Admin (Potential) LCO

ALCO shall not be made unless IN the current applicability or applicability can be DIRECTLY entered

Examples:

IN: MODE 1 and only one containment sump channel goes INOP

DIRECTLY: A MODE 3 restrictive LCO is applicable at full power, the direct transition would be a scram

2
New cards

Loss of Safety Function

“Assuming no concurrent single failure, a safety function within the accident analysis cannot be performed”

3
New cards

LCO Documentation

<12hrs

Longer

<12hrs: eSOMS, flag as open if through turnover

Longer: eSOMS include:
Action statement, TS/TRM entered, LOSF eval required (result)

4
New cards

LCO Tracking Record Responsibilities

Any licensed operator may generate the record, but the Shift SUPERVISOR is responsible for performance