The purpose of the Code is to provide for all buildings and structures, a framework of \__________ to regulate and control their location, site, design, quality of materials, construction, use, occupancy, and maintenance.
5
New cards
BP 220
Economic and Socialized Housing Projects
6
New cards
safe construction
All buildings or structures as well as accessory facilities thereto shall conform in all respects to the principles of \__________.
7
New cards
suited to the purpose
All buildings or structures as well as accessory facilities thereto must be \__________ for which they are designed.
8
New cards
environmental safeguards
Buildings or structures intended to be used for manufacture and/or production of any kind of article or product shall observe adequate \__________.
9
New cards
safe, sanitary, and good working condition
Buildings or structures and ALL PARTS thereof as well as all facilities found therein shall be maintained in \__________.
10
New cards
addition
Any NEW CONSTRUCTION which increases the height or area of an existing building or structure.
11
New cards
agency of government
Refers to ANY of the various units of government including a department, bureau, office, instrumentality, or government owned or controlled corporation.
12
New cards
alteration
Works in buildings or structures involving CHANGES in materials used, partitioning, location or size of openings, structural parts, existing utilities and equipment but DOES NOT increase the building height and/or floor area.
13
New cards
application forms
A pre-formatted prescribed application form duly accomplishing and notarized by the respective design professional with validation matrices related to other building rules and regulations.
14
New cards
applicant or permittee
Any person, firm, partnership, corporation, head of government or private institution, organization of any character applying for the issuance of permits and certificates.
15
New cards
Building Official
The executive officer of the Office of the Building Official appointed by the Secretary.
16
New cards
building permit
A document issued by the Building Official to an owner or applicant to proceed with the construction, etc or other work activity of a specific project/building/structure or portions thereof after the accompanying principal plans, specifications, and other pertinent documents with the duly notarized application are found satisfactory and substantially conforming with the Code and its IRRs.
17
New cards
Code
PD 1096, otherwise known as the National Building Code of the Philippines.
18
New cards
construction
All ON-SITE WORK done from site preparation, excavation, foundation, assembly of all the components and installation of utilities and equipment of building or structures.
19
New cards
conversion
A change in the USE or OCCUPANCY of a building or structure or any portion/s thereof, which has different requirements.
20
New cards
demolition
The systematic dismantling or destruction of a building and structure, in whole or in part.
21
New cards
Department
The Department of Public Works and Highways (DPWH)
22
New cards
Executive Director
The executive officer of Head of the NBCDO.
23
New cards
moving
The TRANSFER of any building or structure or portion/s thereof from its original location or position to another, either within the same lot or to a different one.
24
New cards
Office of the Building Official
OBO; the office authorized to enforce the provisions of the Code and its IRR in the field as well as the enforcement or orders and decisions made pursuant thereto.
25
New cards
referral codes
The applicable provisions of the various agencies and technical professional codes that are supplementary to the Code.
26
New cards
renovation
Any physical change made on a building or structure to INCREASE its value, utilitu, and/or to improve the aesthetic.
27
New cards
repair
Remedial work done on any damaged or deteriorated portion/s of a building or structure to restore its ORIGINAL condition.
28
New cards
Secretary
Head or Chief Executive Officer of DPWH.
29
New cards
staff
The personnel of the NBCDO.
30
New cards
National Building Code Development Office
NBCDO
31
New cards
technical staff
The NBCDO created through DPWH Department Order, shall serve as the \__________ of the Secretary.
32
New cards
Accessibility Law
BP 344
33
New cards
Memorandum circulars
The Secretary has the power to issue and promulgate additional rules and regulations in the form of \__________ to implement the provisions of the Code.
34
New cards
appellate jurisdiction
The Secretary has the power to exercise \__________ over the decisions and orders of the BO.
35
New cards
Office of the President of the Republic
The order and decision of the Secretary shall be final and executory subject only to review by the \__________.
36
New cards
architect or civil engineer
No person shall be appointed as Building Official unless he is a duly registered \__________.
