1/58
Vocabulary flashcards based on lecture notes covering engineering management, organizational resources, management tiers, SWOT analysis, planning process, SMART rule, project work plan, dependencies, estimating methods, and schedule compression techniques.
Name | Mastery | Learn | Test | Matching | Spaced | Call with Kai | Chat |
|---|
No analytics yet
Send a link to your students to track their progress
Engineering Management
A specialized discipline that blends the technical, analytical problem-solving capabilities of engineering with the organizational and resource-coordinating functions of business administration.
Efficiency
Means of executiom.
Effectiveness
Ends or final outcome.
Human Resources
Labor, service, and managerial talent.
Financial Resources
Monetary; capital, credit, and cash flow.
Physical Resources
Tangible assets; raw materials, production equipment.
Information Resources
Data, drawing, technical specifications, and project documents.
Construction Manager
Has the core responsibility of guiding, directing, administering, and coordinating resources to achieve organizational and project goals.
Vision
Clear, comprehensive snapshot of an organization at somepoint in the future.
Mission
Kind of business an organization wants to undertake.
Values
Moral guide.
Planning (Management Function)
Defining project objectives.
Organizing (Management Function)
Activites, roles and hierarchy.
Leading (Management Function)
Motivating, influencing, and directing.
Controlling (Management Function)
Monitoring actual progress.
Strategic Planning (Top Level Management)
Broad objectives and broad policies of the organization and prepares high-level strategic plans.
Resource Allocation (Top Level Management)
Controls and coordinates finances and materials.
Outside-World Relations (Top Level Management)
Maintaining contact and negotiating contracts with the outside world.
Structural Oversight (Top Level Management)
Appoints the executive managers for the middle-level tier.
Middle-Level Management (Tactical Tier)
Vital bridge between corporate strategy and field execution.
Plan Execution (Middle Level)
Execute the tactical plans of the organization.
Sub-Unit Planning (Middle Level)
Localized project plans and schedules.
Policy Interpretation (Middle Level)
Interpret and explain broad policies from top-level management.
Talent Development (Middle Level)
Training, and performance evaluation of lower-level management.
Inter-Departmental Coordination (Middle Level)
Responsible for coordinating activities.
Task Assignment (Lower Level)
Assign specific daily jobs and tasks.
Daily Instruction (Lower Level)
Guide, train, and instruct workers on active day-to-day construction site activities.
Quality and Quantity Control (Lower Level)
Directly responsible for the quality as well as quantity of physical production on-site.
Communication Conduit (Lower Level)
Communicate workers' problems, suggestions, and appeals up to middle management.
Safety and Relations (Lower Level)
Maintain good relations and safety discipline on the active construction site.
Strategic Plan
High level document explaining the organization's vision, mission, and values.
SWOT Analysis
Method used to assess strength, weakness, opportunity, and threat.
Strength (SWOT Analysis)
Internal, helpful.
Weakness (SWOT Analysis)
Internal, harmful.
Opportunity (SWOT Analysis)
External, helpful.
Threat (SWOT Analysis)
External, harmful.
The Choice of Technology
Construction methods, equipment, and structural systems.
The Definition of Work Tasks
Decomposing he overall project scope into manageable activities.
Resource Estimation
Quantifyiny the labor, materials, equipment, and budget.
Dependency Identification
Establishing the logical, structural, and regulatory sequences.
Quality (Elements of Concern)
Level of performance, material grade, and workmanship standards.
Scope (Elements of Concern)
Fixed, quantifiable amount of physical work to be performed.
Time (Elements of Concern)
Assigning durations to tasks and establishing a logical schedule network.
Cost (Elements of Concern)
Monetary baseline.
Specific (SMART Rule)
Get into the details, written in clear, concise, and understandable terms.
Measurable (SMART Rule)
Must use quantitative language.
Acceptable (Agreed to) (SMART Rule)
Agreed to upon by the key stakeholders.
Realistic (SMART Rule)
Focused on physical and financial realities.
Time-bound (Time-based) (SMART Rule)
A firm due date or completion timeline.
Project Work Plan
Primary tactical document.
Mandatory Dependency
Contractually required.
Discretionary Dependency
Based on practice and safety preference.
External Dependency
Relationship between project activities and non project activities.
Internal Dependency
Relationship strictly between to project activities in the organization.
Analogous Estimating
Historical data.
Parametric Estimating
Mathematical and algorithm.
Multipoint Estimating
Optimistic, pessimistic, and most likely.
Crashing
Shortening task durations.
Fast-Tracking
Performing activities in parallel.