NPDES Level 1A Practice Test

0.0(0)
Studied by 0 people
call kaiCall Kai
Locked
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
GameKnowt Play
Card Sorting

1/49

encourage image

There's no tags or description

Looks like no tags are added yet.

Last updated 7:49 PM on 8/24/26
Name
Mastery
Learn
Test
Matching
Spaced
Call with Kai
Chat

No analytics yet

Send a link to your students to track their progress

50 Terms

1
New cards

A slope gradient of 25% (4:1) would indicate that in a horizontal length of 100 feet, the vertical rise would be ______ feet.

A) 2.5

B) 12.5

C) 25

D) 4

C) 25

2
New cards

As rain falls to the earth, what is the very first function of vegetation?

A) It reduces detachment

B) It increases infiltration

C) It absorbs rain drop impact

D) Roots hold soil in place

A) It reduces detachment

3
New cards

Because of the likelihood of thunderstorms which is the worst month to schedule land disturbing activities?

A) April

B) July

C) September

D) October

B) July

4
New cards

Which of the following is not a stage in Erosion and Sedimentation?

A) Detachment

B) Solubility

C) Transport

D) Deposition

B) Solubility

5
New cards

At what depth must sediment be removed from a silt fence barrier?

A) 12 Inches

B) 16 Inches

C) 1/4 full

D) 1/2 full

D) 1/2 full

6
New cards

When straw mulch is used to cover disturbed soil it must be maintained at a depth of ________ inches.

A) 1-2

B) 1-3

C) 2-3

D) 2-4

D) 2-4

7
New cards

If it is necessary to wash vehicle tires to remove excess sediment, the sediment run-off must be:

A) Kept at the construction exit pad

B) Filtered with hay bales

C) Directed away from the road with a diversion

D) Directed into an approved sediment trap or sediment basin

C) Directed away from the road with a diversion

8
New cards

The maintenance requirements for all BMPs are only found in the Field Manual for Erosion and Sediment Control in Georgia.

A) True

B) False

A) True

9
New cards

All land-disturbing activities covered by the E & SC Act must first secure a Land Disturbing Activity (LDA) Permit. Who is responsible for obtaining this permit?

A) Design Engineer

B) Building Contractor

C) Owner/ Operator

D) Utility Subcontractor

C) Owner/ Operator

10
New cards

If the local issuing authority's enforcement officer observed a significant amount of sediment entering state waters from a land disturbing activity the officer should do which of the following?

A) Issue a strongly worded Notice of Violation

B) Start proceedings for Forfeiture of Bonding

C) Move to revoke the company's business license

D) Issue a Stop Work Order

D) Issue a Stop Work Order

11
New cards

Spillway pipe for a temporary sediment basin cannot be constructed with a pipe smaller than _____ inches.

A) 6

B) 8

C) 10

D) 12

B) 8

12
New cards

What is the amount of over fall allowed at the end of the storm drain outlet apron?

A) 1/2 the diameter of the rip rap used

B) Not to exceed 6 inches

C) 1/2 the thickness of the apron

D) Zero

D) Zero

13
New cards

What size rocks should be used to fill gabion boxes?

A) 3 to 4 inches

B) 4 to 8 inches

C) Larger than 8 inches

D) Clean aggregate

C) Larger than 8 inches

14
New cards

A diversion constructed of compacted soil can be positioned ________ a slope.

A) Above

B) Across

C) Below

D) All of the above

B) Across

15
New cards

A temporary sediment basin's riser pipe must be anchored with a concrete foundation. The minimum thickness allowed for this foundation is ________ inches.

A) 12

B) 18

C) 24

D) 32

B) 18

16
New cards

A temporary down drain structure using a 12 inch pipe could drain up to ________ acres.

A) 0.3

B) 0.5

C) 0.4

D) 1.0

D) 1.0

17
New cards

A retrofit utilizing a slotted board dam can be used on projects with a larger drainage area than a retrofit utilizing perforated half round pipe.

A) True

B) False

B) False

18
New cards

A stream channel diversion can only be constructed on streams with a drainage area less than _________ acres.

A) 830

B) 725

C) 640

D) 500

C) 640

19
New cards

What may be used to construct a grade stabilization structure?

