From a hydraulic perspective, a bridge is part of a stream crossing system that includes the approach roadway across the __________ and any openings.
floodplain
The approximate river width, B, is determined by the formula __________, where c is a coefficient ranging from 0.5 to 0.8.
B=(c)Q3/4
The desirable minimum bridge span length, L, is calculated using the formula __________, where Q is discharge.
L=20+0.005Q
Vertical clearance between the Design Flood Level (DFL) and the soffit of the lowest member shall not be less than __________ for rivers carrying debris.
1.50m
The formula used to calculate vertical clearance for navigable channels is __________, where HV is the height of the vessel.
VerticalClearance=HWL+HV+K
The __________ is the most commonly used equation for determining the time of concentration (tc) in hydrologic analysis.
KIRPICH FORMULA
According to the Rational Formula, the discharge Q is equal to __________, where A is the catchment area in km2.
3.6CIA
The __________ equation is used to compute the Design Flood Level (DFL) by calculating velocity as V=n1R2/3S1/2.
Manning’s roughness coefficient
For an Expressway, the minimum required Design Flood frequency for a river bridge is __________.
100yr
For a National Road, the minimum required Check Flood frequency for bridge scour is __________.
500yr
The __________ component of a bridge provides horizontal spans such as deck and girders and carries traffic loads directly.
superstructure
The __________ is the structure at the two ends of a bridge used for transferring loads to the foundation and providing lateral support to the embankment.
Abutment
A __________ bridge is one where the concrete deck slab works in conjunction with steel girders to support loads as a united beam.
Composite Girder
In a __________ bridge, the roadway is installed in between the top and bottom of the main girder, placing traffic completely inside the structural envelope.
Half-through
A __________ bridge is a structure where the superstructure is not perpendicular to the substructure.
skewed
Department Order No. __________ Series of 2020 prescribes guidelines on the design of bicycle facilities and the inclusion of bike lanes in bridge plans.
88
For geotechnical investigation of bridges, at least one borehole must be conducted at the proposed location of each __________ and __________.
abutment; pier
The minimum depth of a boring for a bridge foundation is __________ in ordinary soil if the foundation type is not yet identified.
30m
__________ scour is a lowering by erosion of the channel bed that occurs irrespective of the existence of the bridge.
General
An __________ number of spans is preferably used to avoid placing a pier at the center of a river with rapid stream flow or high debris loads.
odd
The maximum spacing for bridge drains on the deck should be __________.
5m
The vertical clearance above a highway roadway on a bridge shall not be less than __________, with an additional 0.15m for future resurfacing.
4.88m
The minimum width of a pedestrian sidewalk for a bridge in an urban area is __________.
1200mm
For reinforced concrete bridges, the span range for a precast slab or flat slab is typically __________ to __________.
6.0m;12.0m
A heavy vehicle violates the law if it exceeds the permissible single axle load of __________ as stipulated in RA 8794.
13,500kg
The __________ analysis is used for calculating active seismic earth pressure during earthquake conditions.
Mononobe-Okabe
Level 1 Earthquake Ground Motion considers seismic hazard from small to moderate earthquakes with a service life probability of a __________ return period.
100-year
Seismic Performance Level __________ (SPL-1) ensures the bridge keeps its sound function and resists seismic forces within the elastic limit.
1
Ground Type __________ (Site Class) is characterized by a characteristic value of ground TG≥0.6s and is considered soft ground.
III
The __________ is a non-destructive method of evaluating the condition of piles by locating discontinuities such as voids or changes in cross-section.
Pile Integrity Test (P.I.T.)
The __________ or Modified Hiley's Formula is used in the DPWH specifications to compute the ultimate capacity of piles based on hammer blows.
Hiley's Formula
__________ are devices installed between the superstructure and substructure to transfer loads and provide room for rotational and translational movements.
Bridge Bearings