1/287
Looks like no tags are added yet.
Name | Mastery | Learn | Test | Matching | Spaced | Call with Kai | Chat |
|---|
No analytics yet
Send a link to your students to track their progress
Life Cycle Assessment (LCA)
a cradle-to-grave method to quantify product or building impacts
phases of LCA
raw material extraction —> manufacturing —> transportation —> use —> end of life
Life Cycle Cost (LCC)
cost of green buildings & advantages of investing in more efficient building products or systems
What is considered in LCC?
initial costs, hard costs (physical things), soft costs (paperwork/fees), operating costs, maintenance costs
Triple Bottom Line
a business concept that pushes firms to measure their social and environmental impact, in addition to their financial performance (3 P’s: people, planet, profit)
LEED
A green building rating system by USGBC that evaluates sustainability and awards certification
USGBC
A membership-based non-profit organization that promotes sustainable design & construction
GBCI
An organization that performs third party reviews and administers LEED certifications and credentials
LEED Online
project teams use this to manage the LEED certification process
LEED Rating Systems
BD+C, ID+C, O+M, ND, Homes, Cities & Communities, LEED Recertification, LEED Zero
credits
are optional; earn points
prerequisites
are required; no points
CIR
A formal project-specific inquiry when guidance isn’t clear
Interpretation
published clarifications on LEED requirements for broad use
Waste Management
Use less waste (SOURCE REDUCTION), reuse existing buildings or portions, recycling, consider new technology, compost
Environmental Product Declarations (EPD)
a declaration given for green building products, which assesses the life cycle impact of a product
Multi-attribute
Evaluate products across several criteria areas, not one
Five criteria areas for MATERIALS & RESOURCES
Climate Health (EPD)
Human Health (HPD)
Ecosystem Health (FSC)
Social Equity (JUST Label)
Circular Economy (Recycled content)
Documentation (proof)
Third-party certifications, ecolabels, declarations
Circularity
Reuse, recycled content, take-back, durability, and design for material loops
Recycled content (pre/post):
pre-consumer: material with percentage content from factory scrap
post-consumer: material with percentage content from consumer waste
Responsible sourcing
credible certifications (ex: FSC) for ethical supply chains
Health-related ingredients
Assess hazards (ex: HPDs, restricted substances like asbestos)
Source separated
recovered construction materials, sorted and sent to a recycler (100%) counted
Salvaged
recovered for reuse instead of being thrown or recycled (200% counted)
Alternative daily cover/vegetated waste
Do not count in diversion calculations
Operational Carbon
Emissions from running a building (energy use and refrigerants)
Electrification
Replacing on-site fossil fuel systems with electric alternatives to cut operational carbon
PM (particulate matter)
a type of air pollutant (solid and liquid) suspended in the air
PM10: dust from roads, construction, pollen, mold
PM2.5: smoke from vehicles, industrial emissions, burning wood, wildfire smoke
Rating system
A framework of prerequisites and optional credits used to evaluate a project’s sustainabilty
Arc
A platform to register projects and track performance data used for LEED certification
LEED project boundary
The portion of the site submitted for LEED certification
Development footprint
The area of the site impacted by construction, including building, landscape, and parking
Greenfield
Previously undeveloped land, often sensitive; avoid or protect it in LEED
Previously developed site
Land that has been built on or has been disturbed by human activity
Embodied Carbon
Emissions associated with materials extraction, manufacturing, transport, and end-of-life
Environmental Product Declaration (EPD)
A verified document reporting a product’s life-cycle impacts
Heat Island
Higher temperatures in developed areas due to heat-absorbing materials and low vegetation
Albedo/Solar Reflectance
A surface’s ability to reflect sunlight; 0 absorbs, 1 reflects
Solar Reflectance Index (SRI)
A measure of a surface’s ability to reject solar heat (reflectance + emissivity)
Xeriscaping
Landscape design that reduces irrigation through native/adaptive plants and efficient systems
Low-impact development
Site design that manages stormwater with features like bioswales and green roofs
Green Infrastructure
Natural Systems like tree canopy, wetlands, and vegetated buffers that manage water
Biophilic Design
Design that connects people with nature to support health and well-being
SMACNA practices
Construction IAQ guidelines that help control dust, moisture, and pollutants during work
ASHRAE 62.1
A standard for ventilation and acceptable indoor air quality
ASHRAE 55
A standard for thermal comfort conditions used in LEED credits
Owner’s Project Requirements (OPR)
The goals and requirements the design must meet, used in commissioning
Basis of Design (BOD)
The technical approach and design that meets the OPR and project goals
green leases
Leasing terms that align owner and tenant actions for energy, water, and health outcomes
tenant guidelines
instructions for tenants to maintain building sustainability features and performance
Regional Priority
location-specific credits prioritized for extra points in LEED
LEED reference guides
official guidance for implementing prerequisites and credits
Scorecard
A checklist used by teams to plan targeted prerequisites and credits
Who develops LEED and who reviews projects?
