1/11
Looks like no tags are added yet.
Name | Mastery | Learn | Test | Matching | Spaced |
---|
No study sessions yet.
Symptoms and Entry Conditions
Emergency declared by Security Supervision
Specific Credible Threat
Airborne threat
Aircraft Levels of Threat
Imminent
Probable
Informational
Imminent
ETA: 5min or less
Probable
ETA: 30min or less (Pizza is probable)
Informational
ETA: >30min (Free Pizza)
What if Attack INSIDE PA?
E-0 while CONTINUING A-904 (Step 1)
NRC Notification
15 MINUTES from threat discovery
***This is NOT EAL guidance, this is a separate requirement SPECIFIC to security threats
Hostile Attack Attachment 1 Actions
Always Trip, E-0
Lock Doors
Actuate VES (Div. ABC Restore VBS per SOP)
Borate to MODE 5 No Xe via AOP-102
Stop Fuel Movement
Close Containment Hatches
Fill all Makeup Water Tanks to MAX (PCCWST, DWST, FPS)
Tanks that are filled to maximum
Airborne Threat Attachment 2 Actions
TRIP WHEN Imminent (<5min)
Shutdown WHEN Probable
Lock Doors
Actuate VES
Stop Fuel Movement
Close Containment Hatches
Dispatch an RO & SRO to RSR
Fill all Makeup Water Tanks to MAX (PCCWST, DWST, FPS)
MCR Heat Input Limitations
Locked Closed door D01
≤11 people
≤Laptops
No Temp. Electrical Loads
Actions if NO MCR Supply SOV Opens on VES Act.
(VES-V005A/B)
LOCALLY Open 3-VES-V001
LOCALLY Unlock and Close V044
VES/MCR Tech Spec Values (3.7.6)
Temperature
Quantity
Flow
<75F
>327,574 scf
>60scfm
Key Stage 1 and 2 Loads
When does each stage shed?
Stage 1 (At actuation)
Normal lighting, Receptables, Plant Status Display 1&2(False WPIS’s)
Stage 2 (3 hours after actuation)
All WPIS, LAN Stations
*Greater than 24hrs from actuation: shed additional emergency lighting panels, ALL laptops
Personnel Report Locations
Essential
Non-Essential
Essential
TSC (Technical Support Center - Inside PA)
Non-Essential
Training Building