Surveying, Geodesy, and Land Law Flashcards

0.0(0)
Studied by 0 people
call kaiCall Kai
Locked
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
GameKnowt Play
Card Sorting

1/44

flashcard set

Earn XP

Description and Tags

Comprehensive vocabulary flashcards covering geodetic concepts, survey symbols, land laws (Philippines), mining terminology, and civil obligations based on the lecture transcript.

Last updated 5:20 AM on 8/1/26
Name
Mastery
Learn
Test
Matching
Spaced
Call with Kai
Chat

No analytics yet

Send a link to your students to track their progress

45 Terms

1
New cards

Geodesy

The science of measuring the earth.

2
New cards

Surveying

The science of identifying and measuring specific locations on the earth.

3
New cards

Ellipsoid

A mathematical model of the size and shape of the earth.

4
New cards

Geoid

A theoretical surface generally defined as mean sea level, used as the basis for a vertical datum and as a reference for a horizontal datum.

5
New cards

Horizontal Datum

A spheroid used as an (X,Y)(X, Y) reference to all points on the real globe.

6
New cards

Vertical Datum

The level surface to which heights (elevation) are referenced.

7
New cards

WGS84

Worldwide ellipsoid and datum created from satellite observations.

8
New cards

Luzon Datum of 1911

The national horizontal datum for the Philippines.

9
New cards

PRS92

The updated Luzon Datum of 1911 (Philippine Reference System of 1992).

10
New cards

Projection

A two-dimensional reference surface used to convert locations from a curved surface to a flat surface.

11
New cards

Scale Factor

A number that is multiplied to northing and easting values to be placed on a two-dimensional map.

12
New cards

Easting

The XX coordinates of a coordinate system used on a map.

13
New cards

Northing

The YY coordinates of a coordinate system used on a map.

14
New cards

Foreshore land

Part of the shore which is alternately covered and uncovered by the ebb and flow of the tide.

15
New cards

Salvage Zone

An easement of lands bordering the seas, gulfs, bays, or ports measured landward from the interior limit of the shoreline.

16
New cards

Easement of Coast Police

The obligation to leave a Right-of-Way 6meters6\,meters wide within the Salvage Zone.

17
New cards

Buffer Zone

A strip of land with natural or established vegetation providing an added layer of protection to natural forests, usually between 5050 to 100meters100\,meters from the shoreline.

18
New cards

Arroyo

A narrow natural bed or channel through which water flows continuously or intermittently throughout the year.

19
New cards

Estero

Any bed or channel through which stagnant, dirty, or salt water flows under the influence of the tides.

20
New cards

Creek

A stream of water longer than a brook that empties into the rivers.

21
New cards

River

Any wide natural bed or channel through which water flows continuously or intermittently throughout the year.

22
New cards

Personal error

Errors due to the limitations of human senses of sight or touch.

23
New cards

Parallax

The displacement of the image of objects with respect to other objects due to difference in their respective distances from the observer.

24
New cards

Most probable value

A mathematical term for the adjusted value which, according to the principle of least squares, has more chances of being correct than any other.

25
New cards

Complex subdivision

A subdivision of a registered land where a certain percentage of the land area is allocated for street, passageway, or open spaces.

26
New cards

Topographic map

A map showing by conventional symbols the culture, drainage, relief, and vegetation features of parts of the earth's surface.

27
New cards

Compass rule

An assumption in balancing a survey that the effects of error in angular measurements are equal to the effects of error in chaining.

28
New cards

Transit rule

An assumption in balancing a survey that angular measurements are more precise than those of chaining.

29
New cards

Adit

A horizontal or nearly horizontal passage driven from the surface for working or dewatering a mine.

30
New cards

Stope

An underground room or working area from which ore is removed.

31
New cards

Strike

The horizontal course, bearing, or azimuth of an inclined bed, stratum, or vein.

32
New cards

Dip

The angle at which a bed, stratum, or vein is inclined from the horizontal.

33
New cards

Obligation

A juridical necessity to give, to do, or not to do.

34
New cards

Quasi-contract

Juridical relations arising from lawful, voluntary, and unilateral acts based on the principle that no one shall be unjustly enriched at the expense of another.

35
New cards

Torrens System

A system of land registration where rights acquired by the registrant are guaranteed by the government.

36
New cards

Fee simple Title

Absolute title; an absolute estate in perpetuity.

37
New cards

Geodetic Control Surveys

Surveys covering extensive areas taking into account the earth's curvature for establishing a basic network of reference points (first and second order).

38
New cards

Project Control Surveys

Surveys conducted to establish reference points for projects with limited geographic coverage (primary, secondary, and tertiary control).

39
New cards

Mineral Production Sharing Agreement (MPSA)

An agreement where the Government grants the contractor the exclusive right to conduct mining operations and shares in the production.

40
New cards

Financial or Technical Assistance Agreements (FTAA)

A mining contract for large-scale exploration, development, and utilization of minerals allowing up to 100%100\% foreign equity participation.

41
New cards

First Order Geodetic Control Accuracy

Relative error of 1/100,0001/100,000 with a vertical accuracy of 4.80mm×D4.80\,mm \times \sqrt{D} (where DD is distance).

42
New cards

Primary Control Accuracy

Relative error of 1/20,0001/20,000 and linear error of 5cmperkm5\,cm\,per\,km.

43
New cards

Secondary Control Accuracy

Relative error of 1/10,0001/10,000 and linear error of 10cmperkm10\,cm\,per\,km.

44
New cards

Tertiary Control Accuracy

Relative error of 1/5,0001/5,000 and linear error of 20cmperkm20\,cm\,per\,km.

45
New cards