MGSC 346 - Chp. 5 Quality Management and Six Sigma

0.0(0)
Studied by 1 person
call kaiCall Kai
Locked
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
GameKnowt Play
Card Sorting

1/28

flashcard set

Earn XP

Description and Tags

Last updated 11:29 PM on 4/15/24
Name
Mastery
Learn
Test
Matching
Spaced
Call with Kai
Chat

No analytics yet

Send a link to your students to track their progress

29 Terms

1
New cards

Quality Decisions Required by Every Firm

the reputation that they want to have as far as delivered quality and relative price in industry

2
New cards

Quality Reputation

Higher delivered quality, higher relative price

3
New cards

Good Value = Q/P

Higher delivered quality, lower relative price

4
New cards

Cheap; economical

Lower delivered quality, lower relative price

5
New cards

Rip off; not sustainable

lower delivered quality, higher relative price

6
New cards

Quality Target

TQM 100% Quality, or Six Sigma 99.999% Quality, 99% target still allows for profits

7
New cards

Quality Standards for research and development

using to cater to what consumers want, ex. apple designers sought simplicity not complexity in the design of iMac, iPod, iPhone, and iPad.

8
New cards

Quality Standards for Consistency

Ensuring that customers are able to maintain an experience throughout different locations, ex. Motel 6, or fast food restaurants like McDonalds.

9
New cards

Quality Standards for Accountants

to determine what % defects can we have and still remain profitable?

10
New cards

Quality Standards for Lawyers

to determine what % defects we can have without too much legal risk?

11
New cards

Total Quality Management (TQM)

managing the entire organization so that it excels on all dimensions of products and services that are important to the customer

Goal is 100% quality

12
New cards

Costs of Quality (COQ)

Pay now or later

13
New cards

Appraisal Costs

costs of inspection, testing, and other tasks to ensure that the product or process is acceptable

14
New cards

Prevention Costs

sum of all the costs to prevent defects

15
New cards

Internal Failure Costs

to save $ here, results in higher external$

Costs for defects incurred within the system: scrap, rework, repair

16
New cards

External Failure Costs

to reduce this, have to increase internal $

Costs for defects that pass through the system. After item in marketplace

17
New cards

ISO 9000

Quality Management principles: (TQM, Six Sigma)

  • Customer focus

  • Leadership

  • Involvement of people

  • Process Approach

  • Continual Improvement

  • Factual approach to decision making

  • Mutually beneficial supplier relationships

18
New cards

ISO 14000

environment management standards

  • more than 350 standards for monitoring the quality of air, water, and the soil

  • strategic approach - requirements of an environmental management system

  • Development of profitable environment-friendly products and services; reduce waste assembly and packaging. reverse logics.

19
New cards

Six Sigma Quality

the quality goal of no more than 3.4 defects out of every million units

  • the philosophy and set of methods companies use to eliminate defects in their products and processes

20
New cards

DMAIC Methodology (Define)

Identify customers and their priorities, a project suitable for Six Sigma efforts and CTQ’s (Critical-to-quality Characteristics)

21
New cards

DMAIC Methodology (Measure)

Determine ow to measure the process and how it is performing and identify the key internal processes that influence CTQ’s

22
New cards

DMAIC Methodology (Analyze)

determine the most likely causes of defects and identify the key variables

23
New cards

DMAIC Methodology (Improve)

Identify means to remove the causes of defects, confirm the key variables, identify the maximum acceptance ranges of the key variables

24
New cards

DMAIC Methodology (Control)

Determine how to maintain the improvements and put tools in place to ensure they they key variables remain within maximum acceptance ranges

25
New cards

Pareto Chart

80/20 rule 20% defects from 20% of causes

26
New cards

Cause-and-effect diagram (fishbone diagram)

can add $ to fix causes and % of defects by cause

27
New cards

Process Control Chart

Stds ± Tolerances UCL LCL

28
New cards

Producer’s risk

rejecting a good lot

29
New cards

Consumer’s Risk

Accepting a bad lot