Battery on
PMCS, open manholes, gauge, reset meter, valves closed
Start Hemtt + HYP enabler/ PTO
4”x8’ to B and G
3”x3.5’ to C
D1 to A w/ 2 by 3 reducer + 3”x3.5’ to D1
Operation
Open D1
Open V3 + V1 TRM
Open V1, V17, V18 Hemtt
Push V6 ( high 5)
Push pump engagement Lever
HAV pump 5-10gal
v12 pre(15sec) then off
TC HI
Put low idle when done
Hose evac
Close V1+V3 TRM
HAV squeeze 5-10 gal
TC HI 3 min
Battle disconnect G port check for vacuum
Close V17+ turn off HI + cap
Pull pump Lever + release HAV
Close V1+V18 Hemtt
Remove 4”x8’ from B + dump in drip pan
Cap and stow
Close D1+ disconnect 3”x3.5’from A
Disconnect D1 + dump fuel + cap
Disconnect from C Hemtt + cap
Gauge + turn off+ after PMCS
TRM GPM
F: 20
UF: 25
PRM GPM
600GPM
V1
emergency shut off open first
V12
Precheck 15 sec then turn off