Benchmark

an elevation that has already been agreed upon, marked with brass pins, hammered on sidewalk

2
New cards

field mark

establishes a 0 elevation mark on a local site, often done on a tree that’s not cut down that can be readily seen

3
New cards

storm water addresses…

  • too much water: detention

  • too dirty water: retention

    or BOTH

4
New cards

2 (interrelated) problems with Retention of dirty water

  1. impervious cover

  2. mom-point source pollution

5
New cards

Retention

to hold polluted water out of the system

example: retention ponds

6
New cards

“if its always wet, its ______”

Retention!

7
New cards

Detention

to restrain the speed of storm water entering system

8
New cards

For schematic sizing detention/retention, __% of site area OR _% of pervious area (whichever’s largest) are good rules of thumb

10%

25%

9
New cards

detention basins are used for sites over ___ acres (bigger sites)

10

10
New cards

Infiltration basins are used for ___ sites

smaller

11
New cards

small site infiltration

infiltration trench, aka rain garden - can grow to be a bio-swale

12
New cards

storm water management is required on sites greater than __ acre

1