1/49
A set of 50 vocabulary flashcards covering Aggregate Planning, Inventory Management, MRP, Scheduling, and Linear Programming based on the SCM 411 lecture notes.
Name | Mastery | Learn | Test | Matching | Spaced | Call with Kai | Chat |
|---|
No analytics yet
Send a link to your students to track their progress
Aggregate planning
Intermediate range capacity planning that typically covers a time horizon of 2 up to 18 months.
Aggregate planning goal
Achieve a production plan that will effectively utilize the organizations resources to satisfy demand.
Pricing (Demand Option)
Used to shift demand from peak to off peak periods where price elasticity is important.
Back orders (Aggregate Planning)
Orders are taken in one period and deliveries promised for a later period.
New demand
The creation of demand to absorb excess capacity generated due to peak time demands.
Level capacity strategy
Maintaining a steady rate of regular-time output while meeting variations in demand by a combination of options.
Chase demand strategy
Matching capacity to demand; the planned output for a period is set at the expected demand for that period.
Perpetual inventory system
System that keeps track of removals from inventory continuously, thus monitoring current levels of each item.
Two-bin system
Inventory system using two containers; a reorder is placed when the first is empty.
Universal bar code
A bar code printed on a label that has information about the item to which it is attached.
Periodic inventory system
A system involving a physical count of items made at periodic intervals.
Class A items
Inventory items that represent 5−15% of units and 70−80% of value.
Class B items
Inventory items that represent 30% of units and 15% of value.
Class C items
Inventory items that represent 50−60% of units and 5−10% of value.
Economic Production Quantity (EPQ) objective
To determine a production lot size that minimizes total annual inventory costs when production occurs periodically.
Reorder point (ROP)
The inventory level at which a new order should be placed, calculated as ROP=d×LT.
Materials Requirement Planning (MRP)
A computer-based information system that translates finished product requirements into time-phased requirements for subassemblies, parts, and raw materials.
Master schedule
States which end items are to be produced, when they are needed, and in what quantities.
Bill of materials (BOM)
A listing of all the raw materials, parts, subassemblies, and assemblies needed to produce one unit of a product.
Time buckets
Information on the status of each item by time period within inventory records.
Planned orders
A schedule indicating the amount and time of future orders.
Order releases
Authorizing the execution of planned orders.
Performance-control reports
Evaluation of system operations, including deviations from plans and cost information.
Exception reports
Data on any major discrepancies encountered within the MRP system.
Lot-for-lot ordering
The order or run size is set equal to the demand for that period.
Lot size ordering
The lot size is predetermined due to packaging, shipping, or production considerations.
Scheduled receipts
Quantities that will be received in some future periods as their corresponding orders have been released in the past.
Projected on hand
The inventory projected to be physically present in the facility in a future period.
Net requirement
A quantity of an item that must be purchased or manufactured to fully deliver independent demand requirements.
Planned order receipt
Quantities that must be planned to be received in a particular time period in order to meet the net requirements.
Planned order releases
Quantities that must be planned to be released in a period in order to receive them in a future time period.
Pegging
The process of identifying the parent items that have generated a given set of material requirements for an item.
Backflushing
Exploding an end item’s BOM to determine the quantity of the components that were used to make the item.
Scheduling
Establishing the timing of the use of equipment, facilities, and human activities in an organization.
Load chart
A Gantt chart that shows the loading and idle times for a group of machines or a list of departments.
Schedule chart
A Gantt chart that shows the orders or jobs in progress and whether they are on schedule.
Infinite loading
Jobs are assigned to workstations without regard to the capacity of the work center.
Finite loading
Jobs are assigned to work centers taking into account the work center capacity and job processing times.
Sequencing
Determining the order in which jobs at a work center will be processed.
Johnson’s rule
A sequencing technique for scheduling jobs at two work centers to minimize total idle time.
Theory of constraints
Production planning approach that balances flow throughout a system and centers improvement around restrictive constraints.
Cyclical scheduling
Assigning employees to work shifts or time slots and days off on a repeating basis.
Objective function
A mathematical statement of profit or cost for a given solution in an LP problem.
Decision variables
Amounts of either inputs or outputs represented in a linear programming model.
Constraints
Limitations that restrict the available alternatives in linear programming.
Feasible solution space
The set of all feasible combinations of decision variables as defined by the constraints.
Binding constraint
A constraint that forms the optimal corner point of the feasible solution space and effectively limits the objective function value.
Redundant constraint
A constraint that does not form a unique boundary of the feasible solution space.
Shadow price
The amount by which the objective function value would change if a constraint's RHS is increased by one unit.
Maximum inventory (Imax)
Calculated in the EPQ model as Q×(1−u/p), where u is usage rate and p is production rate.