SPP Document 201

0.0(0)
Studied by 0 people
call kaiCall Kai
Locked
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
GameKnowt Play
Card Sorting

1/17

encourage image

There's no tags or description

Looks like no tags are added yet.

Last updated 12:59 AM on 9/16/26
Name
Mastery
Learn
Test
Matching
Spaced
Call with Kai
Chat

No analytics yet

Send a link to your students to track their progress

18 Terms

1
New cards

Consultation

When a Client calls upon the Architect to give oral or written advice and direction, to attend conferences, to make evaluations and appraisals regarding a contemplated project and similar activities, the Architect renders valuable inputs whether or not the Client pursues the project.

2
New cards

Pre-Feasibility Studies

These preliminary studies involve the procurement, analysis and use of secondary information gathered for the project to aid the Client in early decision-making. They represent the Architect’s initial assessment of a project’s soundness, allowing the Client to promptly explore available/ readily identifiable directions/ options. Researched/ processed/ validated secondary data are generally used for such studies e.g. electronic, print, etc.

3
New cards

Feasibility Studies

Detailed analysis of the project based on pre-feasibility studies will determine the viability of a proposed development. The studies will set the project against present and future trends to forecast how it will perform over time. This requires primary data gathering and analysis.

4
New cards

Site Selection and Analysis

This entails the formulation of site criteria, assistance to the Client in site evaluation as well as analysis to determine the most appropriate site/s for a proposed project or building program.

5
New cards

Site Utilization and Land-Use Studies

The detailed analysis of the site involves the identification of a site’s development potentials through the proper utilization of land. The analysis covers the context of the site as well as that of its surrounding environment and the development controls that apply to the site and its environs.

6
New cards

Architectural Research

Architectural research entails the conduct of primary and secondary researches and assembled facts used as basis for conclusion.

7
New cards

Architectural Programming

This analytical problem-seeking process will lead to the statement and identification of both horizontal and vertical requirements in offering a solution. It incorporates a space program with characterizations of the envisioned spaces such as ambiance, cost range, etc.

8
New cards

Space Planning

The Architect determines the adequate size and appropriate configuration and assemblage for a proposed project in consideration of the use, allocation and interface of spaces for given activities. Space planning is done mainly through primary data gathering such as interviews, consultations, interfaces, focus group discussions (FGDs), space planning surveys, space audits, etc. and subsequent analyses i.e. spatial layouts with stacking concepts, particularly for multi-storey structures.

9
New cards

Space Management Studies

An analysis of the space requirements of the project based on organizational structure and functional set-up pinpoints linkages and interaction of spaces. The formulation of the space program will serve as the basis for the development of the architectural plan/design.

10
New cards

Value Management

This technique is applied in the cost management process to minimize the negative effect of simplified operations associated with many cost-reduction programs. The goal of value management is to achieve an unimpaired program at minimum cost. Thus, a plan, design or system that has been successfully value-managed will still satisfy the same performance criteria as the costlier alternatives.

11
New cards

Design Brief Preparation

Under design brief preparation, the Architect states the project terms of reference (ToR) including the concept, objectives and other necessary requirements to bid out architectural services (whether public or private).

12
New cards

Promotional Services

Projects may require promotional activities in order to develop and generate financial support and acceptance from governing agencies or from the general public. In such cases, the Architect can act as the agent of the Owner by producing and coordinating the additional activities necessary to complete the services. In all such activities, the Architect must maintain his professional status as the representative of the Owner

13
New cards

Multiple of Direct Personnel Expenses

This cost-based method of compensation is applicable only to non-creative work such as accounting, secretarial, research, data gathering, preparation of reports and the like. This method of compensation is based on technical hours spent and does not account for creative work since the value of creative design cannot be measured by the length of time the designer has spent on his work. The computation is made by adding all costs of technical services (man hours x rate) and then multiplying it by a multiplier to cover overhead and profit.

14
New cards

Professional Fee Plus Expenses

This method of compensation is frequently used where there is continuing relationship involving a series of Projects. It establishes a fixed sum over and above the reimbursement for the Architect’s technical time and overhead. An agreement on the general scope of the work is necessary in order to set an equitable fee.

15
New cards

Lump Sum or Fixed Fee

This method may be applied to government projects since they entail more paper work and time-consuming efforts.

16
New cards

In some cases a Client may request an Architect to do work which will require his personal time such as:

  • attending project-related meetings, conferences or trips;

  • conducting ocular inspection of possible project sites; and

  • conferring with others regarding prospective investments or ventures and the like.


17
New cards

Mixed Methods of Compensation

The SPP provides for more than one method of compensation on a project. Each project should be examined to determine the most appropriate and equitable method of compensation.

18
New cards
  1. Multiple of Direct Personnel Expenses

  2. Professional Fee Plus Expenses

  3. Lump Sum or Fixed Fee

  4. Per Diem, Honorarium Plus Reimbursable Expenses

  5. Mixed Methods of Compensation


Enumerate the Method of Compensation