A) Rock

B) Cement

C) Wood

D) All of the above

D) All of the above

20
New cards

The apron for a storm drain outlet is designed to accommodate the storm water flow but the minimum length is ______ times the outlet pipe diameter.

A) 4

B) 5

C) 6

D) 8

C) 6

21
New cards

In jurisdictions where there is a local issuing authority (LIA) one NOI is submitted to the LIA and a second NOI is submitted to whom?

A) Nation Resource Conservation Service (NRCS)

B) Georgia Soil & Water Conservation Commission (GSWCC)

C) Department of Natural Resources (DNR)

D) Environmental Protection Division (EPD) District Office

D) Environmental Protection Division (EPD) District Office

22
New cards

When the entire project has undergone final stabilization the permittee must notify the EPD with which of the following?

A) A notarized statement of completion

B) A notarized statement of completion and a complete set of photographs of the project site

C) A Notice of Termination (NOT)

D) An affidavit from the LIA inspector stating that the project plan was complied with

C) A Notice of Termination (NOT)

23
New cards

Under an ES & PC Plan, how often should an inspection occur in areas where petroleum products are stored, used, or handled?

A) Daily

B) Weekly and after rainfall greater than 0.5 inches

C) Bi-monthly

D) Monthly

A) Daily

24
New cards

The components of an adequate erosion, sedimentation and pollution control plan around found in Part ______ of the General Permit.

A) 1

B) 2

C) 3

D) 4

C) 3

25
New cards

A buffer zone is required along the banks of state waters. How is it determined where to measure from on the stream bank?

A) From the center of the channel

B) From the area of wrested vegetation

C) From the area adjacent to the stream that is subject to overflow, as indicated by water loving plants

D) From the water side edge of plants growing in the water

B) From the area of wrested vegetation

26
New cards

The minimum buffer for a warm water stream is ______ feet.

A) 15

B) 25

C) 35

D) 50

B) 25

27
New cards

A single temporary sediment basin may not be utilized for a drainage area larger than ______ acres.

A) 225

B) 167

C) 150

D) 120

C) 150

28
New cards

A temporary sediment basin shall be designed by whom?

A) A certified design professional

B) The property owner/ operator

C) A person certified at Level 1A or 1B by GSWCC

D) A building inspector

A) A certified design professional

29
New cards

Only Geotextile material may be used as a filter under the apron of a storm drain outlet.

A) True

B) False

A) True

30
New cards

What is the purpose of a level spreader?

A) Discharges concentrated runoff at a non-erosive velocity

B) Diverts storm water into a stabilized channel

C) Filters sediment from storm water and release it as sheet flow

D) Conveys storm water down the face of a cut and fill slope

C) Filters sediment from storm water and release it as sheet flow

31
New cards

BMP

Best Management Practices

32
New cards

COE

US Army Corps of Engineers (Federal)

33
New cards

CWA

Clean Water Act (1972)

34
New cards

DNR

Department of Natural Resources (Federal)

35
New cards

EPA

Environmental Protection Agency (Federal)

36
New cards

EPD

Environmental Protection Division (State)

37
New cards

ES & PC Plan

Erosion, Sedimentation and Pollution Control Plan

38
New cards

FEMA

Federal Emergency Management Agency (Federal)

39
New cards

GESA

Georgia Erosion and Sediment Control Act (1975)

40
New cards

GSWCC

Georgia Soil & Water Conservation Commission

41
New cards

LDA

Land Disturbing Activity (Permitted by LIA or EPD)

42
New cards

LIA

Local Issuing Authority (Inspect/Enforce) Need MOA to review plans

43
New cards

MLRA

Major Land Resource Areas

44
New cards

NOI

Notice of Intent (Application for NPDES permit)

45
New cards

NOT

Notice of Termination (To end NPDES permit)

46
New cards

NPDES

National Pollution Discharge Elimination System

47
New cards

NTU

Nephelometric Turbidity Unit

48
New cards

O.C.G.A.

Official Code of Georgia Annotated

49
New cards

SWCD

Soil and Water Conservation District (State)

50
New cards

USDA

United States Department of Agriculture (Federal)