Consultation
When a Client calls upon the Architect to give oral or written advice and direction, to attend conferences, to make evaluations and appraisals regarding a contemplated project and similar activities, the Architect renders valuable inputs whether or not the Client pursues the project.
Pre-Feasibility Studies
These preliminary studies involve the procurement, analysis and use of secondary information gathered for the project to aid the Client in early decision-making. They represent the Architect’s initial assessment of a project’s soundness, allowing the Client to promptly explore available/ readily identifiable directions/ options. Researched/ processed/ validated secondary data are generally used for such studies e.g. electronic, print, etc.
Feasibility Studies
Detailed analysis of the project based on pre-feasibility studies will determine the viability of a proposed development. The studies will set the project against present and future trends to forecast how it will perform over time. This requires primary data gathering and analysis.
Site Selection and Analysis
This entails the formulation of site criteria, assistance to the Client in site evaluation as well as analysis to determine the most appropriate site/s for a proposed project or building program.
Site Utilization and Land-Use Studies
The detailed analysis of the site involves the identification of a site’s development potentials through the proper utilization of land. The analysis covers the context of the site as well as that of its surrounding environment and the development controls that apply to the site and its environs.
Architectural Research
Architectural research entails the conduct of primary and secondary researches and assembled facts used as basis for conclusion.
Architectural Programming
This analytical problem-seeking process will lead to the statement and identification of both horizontal and vertical requirements in offering a solution. It incorporates a space program with characterizations of the envisioned spaces such as ambiance, cost range, etc.
Space Planning
The Architect determines the adequate size and appropriate configuration and assemblage for a proposed project in consideration of the use, allocation and interface of spaces for given activities. Space planning is done mainly through primary data gathering such as interviews, consultations, interfaces, focus group discussions (FGDs), space planning surveys, space audits, etc. and subsequent analyses i.e. spatial layouts with stacking concepts, particularly for multi-storey structures.
Space Management Studies
An analysis of the space requirements of the project based on organizational structure and functional set-up pinpoints linkages and interaction of spaces. The formulation of the space program will serve as the basis for the development of the architectural plan/design.
Value Management
This technique is applied in the cost management process to minimize the negative effect of simplified operations associated with many cost-reduction programs. The goal of value management is to achieve an unimpaired program at minimum cost. Thus, a plan, design or system that has been successfully value-managed will still satisfy the same performance criteria as the costlier alternatives.
Design Brief Preparation
Under design brief preparation, the Architect states the project terms of reference (ToR) including the concept, objectives and other necessary requirements to bid out architectural services (whether public or private).
Promotional Services
Projects may require promotional activities in order to develop and generate financial support and acceptance from governing agencies or from the general public. In such cases, the Architect can act as the agent of the Owner by producing and coordinating the additional activities necessary to complete the services. In all such activities, the Architect must maintain his professional status as the representative of the Owner
Multiple of Direct Personnel Expenses
This cost-based method of compensation is applicable only to non-creative work such as accounting, secretarial, research, data gathering, preparation of reports and the like. This method of compensation is based on technical hours spent and does not account for creative work since the value of creative design cannot be measured by the length of time the designer has spent on his work. The computation is made by adding all costs of technical services (man hours x rate) and then multiplying it by a multiplier to cover overhead and profit.
Professional Fee Plus Expenses
This method of compensation is frequently used where there is continuing relationship involving a series of Projects. It establishes a fixed sum over and above the reimbursement for the Architect’s technical time and overhead. An agreement on the general scope of the work is necessary in order to set an equitable fee.
Lump Sum or Fixed Fee
This method may be applied to government projects since they entail more paper work and time-consuming efforts.
In some cases a Client may request an Architect to do work which will require his personal time such as:
attending project-related meetings, conferences or trips;
conducting ocular inspection of possible project sites; and
conferring with others regarding prospective investments or ventures and the like.
Mixed Methods of Compensation
The SPP provides for more than one method of compensation on a project. Each project should be examined to determine the most appropriate and equitable method of compensation.
Multiple of Direct Personnel Expenses
Professional Fee Plus Expenses
Lump Sum or Fixed Fee
Per Diem, Honorarium Plus Reimbursable Expenses
Mixed Methods of Compensation
Enumerate the Method of Compensation