100% Rule,
States that the Work Breakdown Structure (WBS) must include 100% of the work defined in the project scope
Acceleration
The use of methods to complete work in a shorter time than previously planned or required
Accepted Deliverables
Deliverables that have been formally accepted by the client through formal sign-off
Activity
A task or set of tasks carried out to create a deliverable
Activity Attributes
The elements associated with each scheduled activity including codes, predecessors, successors, relationships, leads, lags, resource requirements, constraints, assumptions, and imposed dates
Activity Duration Estimates
Quantitative assessments of the likely time required to complete an activity
Activity List
A detailed list of all planned project activities
Actual Cost (AC)
The amount of money actually spent to date on the project
Actual Duration
The actual amount of time a task has taken from start to completion or to the current point if still in progress
Backward Pass
A technique used to calculate Late Start and Late Finish dates by working backward through the network diagram
Baseline
The final approved version of the project scope, schedule, and cost
Basis of Estimates
A document explaining how estimates were developed and the supporting information used
Benefits Management Plan
A document describing how project benefits will be realized and managed
Beta Distribution (PERT)
A weighted average estimate giving the most weight to the most likely estimate to improve accuracy
Bottom-up Estimation
Estimating individual activities and combining them to determine the total project cost and duration
Budget at Completion (BAC)
The planned total budget for the entire project
Buffer
Extra time allocated to account for uncertainty, constraints, or delays
Change
A proposed modification to any project document, plan, deliverable, or work product
Change Control
A structured process for reviewing, analyzing, approving, implementing, and documenting change requests
Change Control Board (CCB)
The group responsible for approving or rejecting change requests
Change Control Plan
A document describing how project changes will be identified, evaluated, approved, communicated, and implemented
Change Log
A record used to track project changes and their status
Change Request
A formal proposal to modify any aspect of the project baseline
Closing Process Group
The process group used to formally complete the project, phase, or contract and obtain customer acceptance;
Code of Accounts
A numbering or lettering system that uniquely identifies each WBS component
Conceptual Estimate
An early estimate developed using prototypes, designs, mockups, or similar concepts to reduce uncertainty
Configuration Management Plan
A document describing how configuration items will be identified, tracked, controlled, and audited
Control
Activities used to monitor, measure, and adjust project performance
Control Accounts
Management control points where scope, schedule, and cost are integrated and measured
Cost Aggregation
The process of combining individual cost estimates into a total project cost
Cost Baseline
The approved project budget excluding management reserves
Cost Management Plan
A document describing how project costs will be planned, managed, and controlled
Cost Performance Index (CPI)
A measure of cost efficiency calculated as Earned Value divided by Actual Cost
Cost Variance (CV)
The difference between Earned Value and Actual Cost
Crashing
A schedule compression technique that adds resources to shorten project duration
Critical Chain
The longest chain of dependent activities considering both task dependencies and resource availability
Critical Path
The sequence of activities that determines the shortest possible project duration
Critical Path Method (CPM)
a project management technique for determining the project schedule using the network diagram
Deadline
the latest date or time by which a task or project should be completed
Decomposition
breaking down project deliverables into smaller, more detailed, and manageable work packages.
Definitive estimate
determined at the end of the planning phase, hence providing the most accurate cost estimation
Dependencies, Logical relationships:
relationships between tasks that determine their order in a project
Discretionary dependency, Soft, preferred, or preferential logic:
created based on the preference of the project team and the order of
activities they find more suitable or the nature of work.
Dropped Baton
refers to the impact of poor coordination when an activity is completed early and the resources or the new dependent activity are not ready, thus the time gained by completing the activity early is lost.
Early Finish (EF)
refers to the earliest possible date that a task or activity can be completed
Early Start (ES)
refers to the earliest possible date that a task can begin
Earned Value (EV)
Measures the budgeted value of work realized to date. It’s calculated to determine whether the project is on track, behind or ahead of schedule, and over or under budget.
Earned Value Management (EVM)
The process of performance measurement by monitoring project progress and comparing its actual performance to its planned performance.
Estimate at Completion (EAC)
The expected total cost of completing all work expressed as the sum of the actual cost to date and the estimate to complete.
Estimate to Complete (ETC)
The expected cost to finish all the remaining project work.
Estimating methods
Methods used to develop an approximation of work, time, or cost on a project.
Executing process group
Performed to implement the work defined and detailed in the planning process group. This group involves carrying out all planned activities to produce the project deliverables according to requirements.
Expert judgment estimating
making estimations based on the skill, expertise, or specialized knowledge of the project team, independent consultants, or subject-matter agencies.
External dependency
the type of dependency between project activities and non-project activities that is outside of the direct influence or control of the project team, but must nonetheless be accounted or when planning or managing a project schedule
Float, Total Float, Slack
the amount of time that a task can be delayed without affecting the completion date of the project. Total Float can be calculated either by subtracting the Early Start date of the activity from its Late Start date or its Early Finish date from its Late Finish date. Critical path activities have zero float.
the process of making predictions, guesses, or assumptions of the possible outcomes of a project.
moving forward through a network diagram to calculate the early start and early finish values, meaning the earliest day each project task can begin and wrap up
the amount of time that an activity can be delayed without delaying the Early Start date of its successor activity
Gantt chart, Bar chart
A bar chart created to depict the scheduled activities’ duration and sequence; activities are listed on vertical bars, their start and finish dates are displayed across the top of the chart, and their durations are shown as horizontal bars.
Performing work that was neither requested nor approved by the client, aiming to deliver added value.
a phase-end review that allows the organization to evaluate the project's performance and take immediate action to correct any problems or even cancel the project, hence the name kill point.
the amount of time whereby a successor activity is required to be delayed with respect to a predecessor activity.
is a negotiable dependency that means that the next task can't be started until the previous one has been completed.
Parametric estimating
uses statistical relationships and historical data to estimate the cost, duration, or resource requirements of a project or activity based on specific measurable parameters.
Performance review
a technique used to gauge, compare, and analyze the performance of work in progress against the baseline of the project.
Planning process group
Involves developing the project management plans including its budget, schedule, assignments, and responsibilities.
defines the logical sequence between tasks, indicating the order in which activities must be performed. There are our types of dependencies: finish-to-start, start-to-start, finish-to-finish, and start-to-finish.
Predictive approach, Plan driven approach, Traditional approach, Waterfall
A development approach in which the project scope, time,
and cost are determined in the early phases o the life cycle.
carried out at the beginning of the project based on historical data of other projects to provide a high-level estimate of the cost and time required or completing the project.
Ranged estimating
The process of estimating a minimum and maximum value or cost or schedule.
Requirements Management Plan
describes how project requirements will be analyzed, documented, and managed.
Requirements Traceability Matrix (RTM)
A grid that links product requirements from their origin to the deliverables that satisfy them.
A method used to evaluate the amount of risk on the project and the amount of schedule and budget reserve to determine whether the reserve is sufficient or the remaining risk.
Consists of altering the duration or the sequence of activities according to resources’ availability to avoid any overallocation. This can lead to changes in schedule.