This set of vocabulary flashcards covers the fundamental terminology, project workflows, and standard documentation procedures used in construction measurement and quantity surveying as discussed in the Chapter 1 lecture.

Last updated 8:58 AM on 7/27/26
Name
Mastery
Learn
Test
Matching
Spaced
Call with Kai
Chat

No analytics yet

Send a link to your students to track their progress

20 Terms

1
New cards

BOQ (Bill of Quantities)

A structured and detailed document defining the quality and quantity of the work required for the erection of a building by contract.

2
New cards

Trade

Specific work categories such as concrete, formwork, tiling, or masonry that are combined to construct a building element.

3
New cards

Element

A visible component of a building, such as a slab or an external wall, composed of various trades.

4
New cards

Tendering

The procurement process used to select the best contractor to execute a construction project based on project information and bids.

5
New cards

AIQS

The Australian Institute of Quantity Surveyors, the professional body that holds the copyright for the standard measurement rules used in buildings.

6
New cards

CESMM

The Civil Engineering Standard Method of Measurement, which is used for infrastructure projects including roads, utilities, and bridges.

7
New cards

Plan

A construction drawing showing a view of a floor as seen from above, also known as a bird's-eye view.

8
New cards

Elevation

A drawing representing how a building looks from a specific direction, such as north, south, east, or west.

9
New cards

Section

A detailed drawing showing the internal view of a building component by representing a cut through it at a specific point.

10
New cards

Setting out

The physical site activity where the contractor transfers the design from drawings into the real world to begin construction.

11
New cards

Structural design

A specialized design detailing beams, columns, trusses, and how building loads are transferred to the substructure.

12
New cards

Specification

A document providing quality information, material standards, and technical requirements that are not visible in drawings.

13
New cards

Schedules

Documents providing specific lists and details for building components such as doors, windows, and floor finishes.

14
New cards

Drawing register

A record maintained to track every revision of project drawings from the initial design through construction.

15
New cards

Principal

The Australian contractual term for the client, employer, or owner who funds the project.

16
New cards

Price

A numerical value defined in construction as the calculation of Cost+ProfitCost + Profit.

17
New cards

Preliminaries

Items associated with legal, contractual, and temporary site services (like site huts, bonds, and guarantees) rather than specific trade work.

18
New cards

Takeoff

The process of extracting and calculating quantities from drawings and specifications to prepare a Bill of Quantities.

19
New cards

Girth calculation

A basic mathematical calculation of the total length around a plan or building footprint.

20
New cards

Variation

A post-contract process that addresses changes in work or costs due to unforeseen conditions, such as unexpected soil profiles.