Becc Test 1

5.0(1)
studied byStudied by 43 people
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
Card Sorting

1/122

encourage image

There's no tags or description

Looks like no tags are added yet.

Study Analytics
Name
Mastery
Learn
Test
Matching
Spaced

No study sessions yet.

123 Terms

1
New cards

What is the purpose of PQS?

A program that trains for watches or duties necessary for the safe operation of the ship

2
New cards

2. What is contained in Series 100s 200s and 300s of the PQS book?

100 Series - Fundamentals 200 Series - Systems 300 Series - Watchstations

3
New cards

What does the PQS program define to be the minimum skills necessary to stand watches and perform duties?

Pre-requisites

4
New cards

What is a routine action that is performed at a watch station?


Tasks

5
New cards

What is an emergency (?)

Fire, flooding, active shooter, etc.

6
New cards

Who is the central point of contact for all PQS matters?

Unit Coordinator

7
New cards

Who enters PQS qualifications into the record?

Division Officer/DIVO

8
New cards

What does the LCPO do for the PQS program?

Checks and signs qualifications

9
New cards

Who is the final qualification authority?

CO

10
New cards

Who signs individual line items on the PQS?

Qualified personnel

11
New cards

Who maintains the list of qualified signers for the PQS?

Unit Coordinator

12
New cards

Who is the PQS program designed to provide qualifications to perform specific duties


Enlisted AND officers

13
New cards

If there is an impact noise of 143 dBA what hearing protection is required?


Single

14
New cards

When handling fluids what type of eye protection is required?


Non-vented

15
New cards

What type of PPE must be splash resistant?


Vented goggles

16
New cards

What do face shields protect from?


Splashes, drops, liquids, etc

17
New cards

. When disconnecting ship-to-shore sewage, what type of sight protection is used?

Face shields

18
New cards

Who is overall responsible for the establishment of a sight conservation program?

Commanding Officer/CO

19
New cards

Who evaluates for sight hazards not previously evaluated?

Safety Officer

20
New cards

Who ensures maintenance is completed on eye wash stations?

Department Head

21
New cards

Who must wear protective eyewear properly?

All hands!!

22
New cards

What must you inspect on hoods and helmets that would prevent secure breathing?

Rips and tears

23
New cards

How often is a hearing test conducted?

Annually

24
New cards

How many hearing protection devices does double hearing consist of….?

TWO

25
New cards

What is the direct responsibility of a safety officer?

Safety

26
New cards

What gloves are used when working with sharp objects?

Leather gloves

27
New cards

. What PPE should be worn when handling synthetic lube oil?

Chemical goggles

28
New cards

What should be worn when grinding or chiseling?

Chipping goggles

29
New cards

What type of hearing should be worn in conjunction with double hearing protection

Muffs

30
New cards

How many EEBDs are required in engine rooms?

Twice as much or 200%

31
New cards

What is the color of the case for an actual EEBD and one for training?

ORANGE and BLUE, respectively

32
New cards

If there are 10 watch-standers in the engine room, how many EEBDs should there be?

20, 200%

33
New cards

How many minutes does an EEBD last in use?

10 minutes

34
New cards

What is the service life of an EEBD?

15 years

35
New cards

What should you use an EEBD for?

Emergency escape

36
New cards

What don’t you do with an EEBD?

Firefighting

37
New cards

The indicator needle should be on what before use?

Green!

38
New cards

You must remove the EEBD from service if there has been any

____Tampering

39
New cards

What is the mask of an EEBD made of?

Teflon

40
New cards

Where do you typically find an EEBD store?

At watch stations and your racks

41
New cards

When should you not mark EEBD stowage cabinets?

When they are installed under berths

42
New cards

What ranges are small micrometers typically made with

1-in range

43
New cards

Torque wrenches are what type of measuring device?

Precision measuring devices

44
New cards

What is a torque wrench used to measure?

The tightness of a fastener

45
New cards

What tool is used to cut internal threads and materials?

Taps

46
New cards

What tool is used to cut external threads on an object?

Dies

47
New cards

What type of saw is best used to cut through a piece of metal?

Hacksaw

48
New cards

What types of pliers are best used for working in tight spaces?

Needle-nose pliers

49
New cards

When forming a piece of metal what type of tool would you use?

Ball-pen Hammer

50
New cards

What tool would you use when measuring small holes? (?)

Telescoping gauge

51
New cards

What is the max amount of extension cords you can connect?