USGBC; GBCI
Project registration
enroll a project, pay fees, and access submission on Arc
Why define the LEED project boundary carefully
to include all relevant scope and avoid excluding areas to gain advantage
Why use scorecard early?
to align goals, select strategies, and set expectations for certification
Who manages documentation on a LEED project?
typically the LEED administrator
When should a design charette occur?
pre-design/schematic
What are OPR and BOD used for?
to define goals and verify design/commissioning to meet them
addendum (LEED)
an official update or correction to the rating system or guidance
Why pursue third-party verification?
Increases credibility and ensures requirements are met
permanent location MPR
projects designed to move (boats/mobile) are ineligible for LEED
Why are reasonable LEED project boundaries required?
to not exclude difficult areas
why is project size an MPR?
ensures meaningful scope and performance tracking
What is development footprint used for?
to assess site impacts like grading, paving, and landscaping
property boundary
the legal perimeter of the site under control of the owner
What happens after registration is paid?
team gains access in Arc to manage documentation and reviews
preliminary review
the first GBCI round with comments and pending decisions
final review
a follow-up submission addressing comments that leads to a certification decision
appeal in LEED
a paid resubmission to contest a denied prerequisite or credit
Why keep record of project documents?
To verify claims like EPDs, HPDs, and certifications at review
Who typically leads the LEED strategy?
The owner and design team set goals; LEED APs guide compliance
How do integrative workshops help
They reveal cross-credit synergies and reduce rework
Commissioning (LEED)
a process to verify systems meet OPR and operate as intended
Why include contractors in LEED planning?
to align specs, submittals, and practices with credits and prerequisites
How are prerequisites verified?
By submitting forms, narratives, and documentation to GBCI
Decarbonization (LEED)
Reducing on-site combustion, improving efficiency, and managing refrigerants
Why track performance data?
to find saving, verify outcomes, and support recertification
innovation strategy
a novel sustainable practice not directly addressed by an existing credit
pilot credits
provisional strategies teams can try; feedback informs future updates
Regional Priority points
Achieving specified local credits yields extra points
Why use previously developed sites?
To limit habitat loss and protect sensitive lands
Why protect greenfield areas?
To conserve habitats and preserve ecosystem functions
Why plan for equity in projects?
To improve access, health, and benefits for local communities
Why limit light pollution?
to protect night skies and wildlife while maintaining safety
What does leak protection enable?
faster response to anomalies and reduced water waste
Why submeter end uses?
to pinpoint where energy or water is used and target savings
Why prioritize native plants?
to support biodiversity and reduce irrigation needs
tree canopy value
shade lowers heat islands, cools microclimates, and improves comfort
reflective roofing
to reduce heat gain and mitigate heat islands
infiltration testing
reduces air leakage and peak loads (energy savings)
energy modeling
to estimate site energy and evaluate efficiency strategies
What does energy modeling help project teams compare?
The performance of different design options to identify the most energy-efficient solutions
green lease
a lease that aligns owner and tenant to meet sustainability goals
embodied carbon data
to inform lower-carbon material choices
tenant guideline
a document guiding occupants to maintain sustainability features
pre-submittal QA review
to catch documentation gaps before GBCI review