Pr9904 - Specification for Pressure Pipe Construction

0.0(0)
Studied by 0 people
call kaiCall Kai
Locked
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
GameKnowt Play
Card Sorting

1/5

encourage image

There's no tags or description

Looks like no tags are added yet.

Last updated 5:46 AM on 7/29/26
Name
Mastery
Learn
Test
Matching
Spaced
Call with Kai
Chat

No analytics yet

Send a link to your students to track their progress

6 Terms

1
New cards

List the 14 Sections outlined in the Table of Contents?

  1. Purpose

  2. Scope

  3. General Requirements

  4. Clearing & Grubbing

  5. Pipeline Trench Excavation

  6. Laying & Jointing Pipes

  7. Welded Joints in MSCL Pipelines

  8. Pipeline Valves

  9. Thrust Blocks

  10. Embedment

  11. Trench Fill

  12. Construction Finishes

  13. Acceptance Testing of Pressure Mains

  14. Restoration & Finishing Works

2
New cards

What 6 Pipe Materials do these apply to?

  1. Ductile Iron (DI)

  2. Poly-Vinyl Chloride (PVC)

  3. Glass Filament Reinforced Thermosetting Plastic (GRP)

  4. Mild Steel (MS)

  5. Acrylonitrile Butadiene Styrene (ABS)

  6. Polyethylene (PE)

3
New cards

What Specification should this be read in conjunction with?

Pr11034 - Specification for Trunk Water Main Design & Construction Code (TWM Code)

4
New cards

What is stipulated in Clause 3.2 - Information to be supplied by the Manufacturer?

If there is an item that is not captured in the spec, then Approval from UW will be needed.

It also requires that as per the Contractor’s Quality Management Plan, all PE pipe >DN315 shall be supplied with a “Certificate of Compliance” from the manufacturer promising compliance with

  • AS/NZS 4130: PE pipes for pressure applications.

  • AS/NZS 4131: PE Compounds

  • PIPA POP004: PE Pipes and Fittings Compounds

This is essentially to ensure compliant features of the following:

  1. Product Specification Sheets

  2. Product Certificate or Analysis

  3. QA Production Performance Sheets

  4. OIT Testing Results, incl. details on Thermal Stability in relation to pipe size

  5. Extrusion Report Sheets (Speed, Melt Temp Control, Extruder)

  6. Extrusion Line checklist w/ wall thickness tolerances

  7. Ovality Check Sheets

5
New cards

Is an RPEQ Certification needed for ALL Temporary Works?

Yes. As per Pr9904 Clause 3.4 - Temporary Works

6
New cards