2 cords

52
New cards

T/F: you can use a spliced power cord

False

53
New cards

What document is a detailed procedure for performing maintenance?

Maintenance Requirement Card (MRC)

54
New cards

Where is the list of materials required to perform maintenance located?

Front of MRC

55
New cards

When you complete your maintenance, who do you notify?

Work Center Supervisor

56
New cards

When a problem is discovered in the MRC what do you submit?

A Feedback Report

57
New cards

T/F: To verify the MRC you use the periodicity code on the LOEP

False, it’s MRC -> MIPS -> LOEP

58
New cards

T/F: The PMS schedule is used to verify the MRC

False

59
New cards

Who makes up the weekly PMS schedule?

Work Center SupervisorAnything related to weekly PMS is typically WCS

60
New cards

How do you verify the MRC?

By checking the MIP control number on the Weekly Schedule, then cross-referencing the MRC number from the MIP with the one on the MRC. (( tl;dr: check the MIP)

61
New cards

Who maintains the LOEP?

Work Center Supervisor

62
New cards

What program is designed to manage materials and resources?

3-M Program

63
New cards

Who directly supervises the administrative portion of the 3-M program?

3-MC (3-M Coordinator)

64
New cards

T/F: PMS is contained within the 3-M system?

True

65
New cards

What does the PMS provide?

A standardized method for implementing all preventative maintenance performed by the Ship’s Force

66
New cards

Who can authorize changes made to the work center’s quarterly schedule?

Divisional Officer/DIVO

67
New cards

What is an assessment of previously completed maintenance items?

Spot check

68
New cards

What type of actions prevent the equipment’s deterioration? and

Periodic maintenance

69
New cards

What IEM status is the equipment in if it is to remain onboard, not scheduled for corrective maintenance or overhaul?

Status I

70
New cards

Who is responsible for designating the QAO?

Commanding Officer

71
New cards

Who is responsible for reviewing and approving the formal work package?

Department Head

72
New cards

Who ensures the test measuring and diagnostic equipment has current calibration stickers?

Craftsman

73
New cards

Who verifies that work has been completed by entering their initials and signature on all applicable QA forms?

QAI

74
New cards

Who verifies that completed test results for controlled work fully satisfy test requirements and initiates corrective action if they don’t?

QAO

75
New cards

Who coordinates and administers the QA program in their respective work center?

QAI

76
New cards

Level 1 materials must be closely tracked and controlled by who?

Control Material PO (CMPO)

77
New cards

What must be used to identify and trace controlled materials?

Quality Assurance Tags

78
New cards

Which form is used to authorize the start of work on all ship’s systems and equipment by activities other than the Ship’s Force?

Work Authorization Form (WAFs)

79
New cards

Which QA document is used to record and authorize deviations from technical documents?

Departure from Specifications (DFS)

80
New cards

What is used to indicate a step in a work procedure that must be performed correctly the first time and requires close supervision?

Q-Points (Critical Quality Control Points)

81
New cards

What are non-crew members that perform ship maintenance?

Repair Activity (RAs)

82
New cards

When a hazard can harm personnel or equipment, what type of tag must be used?

Danger

83
New cards

When special instructions are required what tag must be used?

Caution

84
New cards

A second person may accompany the first checker?

False

85
New cards

Who authorizes the removal of tags?

Authorizing Officer (AO)

86
New cards

While performing a tag-out audit what must you verify?

Conditions are correct

87
New cards

Who is responsible for ensuring personnel have signed and followed the TUM?

AO

88
New cards

What instruction provides tag-out standards?

The TUM

89
New cards

Who is in charge of the tag-out log while underway?

EOOW

90
New cards

Who is in charge of the tag-out log while In port?

EDO

91
New cards

What color are caution tags?

Yellow

92
New cards

What color are danger tags?

Red

93
New cards

Out of Cal tags?

Orange

94
New cards

What tag is used to prohibit the operation of equipment?

Danger

95
New cards

What technical document does a person look at to ensure correction conditions(?)

TORs

96
New cards

Who is responsible for the issuing and removal of tags?

Authorizing Officer (AO)

97
New cards

How often do tag-out audits occur?

Performed at a minimum of every 2 weeks

98
New cards

Who determines if tag-outs require the CO’s permission?

Authorizing Officer (AO)

99
New cards

Who do you report all tag-out discrepancies to?

Authorizing Officer (AO)

100
New cards

Who must you notify if the tag-out will affect the ship’s damage control capabilities?

Damage Control Center (DCC)