minimum thickness of plywood for formworks?

1/2 "thk

35
New cards

wooden sticks used as posts sharpened at one end driven into the ground to serve as boundaries or supports of the batter

Stake

<p>Stake</p>
36
New cards

metal ties for keeping formworks

Formtie

<p>Formtie</p>
37
New cards

Formtie samples

<p>Formtie samples</p>
38
New cards

Pipe clamps

<p>Pipe clamps</p>