37
New cards
diversified and professional experience
No person shall be appointed as Building Official unless he has at least 5 years of \__________ in building design and construction.
38
New cards
seminar workshop
No person shall be appointed as Building Official unless he has attended and successfully completed a \__________ on PD1096 and its IRR conducted by the DPWH.
39
New cards
enforcement
The BO shall be primarily responsible for the \__________ of the provisions of the Code and its IRR, as well as circulars, memoranda, opinions and decisions or orders issued pursuant thereto.
40
New cards
control and/or supervision
The BO have overall administrative \__________ over all works pertinent to buildings or structures in his area of responsibility.
41
New cards
processing & issuance
The BO shall be charged with the \__________ of all permit applications and certificates as well as \__________ of the same.
42
New cards
annual inspections
The BO shall undertake \__________ of ALL buildings or structures and keep an up-to-date record of their status.
43
New cards
quarterly situational report
The BO shall submit a/an \__________ to the Secretary through the NBCDO in the status of ALL existing, on-going, and proposed public as well as private building or structure activities.
44
New cards
20%
The BO shall retain not more than \__________ of the income or collection derived from permit fees and other charges for the operating expenses of his office.
45
New cards
permanent record
Every BO shall keep a/an \__________ and accurate account of ALL FEES and other fixed and authorized to be collected and received.
46
New cards
traditional indigenous family dwelling
Dwelling intended for the use and occupancy by the family of the owner only and constructed of native materials the total cost of which does not exceed P15,000.
47
New cards
P10,000
The Secretary or his duly authorized representative may prescribe and impose fines not exceeding \__________.
48
New cards
Light Violations
• Failure to post Certificate of Occupancy/Use/Operation;
49
New cards
• Failure to post Building Permit construction information sign;
50
New cards
• Failure to provide or install appropriate safety measures.
51
New cards
Less Grave Violations
• Non-compliance with the work stoppage;
52
New cards
• Use or occupancy of building or structure without appropriate Certificate of Occupancy/Use/Operation.
53
New cards
Grave Violations
• Unauthorized change in the duly submitted plans;
54
New cards
• Unauthorized change in type of construction from more fire-resistive to less fire-resistive;
55
New cards
• Non-compliance with order to abate or demolish;
56
New cards
• Non-compliance with work stoppage order without permit;
57
New cards
• Change in the existing use or occupancy without Certificate of Change of Occupancy/Use/Operation.
58
New cards
• Excavations left open without any work being done in the site for more than 120 days.
59
New cards
10%
Surcharge for excavation for foundation.
60
New cards
25%
Surcharge for construction of foundation (including pile driving and laying reinforcing bars).
61
New cards
50%
Surcharge for construction of superstructure up to 2.00m above established grade.
62
New cards
100%
Surcharge for construction of superstructure above 2.00m.
63
New cards
P20,000
Fine for violating the provisions of the Code.
64
New cards
2 years
Imprisonment period for violating the provisions of the Code.
65
New cards
dangerous buildings
Those which are herein declared as such or are structurally unsafe or not provided with safe egress, or which constitute a fire hazard, or are otherwise dangerous to human life.
For accessory parts of the projects with very special functions or use which are indicated in the plans and specifications that accompany the building permit application.
68
New cards
minor construction & repair works
A building permit shall not be required for \__________; provides that these shall not violate any provisions of the Code and its IRR.
69
New cards
6 sqm
Minor construction: sheds, outhouses, greenhouses, children's playhouses, aviaries, poultry houses and the like, not exceeding \__________ in floor area.
70
New cards
20 sqm
Minor construction: addition of open terraces or patios resting directly on the ground, not exceeding \__________ in floor area, exclusively for private use of the owner.
71
New cards
not exceeding 500mm
Minor construction: garden pools for the cultivation of water plants and/or aquarium fishes \__________ in depth and exclusively for private use.
72
New cards
1.20m
Minor construction: garden masonry wall other than party walls not exceeding \__________ in height, footpaths, residential garden walks and/or driveways.
73
New cards
15 years
The engineer or architect who drew up the plans and specifications for a building or structure is liable for damages if within \__________ from the completion it would collapse due to defect in the plans or specifications or defects in the ground.
74
New cards
contractor
The engineer or architect who supervises the construction shall be solidarily liable with the \__________ should the edifice collapse due to defect in construction of the use of materials.
75
New cards
Geodetic Engineer
Prior to commencement of the proposed projects and construction an actual relocation survey shall be conducted by a duly licensed \__________.
76
New cards
10 days
Before commencing the excavation the person making or causing excavation to be made shall notify in writing the owner of adjoining property not less than \__________ before such excavation is to be made.
77
New cards
logbook of daily construction activities
The supervising architect or civil engineer shall keep at the job site at all times a/an \__________.
78
New cards
Certificate of Occupancy
No building or structure shall be used until the BO has issued a/an \__________ therefore as provided in the Code.
79
New cards
partial Certificate of Occupancy
A/An \_________ may be issued for the use or occupancy of a portion/s of a building or structure prior to the completion of the entire building or structure.
80
New cards
duly licensed and registered contractor
When the construction is undertaken by contract, the work shall be done by a/an \__________ pursuant to the provisions of RA 4566.
81
New cards
Contractor's License Law
RA 4566
82
New cards
Notice of Construction
The owner or permittee shall submit a duly accomplished prescribed \___________ to the OBO prior to any construction activity.
83
New cards
Building Permit sign
The owner or permittee shall put a \_________ which complies with the prescribed dimensions and information.
84
New cards
inspection and supervision
The owner of the building who is issued or granted a building permit under the Code shall engage the services of a duly licensed architect or civil engineer to undertake full time \__________ of the construction work.
85
New cards
Certificate of Completion
Upon completion of the construction, the licensed architect or civil engineer shall also prepare and submit a/an \__________.
86
New cards
Requirements for application of certificate of occupancy
• Certificate of Completion;
87
New cards
• Construction logbook (signed & sealed);
88
New cards
• As-built Plans & Specs;
89
New cards
• Building Inspection Sheet (signed by contractor & inspecting architect or civil engineer).
90
New cards
Fire Safety Inspection Certificate
A notification to conduct final inspection shall be endorsed by the OBO to the C/MFM and BFP, who shall issue a/an \__________.
91
New cards
Fire Code of the Philippines
PD 1185
92
New cards
Type I
Wood construction.
93
New cards
Type II
Wood construction with protective fire-resistant materials and one-hour fire resistive throughout except, that permanent non-bearing partitions may use fire-retardant treated wood within the framing assembly with one-hour resistivity.
94
New cards
Type III
Masonry and wood construction. Structural elements may be any of the materials permitted by the Code provided, that the building shall be one-hour fire-resistive throughout. Exterior walls shall be of incombustible fire-resistive construction.
95
New cards
Type IV
Steel, iron, concrete or masonry construction and walls, ceilings and permanent partitions shall be of incombustible fire-resistive construction, except, that permanent non-bearing partitions of one-hour fire resistive construction may use fire retardant treated wood within the framing assembly.
96
New cards
Type V
Four-hour fire-resistive throughout and the structural elements shall be of steel, iron, concrete, or masonry construction.
97
New cards
type of construction
No change shall be made in the \__________ of any building which would place the building in a differennt sub-type or type unless such building is made to comply with the requirements for such.
98
New cards
flame-spread characteristic
Finishes for interior walls and ceilings of any building shall be classified according to their \__________ using generally accepted engineering standards.
99
New cards
smoke density
The \__________ of interior walls and ceilings should NOT be greater than that obtained from burning of untreated wood under similar conditions.
100
New cards
frames and trim of doors and windows
Requirement for flame-spread characteristics of finishes shall NOT apply to \__________.